Entity File · The Public Record
Owner of record
Hhlp Rittenhouse Assoc Ll
7 permits · 19 violations
- Records on file
- 26
Permits (as owner)
7 entries
- Issued Oct 23, 2026
Shelter/Platform · SHELTER PLATFORM PERMIT- Erection of sidewalk shelter platform 44 l.f. on W Rittenhouse Sq. with the deck at 300 P.S.I. each as per Engineered Plans. Streets Department permit SR-2026-036617
- Issued Sep 10, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Nov 5, 2025
Addition and/or Alterations · Replacement of 5 water source heat pump units.
- Issued Oct 3, 2025
Addition and/or Alteration · New electrical wiring throughout, lighting, switches, receptacle, interconnected smoke detectors, new 120 volts interconnected smoke detectors, provide low voltage wiring for window shades and install new AFC/GFCI breakers to (2) existing 200 amps, provide power for kitchen appliances and HVAC equipment as per 2017 NEC
- Issued Sep 3, 2025
Alterations · Plumbing Permit (Interior) for combo CP-2025-003760
- Issued Aug 12, 2025
Addition and/or Alteration · Electrical Permit for combo CP-2025-003760
- Issued Aug 7, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING CONDOMINIUM UNIT (#1701) IN THE EXISTING GROUP R-2 MULTI-FAMILY HIGH-RISE BUILDING AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC AND PHC APPROVAL. SEPARATE PERMITS TO BE OBTAINED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.
Violations
19 entries
- Violation Oct 29, 2026OPEN
HANDRAILS & GUARDS
- Violation Oct 29, 2026OPEN
STORAGE IN BUILDINGS
- Violation Oct 29, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Oct 29, 2026OPEN
FDC INSPECTION, TESTING & MAINTENANCE
- Violation Oct 29, 2026OPEN
LABELING
- Violation Oct 29, 2026OPEN
EXTENSION CORDS
- Violation Oct 29, 2026OPEN
HIGH-RISE BUILDING
- Violation Oct 29, 2026OPEN
RENTAL LICENSE- HOTEL (R1)
- Violation Oct 29, 2026OPEN
UTILITY IDENTIFICATION
- Violation Oct 29, 2026OPEN
EXIT DOORS
- Violation Oct 29, 2026OPEN
WASTE & LINEN CHUTES
- Violation Oct 29, 2026OPEN
PENETRATIONS MAINTAINING PROTECTION
- Violation Oct 29, 2026OPEN
STAIRWAYS IN THE MEANS OF EGRESS
- Violation Oct 29, 2026OPEN
PLUMBING SYSTEMS- SANITARY MAINTENANCE
- Violation Feb 26, 2025OPEN
HAZARDOUS MATERIALS
- Violation Feb 26, 2025OPEN
FOOD - LARGE ESTABLISHMENT LICENSE
- Violation Feb 26, 2025OPEN
PUBLIC PARKING LOT LICENSE
- Violation Feb 26, 2025OPEN
HIGH-RISE BUILDINGS
- Violation Feb 26, 2025OPEN
DAMPER CERTIFICATION REPORT
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 7, 2026.