7 permits
- Records on file
- 7
Built (as contractor)
7 entries
- Issued May 6, 2026
Addition and/or Alterations · FOR THE REMOVAL AND REPLACEMENT OF ONE (1) HVAC RTU, FOR THE INSTALLATION OF NEW GRDs WITH ASSOCIATED DUCTWORK, AND FOR THE INSTALLATION OF FUEL GAS PIPING SERVING THE RTU AND COMMERCIAL KITCHEN APPLIANCES AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND 2018 IFGC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. SEE CP-2025-004658 FOR ASSOCIATED BUILDING PERMIT.
- Issued Mar 26, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans. *CONTRACTOR IS A SOLE PROPRIETOR WITH NO EMPLOYEES* *RP-2026-002249* Installation of new heating and air conditioning systems and ductwork. 80,000 btu 80% 3ton coil 3 ton condenser
- Issued Mar 13, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. 80K BTU 80% furnace, 3 ton AC, ductwork, and 10 diffusers
- Issued Mar 9, 2026
Addition and/or Alteration · For alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations, underpinning and excavations (i.e., digging in basement). Any work/alterations to the basement/cellar are expressly pro
- Issued Mar 2, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required.
- Issued Feb 10, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 20, 2025
3 units
Addition and/or Alteration · PARTIAL DEMOLITION OF THE ONE-STORY REAR PORTION OF EXISTING STRUCTURE.INTERIOR ALTERATION AND ERECTION OF TWO-STORY VERTICAL ADDITION ON AN EXISTING ATTACHED STRUCTURE (SIZE AND LOCATION AS SHOWN ON PLAN/APPLICATION). ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING & FIRE SUPPRESSION WORK**
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.