- Issued Apr 28, 2026
Addition and/or Alteration · Whole house rewire, 55 receptacles, 20 switches, 6 smoke detectors, 40 high hats
- Issued Apr 10, 2026
Addition and/or Alteration · Whole house rewire, 55 receptacles, 22 switches, f 6 smoke detectors, 40 high hats
- Issued Apr 1, 2026
Addition and/or Alteration · Whole house rewire 55 receptacles, 22 switches, five smoke detectors, 40 high hats, 30 circuit panel 100 amp service.
- Issued Jan 13, 2026
Addition and/or Alteration · Whole house rewire, 55 receptacles, 20 switches, six smoke detectors, 40 high hats, 30 circuit panel, 100 amp service.
- Issued Jan 4, 2026
Addition and/or Alteration · Whole house three story, rewire, 55 receptacles, 20 switches, seven smoke detectors, 52 high hats, 40 circuit panel 200 amp service.
- Issued Dec 8, 2025
Addition and/or Alteration · Rewire kitchen, two countertop circuits, refrigerator, circuit, microwave, circuit, dishwasher, circuit, and install 100 amp 30 circuit panel.
- Issued Dec 3, 2025
Addition and/or Alteration · First floor, 25 receptacles, six switches, three smoke detectors, 24 high hats, 30 circuit main lug panel. Second floor, 25 receptacles, six switches, two smoke detectors, 24 high hats, 30 circuit panel main lug only. Basement, five lights, one GFI receptacle, 200 amp service, three gang meter socket common to circuit panel.
- Issued Oct 1, 2025
Addition and/or Alteration · Whole house rewire, 35 receptacles, 13 switches, five smoke detectors, 35 high hats, 100 amp service, 30 circuit panel.
- Issued Aug 27, 2025
Addition and/or Alteration · Install 300A service, wire throughout ,110v interconnected smoke alarms, em/exit lighting. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **SEPARATE FIRE ALARM PERMIT REQ'D**
- Issued Aug 20, 2025
Addition and/or Alteration · Whole house rewire, 35 receptacles, 13 switches, six smoke detectors, 25 high hats, new 100 amp service 30 circuit panel.
- Issued Jul 29, 2025
Addition and/or Alteration · First floor 25 receptacles, six switches, three smoke detectors, 24 high hats, 30 circuit main lug panel. Second floor 25 receptacles, six switches, two smoke detectors, 24 high hats, 30 circuit panel main lug only. Basement four lights one GFI receptacle 220 V dryer line 3 gang meter socket 200 amp service common to circuit panel.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.