- Issued Aug 18, 2026
Addition and/or Alteration · The systems installation will take place as follows: Decommissioning: Unless noted on the drawing that equipment is to remain in place, Johnson Controls will decommission the existing Intrusion head end equipment and their associated devices, along with removing the cable associated with the equipment. If NVR is being replaced, as noted in the estimate, the older NVR unit is to be shipped to ERI for storage, see shipping form for instructions. Installation: 1. Intrusion Installation of the intru
- Issued Aug 13, 2026
Addition and/or Alteration · Installation of telecommunication wiring for cameras and security system. All work to be done according to the 2020 NEC and per executed contract.
- Issued Aug 7, 2026
Addition and/or Alteration · This proposal is to upgrade the existing (Broken. Could not be reactivated) Radionic D7412 with a new B9512-CV Y520031026 JCI shall remove the existing panel and replace it with a new Radionics with cell communication. JCI shall replace the one existing keypads with new. This is BA ONLY. AS PER 2020 NEC
- Issued Aug 6, 2026
Addition and/or Alteration · Upgrade the existing Focus intrusion system by installing a new DMP XR Series intrusion detection system. Because the current control panel is obsolete, all existing equipment, field devices, and cables will be replaced. JCI will furnish and install a complete DMP solution, including the headend equipment, field devices, and new cabling as required. Existing conduit will be reused wherever feasible. New conduit will only be added for the keypad cable drop, as this is the only location requiring
- Issued Aug 6, 2026
Addition and/or Alteration · Add one (1) new elevator lobby card reader to provide controlled access for authorized personnel. Work includes installation of all required low-voltage wiring, raceways and power connections. All work to be perform according to the 2017 NEC and per approve4d plans.
- Issued Aug 5, 2026
Addition and/or Alteration · Installation Johnson Controls will install a new DMP BA system consisting of a head end control panel, motion sensors, doors contacts, glass breaks, cell communicator, keypad, and horn strobe
- Issued Jul 21, 2026
Addition and/or Alteration · Install telecommunications wiring and associated devices for a security system, including security cameras, monitor(s), and digital video recorder (DVR) or network video recorder (NVR). All work to be perform according to the 2020 NEC and per executed contract.
- Issued Jul 20, 2026
Addition and/or Alteration · Install, and program the required fire alarm devices, including two (2) smoke detectors and one (1) notification device. All newly installed devices will be integrated and tied into the existing SEPTA EST3 Fire Alarm Panel. PER APPROVED DRAWINGS-2020 NEC,2019 NFPA-72.
- Issued Jun 22, 2026
Addition and/or Alteration · This proposal is to add a cell communicator and replace old smokes and heats due to false alarm. The fire alarm system is a Unimode 10 JCI shall Install a new TG-7FM communicator at the location of the control panel. The system shall utilizing cell communication. The cell shall get power off the Unimode 10 JCI shall replace the existing old smoke detectors and old heat detectors with new devices as per 2016 NFPA 72.
- Issued Jun 17, 2026
Addition and/or Alteration · Intercom Add JCI will install an Axis I8116-E Video Intercom that will be connected to the switch via CAT6 cable allowing for communication with the video master station device. Access control relocation JCI will relocate existing ACS Head End and POE Switch. Please refer to drawings for the new location. JCI will provide and install new wire to complete this relocation. JCI to relocate the existing Lockdown Button and Master Station to Dashe Pickup Area. Please refer to drawings for the new loc
- Issued Jun 12, 2026
Addition and/or Alteration · Furnish and install telecommunication wiring and associated devices for a burglar alarm system. All work to be done according to the 2017 NEC and per approved plans.
- Issued Jun 11, 2026
Addition and/or Alteration · This proposal is to add on to an addressable Vista 128FB fire alarm system JCI shall relocate three horn strobes four feet over (see drawing for detail) All o9ther existing devices shall remain as installed. JCI shall install four duct detectors, test stations. The new duct shall be powered off the new power supply. JCI shall install eight input modules to monitor the ducts for supervisory and trouble. JCI shall install a new power supply next to the existing one by the fire panel. This will get
- Issued Jun 9, 2026
Addition and/or Alterations · INSTALLATION OF A UL LISTED CLEAN AGENT SUPPRESSION SYSTEM IN REFERENCE STACKS ROOM OF AN EXISTING MUSICAL INSTITUTE IN ACCORDANCE WITH NFPA 2001 AND AS PER APPROVED PLANS.
- Issued Jun 8, 2026
Addition and/or Alteration · JCI will supply, install, program, test, and commission a Hardwired intrusion system using a Honeywell Vista 20 series panel. All existing field devices will be replaced, but existing wiring may be reused where feasible. This option provides a cost effective, conventional IDS alternative. Exterior doors will receive overhead door contacts to resolve door gap issues. Interior doors will receive new surface contacts. All motion and glass breaks will be replaced. Headend: System includes a Honeywe
- Issued Jun 8, 2026
Addition and/or Alteration · Install audible visual devices in the Youth Network suite on the third floor. JCI shall run a new visual wire from the new power supply in the electrical room around the suite for the new devices. JCI shall extend the existing speaker circuit onto the new speaker devices. all existing speaker strobes shall be removed, tied through and covered. Speakers shall be set at 70volt. JCI shall install the new speaker strobes and strobes per the attached drawing. JCI shall test the newly installed devi
- Issued Apr 22, 2026
Addition and/or Alteration · JCI to add audible visual devices in the production area. JCI shall install new horn strobes per the attached drawing. JCI shall install two new power supplies for the the A/V devices JCI shall add a smoke over the power supply located in the maint shop. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Mar 20, 2026
Addition and/or Alteration · The replacement of the existing fire alarm system with a system from a different manufacturer. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued Jan 28, 2026
Addition and/or Alteration · Install visual and audible fire alarm devices to the fire alarm system. All work to be done according to the 2017 NEC the 2016 NFPA 72 and per approved plans.
- Issued Nov 25, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 THROUGHOUT THE ENTIRE BUILDING WITH 4” FIRE SERVICE AND 4" BACKFLOW PREVENTION ASSEMBLY. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated September 18, 2026.