Entity File · The Public Record
Company / LLC
Horizon House INC
1 sold · 9 permits
- Records on file
- 10
Sold
1 entry
Permits (as owner)
9 entries
- Issued Jul 6, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 208 existing sprinkler heads
- Issued Jul 1, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Installation of (4) ANSUL R-102 pre-engineered, wet chemical kitchen fire suppression systems into kitchen hoods at Home Appetite.
- Issued May 21, 2026
Alterations · ALTERATIONS TO COMMERCIAL KITCHEN AND CAFE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Apr 24, 2026
Addition and/or Alteration · Install panels, Generator, ATS, interior lighting and lighting controls, power devices, feeds and connections for mechanical and refrigeration equipment . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **NO FIRE ALARM ON THIS PERMIT**
- Issued Apr 14, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF SIX (6) TYPE 1 KITCHEN HOODS WITH ASSOCIATED DUCTWORK. **ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **
- Issued Mar 2, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Mar 2, 2026
1 units
Addition and/or Alteration · FOR LEVEL III ALTERATIONS AND CHANGE OF OCCUPANCY PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Sep 16, 2025
Temporary Tents and Canopies · ASSEMBLY USE TENT - LAWFUL OCCUPANCY SHALL BE AS POSTED - REMOVAL DATE ELECTRICAL PERMIT REQUIRED, UNLESS POWER IS PROVIDED THROUGH EXISTING EXTERIOR GROUND FAULT PROTECTED RECEPTACLES AND POWER CORDS ARE RATED EXTRA HEAVY DUTY WITH U. L. LABEL STATING SUCH RATING. NO COOKING OR HEATING PERMITTED WITH THIS APPROVAL. IF TENT IS NOT READY FOR INSPECTION TO INCLUDE ELECTRICAL COMPONENTS, AN ADDITIONAL WILL BE APPLIED FOR ANY AFTER HOURS INSPECTION WITH POSSIBLE ISSUANCE OF CODE VIOLATION NOTICES.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.