Entity File · The Public Record
Company / LLC
Ismailanji LLC
8 permits
- Records on file
- 8
Built (as contractor)
8 entries
- Issued Jun 29, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing HVAC system with 4-1/2 ton 20K BTU, install new ductwork and 6 diffusers for the two bedrooms and the second floor. The existing ductwork will remain, with the existing returns and supplies.
- Issued Jun 22, 2026
Make Safe Permit For RP · IN ACCORDANCE WITH CODE BULLETIN PM-1801, A PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION. MAKE SAFE PERMIT - FOR THE REPAIR OF INTERIOR COLLAPSE AND REAR WALL AS PER PLAN AND ENGINEER’S REPORT TO RESOLVE CASE #CF-2024-066499. ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6’ IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQ
- Issued Apr 29, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-002286
- Issued Apr 14, 2026
Addition and/or Alteration · FOR PARTIAL DEMOLITION OF THE STRUCTURE AND THE ERECTION OF VERTICAL AND REAR ADDITIONS AND DECK WITH INTERIOR ALTERATIONS TO AN EXISTING DETACHED STRUCTURE USED AS A SINGLE-FAMILY DWELLING AS PER BUILDING APPLICATION/PLAN.
- Issued Apr 9, 2026
New construction, addition, GFA change · Two story rear addition to a detach structure for use as single-family household living. Size and location per plans.
- Issued Mar 12, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE. FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE A NEW ACCESSIBLE BATHROOM, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ASBESTOS ABATEMENT REQUIRED PRIOR TO THE START OF WORK.
- Issued Feb 10, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 60k BTU furnace, 3 ton AC, ductwork, and 8 diffusers
- Issued Sep 4, 2025
1 units
New Construction · FOR THE CONSTRUCTION OF A DETACHED STRUCTURE WITH BASEMENT TO INCLUDE HVAC UNIT AND DUCT WORK. BUILDING STRUCTURE WILL COMPLY WITH FIRE-SUPPRESSION SYSTEM NFPA 13 D. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. **********************SEPARATE PERMITS REQUIRED FOR ANY OTHER WORK. *********************************************
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.