Hunter Roberts Holdings LLC
16 permits
- Records on file
- 16
Built (as contractor)
16 entries
- Issued Jul 9, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.
- Issued Jul 6, 2026
1 units
Addition and/or Alteration · FOR A TENANT FIT-OUT TO A PORTION OF AN EXISTING STRUCTRURE. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**
- Issued Jun 3, 2026
1 units
Addition and/or Alteration · FOR PHASE 1A WORK (LEVEL II INTERIOR ALTERATIONS AND PARTIAL DEMOLITION) OF THE UNIVERSITY OF PENNSYLVANIA CLASS OF 1920 COMMONS BUILDING (BIN #1435258) WITHOUT A CHANGE IN USE & OCCUPANCY CLASSIFICATION AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IEBC AND PHC APPROVAL. EXISTING BUILDING IS SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. SEE ZP-2026-002461 FOR ASSOCIATED ZONING APPROVAL. **SEPARATE PERMITS REQUIRED FOR FUTURE PHASES O
- Issued May 12, 2026
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING SPACE. ALTERATIONS TO INCLUDE THE REPLACEMENT OF SLABS AND NEW DRAINS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Mar 27, 2026
1 units
New Construction · FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH SECOND FLOOR ROOF DECK (ACCESSED VIA WALL OPENINGS). BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION. *NO EXCAVATION GREATER THAN 5FT, OTHERWISE SEPARATE EXCAVATION PERMIT IS REQUIRED.*
- Issued Mar 23, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE EXTERIOR WORK, REPLACE EXISTING WINDOWS, STOREFRONT, AND LOUVERS IN EXISTING OPENINGS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Mar 13, 2026
336 units
Addition and/or Alteration · FOR LEVEL III ALTERATIONS TO AN EXISTING RESIDENTIAL HIGH-RISE APARTMENT BUILDING WITH 336 DWELLING UNITS (R-2 OCCUPANCY). ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **ASBESTOS REMEDIATION REQUIRED**
- Issued Mar 11, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN EXISTING NON-SEPARATED GROUPS B AND A-3 OCCUPANCY CLASSIFICATIONS AT THE LOWER LEVEL OF THE MCNEIL BUILDING. EXISTING BUILDING IS SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. **ASBESTOS ABATEMENT REQUIRED**
- Issued Feb 27, 2026
622 units
Addition and/or Alteration · PERFORMANCE COMPLIANCE ALTERATIONS TO INCLUDE INTERIOR MEZZANINE ADDITIONS AND PARTIAL CHANGE OF OCCUPANCY TO CREATE SIX HUNDRED TWENTY-TWO (622) DWELLING UNITS ON THE SIXTH THROUGH TWELFTH FLOOR OF AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS AND BBS VARIANCE MI-2025-005856. EXISTING BUILDING FULLY SPRINKLERED PER NFPA 13 AND INCLUDES STANDPIPES PER NFPA 14. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** AMENDMENT APPROVED 5/10/26 AMEND ALTERATIONS PER
- Issued Feb 10, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE STRUCUTRAL WORK, NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.
- Issued Feb 10, 2026
1 units
Addition and/or Alteration · LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EVENT ASSEMBLY FACILITY ON THE 9TH FLOOR OF AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Feb 9, 2026
1 units
Addition and/or Alteration · LEVEL I EXTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR PARTIAL DEMOLITION AND INSTALLATION OF WINDOWS TO AN EXISTING STRUCTURE. AS PER APPROVED PLANS. *********************************SEPARATE PERMITS FOR ANY OTHER WORK. *************************
- Issued Jan 20, 2026
448 units
Addition and/or Alteration · LEVEL III ALTERATIONS (NO CHANGE OF OCCUPANCY) TO INCLUDE PARTIAL DEMOLITION AND GROUND FLOOR ADDITIONS TO AN EXISTING HIGH-RISE MULTI-FAMILY DWELLING AS PER APPROVED PLANS. EXISTING BUILDING SPRINKLERED PER NFPA 13 AND INCLUDES STANDPIPES PER NFPA 14. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Jan 14, 2026
1 units
Addition and/or Alteration · FOR THE FIT OUT OF OFFICE SPACES, LIFE SCIENCE RESEARCH AND LABORATORIES ( BUSINESS OCCUPANCY) ON LEVEL 1, 2 AND 3, ASSEMBLY OCCUPANCY (A-3) ON LEVEL 0-A, AND STORAGE SPACES (S-2 OCCUPANCY) ON LEVEL 0-A AND LEVEL P1. NEW CONSTRUCTION PERMIT IS UNDER #CP-2022-003830. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. AMENDMENT APPROVED AS OF 05/19/2026: TO UPDATE THE LO FOR
- Issued Dec 19, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING SPACE. ALTERATIONS TO INCLUDE THE REPLACEMENT OF FINISHES AND THE RELOCATION OF FURNITURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. AMENDMENT APPROVED AS OF 3/19/26: TO ADD STRUCTURAL SUPPORTS AND ARCHITECTURAL FEATURES. SIZE AND LOCATION AS SHOWN IN THE AMENDED PLANS.
- Issued Aug 19, 2025
1 units
New Construction · FOR THE ERECTION OF A SIGNLE STORY STRUCTURE FOR USE AS WELCOME CENTER (GROUP B & M), AND FOR THE ERECTION OF CANOPIES AND AN ADDITION AND LEVEL III ALTERATIONS THROUGHOUT EXISTING STRUCTURE TO BE USE AS RESTROOMS. SEPARATE PERMITS REQUIRED FOR MEP WORK. *2018 IBC* *SHALL BE VIEWED AS ONE BUILDING PER SECTION 503.1.2. *NO EXCAVATION GREATER THAN 5FT.* AMENDMENT 2/5/2026 TO INCLUDE THE CONSTRUCTION DETAILS FOR PROPOSED CANOPY STRUCTURES, SLAB.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.