Entity File · The Public Record
Company / LLC
Hybar Construction LLC
14 permits
- Records on file
- 14
Built (as contractor)
14 entries
- Issued Jul 6, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY AT FIRST-FLOOR OF EXISTING BUILDING. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.
- Issued May 21, 2026
3 units
New Construction · NEW CONSTRUCTION OF A THREE (3) STORY BUILDING FOR USE AS A THREE (3) FAMILY DWELLING [ON THE SAME LOT AS AN EXISTING BUILDING WITH SIX (6) DWELLING UNITS] AS PER APPROVED PLANS AND BBS VARIANCE NO. MI-2026-001515. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Dec 15, 2025
13 units
New Construction · NEW CONSTRUCTION OF A FOUR (4) STORY BUILDING WITH CELLAR AND PRIVATE ROOF DECKS WITH PILOT HOUSES FOR USE AS A SHELL COMMERCIAL SPACE (USE REGISTRATION & FIT-OUT PERMITS REQUIRED PRIOR TO OCCUPANCY) AND THIRTEEN (13) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. SEE PERMIT SP-2025-001452 FOR ASSOCIATED EXCAVATION WORK. FIRE WATCH REQUIRED PER DEPARTMENT CODE BULLETIN F-2001. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FO
- Issued Dec 9, 2025
26 units
New Construction · NEW CONSTRUCTION OF A FIVE (5) STORY STRUCTURE WITH CELLAR, COMMON ROOF DECK AND PILOT HOUSES FOR USE AS TWENTY-SIX (26) DWELLING UNITS WITH ACCESSORY PARKING AS PER APPROVED PLANS. BUILDING TO UTILIZE HORIZONTAL SEPARATIONS TO CREATE TWO (2) SEPARATE BUILDINGS WITH TWO (2) DIFFERENT CONSTRUCTION TYPES (BASEMENT & 1ST FLOOR - TYPE IA AND 2ND THROUGH 5TH FLOORS - TYPE VA). SEE PERMIT SP-2025-001195 FOR ASSOCIATED EXCAVATION WORK. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES
- Issued Nov 18, 2025
3 units
Addition and/or Alteration · FOR LEVEL III INTERIOR ALTERATIONS AND THE ERECTION OF AN ADDITION WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE WITH A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO A THREE (3) FAMILY DWELLING (GROUP R-2). BUILDING TO BE FULLY SPRINKLERED WITH A NFPA 13 AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. SEE SP-2025-000916 FOR ASSOCIATED SITE WORK (EXCAVATIO
- Issued Oct 31, 2025
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN EXCAVATION PLAN/PERMIT AND GEO-TECH REPORT WITH SPECIAL INSPECTIONS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVE
- Issued Oct 31, 2025
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN EXCAVATION PLAN/PERMIT AND GEO-TECH REPORT WITH SPECIAL INSPECTIONS. STEPED FOUNDATION WITH ADJACENT PROPERTIES WALL. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICAT
- Issued Oct 31, 2025
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN EXCAVATION PLAN/PERMIT AND GEO-TECH REPORT WITH SPECIAL INSPECTIONS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVE
- Issued Oct 31, 2025
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN EXCAVATION PLAN/PERMIT AND GEO-TECH REPORT WITH SPECIAL INSPECTIONS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVE
- Issued Oct 31, 2025
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN EXCAVATION PLAN/PERMIT AND GEO-TECH REPORT WITH SPECIAL INSPECTIONS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVE
- Issued Oct 31, 2025
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN EXCAVATION PLAN/PERMIT AND GEO-TECH REPORT WITH SPECIAL INSPECTIONS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVE
- Issued Oct 31, 2025
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN EXCAVATION PLAN/PERMIT AND GEO-TECH REPORT WITH SPECIAL INSPECTIONS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROV
- Issued Oct 31, 2025
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN EXCAVATION PLAN/PERMIT AND GEO-TECH REPORT WITH SPECIAL INSPECTIONS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROV
- Issued Oct 22, 2025
3 units
Addition and/or Alteration · LEVEL III ALTERATIONS TO INCLUDE ADDITIONS AND COMPLETE CHANGE OF OCCUPANCY TO CREATE A THREE (3) STORY BUILDING WITH PRIVATE ROOF DECK AND PILOT HOUSE FOR USE AS THREE (3) DWELLING UNITS AS PER APPROVED PLANS. SEE PERMIT SP-2025-000673 FOR ASSOCIATED EXCAVATION WORK. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.