Entity File · The Public Record
Company / LLC
Jpc Group, INC.
14 permits
- Records on file
- 14
Built (as contractor)
14 entries
- Issued Jun 30, 2026
General Earth Disturbance ONLY · SITEWORK ASSOCIATED WATER UTILITY LAGOON REHABILITATION AS PER APPROVED PLANS. *2018 IBC REVIEW*
- Issued Jun 18, 2026
1 units
Addition and/or Alteration · FOR THE REMOVAL AND REPLACEMENT, IN KIND, OF A SWIMMING POOL AND A ONE (1) STORY STRUCTURE (POOL EQUIPMENT STORAGE) ACCESSORY TO EXISTING RECREATION FACILITIES. FOR USE AS PREVIOUSLY APPROVED. AS PER APPROVED PLANS. *******************SEPARATE PERMITS FOR ANY OTHER WORK. **********************************
- Issued May 26, 2026
City Demolition · Sub Demolition Permit for CF-2026-057426. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No sidewalk. (2) stucco c/w 2912, 2916 Kensington Ave. backfill any basement if applicable. Perforate remaining slabs for water drainage. Install 6' chain link fencing around entire footprint of property to close in adjacent properties. Erosion control mat with topsoil and seed if slab is not continuous throughout.
- Issued Mar 18, 2026
1 units
New Construction · FOR THE ERECTION OF A 2-STORY DETACHED STRUCTURE TO BE USED AS PWD PUMPING STATION AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY MEP WORK.
- Issued Feb 2, 2026
General Earth Disturbance ONLY · FOR SITEWORK AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP WORK.
- Issued Jan 6, 2026
Major Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING FIVE (5) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND MECHANICAL METHODS. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE. *TO BE DEMOLISHED SIMUL
- Issued Dec 5, 2025
Sitework with Onsite Utility Services · SITEWORK ASSOCIATED WITH NEW CONSTRUCTION DEVELOPMENT TO INCLUDE CLEARING AND GRUBBING AND EXCAVATION FOR UTILITY WORK (NO EXCAVATION PERMIT REQUIRED) AS PER APPROVED PLANS. THIS APPROVAL FOR PHASES 1, 2A, 2B, AND 3 ONLY, NO EXCAVATION WORK ASSOCIATED WITH NEW CONSTRUCTION INCLUDED IN THIS PERMIT. *2018 IBC REVIEW*
- Issued Nov 10, 2025
Major Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING THREE (3) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND MECHANICAL METHODS *SEE PLANS FOR SEQUENCING*. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSU
- Issued Nov 6, 2025
Major Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING THREE (3) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY MECHANICAL AND HAND METHODS. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE.
- Issued Nov 6, 2025
Major Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING TWO (2) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION BY MECHANICAL METHODS. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE.
- Issued Nov 6, 2025
Major Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING THREE (3) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY MECHANICAL METHODS. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE. *TO BE DEMOLISHED SIMULTANEOUSL
- Issued Sep 9, 2025
Sitework with Onsite Utility Services · FOR SITE WORK TO INCLUDE INSTALLATION OF KIOSK AND GATE AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL WORK.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.