Entity File · The Public Record
Company / LLC
Jc Excavation Services LLC
21 permits
- Records on file
- 21
Built (as contractor)
21 entries
- Issued Jun 11, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING THREE (3) ATTACHED THREE-STORY STRUCTURES TO BE DEMOLISHED BY A COMBINATION OF HAND-HELD AND MECHANICAL EQUIPMENT PER APPROVED PLANS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *21 DAY POSING AND NOTICE REQUIRED PER A-303.2 IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.
- Issued Mar 13, 2026
Minor Demolition · COMPLETE DEMOLITION OF AN EXISTING ATTACHED TWO-STORY, MASONRY AND WOOD COMMERCIAL BUILDING BY HAND METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. PARTIAL SIDEWALK CLOSURE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PER
- Issued Feb 27, 2026
1 units
Excavation · FOR EXCAVATION AND SOE AS PER APPROVED PLANS. SEE RP-2025-011151 FOR THE NEW CONSTRUCTION.
- Issued Feb 19, 2026
Excavation · EXCAVATION WORK ASSOCIATED WITH NEW CONSTRUCTION BUILDING (SEE CP-2023-004665) TO INCLUDE SHEETING AND SHORING AND UNDERPINNING WORK AS PER APPROVED PLANS. UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES. *2018 IBC REVIEW* **AMENDMENT APPROVED 3/26/26** AMEND EXCAVATION PERMIT SP-2024-001175 FOR CHANGES TO SHORING AND UNDERPINNING DESIGN AS PER APPROVED PLANS.
- Issued Dec 12, 2025
Minor Demolition · FOR THE COMPLETE DEMOLITION OF ONE (1) EXISTING THREE (3) STORY BUILDING BY HAND DEMOLITION ONLY. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. * A COVERED WALKWAY OR SIDEWA
- Issued Nov 20, 2025
Excavation · FOR EXCAVATION WORK AS PER APPROVED PLANS. AMENDMENT 12/18/2025 TO REVISE SHORING DESIGN AND ADD UNDERPINNING.
- Issued Nov 13, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-008258
- Issued Nov 13, 2025
Major Demolition · MAKE-SAFE PERMIT: FOR THE COMPLETE DEMOLITION OF THE EXISTING ATTACHED STRUCTURE BY HAND AND MECHANICAL DEMOLITION TO RESOLVE CASE CF-2025-014944. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. “A COVERED WALKWAY
- Issued Oct 23, 2025
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT AND EXCAVATION PERMIT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. UNDERPINNING IS PART OF THIS PERMIT WITH CONTINUED INSPECTIONS. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVE
- Issued Sep 18, 2025
Excavation · EXCAVATION WORK FOR NEW STAIRWAY TO BASEMENT LEVEL ASSOCIATED WITH BUILDING NEW CONSTRUCTION AS PER APPROVED PLANS. *2018 IBC REVIEW*
- Issued Jul 17, 2025
1 units
Excavation · FOR THE EXCAVATION ASSOCIATED WITH THE NEW CONSTRUCTION. ALL WORK TO BE DONE PER THE APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT THE DESIGN ENGINEER PRIOR TO THE START OF WORK. SEPARATE PERMITS REQURIED FOR ALL OTHER WORK
- Issued Jul 17, 2025
1 units
Excavation · EXCAVATION WORK ASSOCIATED WITH RESIDENTIAL NEW CONSTRUCTION (SEE RP-2024-013600) AS PER APPROVED PLANS AND DOCUMENTATION. *2018 IRC REVIEW*
- Issued Jul 17, 2025
1 units
Excavation · FOR EXCAVATION WORK ASSOCIATED WITH NEW CONSTRUCTION OF A TWO (2) STORY SINGLE-FAMILY DWELLING (SEE RP-2024-013598) AS PER APPROVED PLANS. WORK TO INCLUDE TEMPORARY EXCAVATION SUPPORT SYSTEM. NO BUILDING CONSTRUCTION APPROVED ON THIS PERMIT. *2018 IRC REVIEW*
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.