- Issued Jun 29, 2026
Addition and/or Alteration · Supply and install a new 200AMP service cable including a new 200AMP service cable on the exterior sleeved in PVC conduit if applicable. A new 200 AMP meter box. Ground the main electrical system. Build a backboard for the new equipment in the basement as necessary. Label the panel after rewire is complete. First floor: Supply and install new wiring to existing outlets in living room and dining room to replace knob and tube wiring. Supply and install new wiring to existing lighting and sw
- Issued Jun 26, 2026
Addition and/or Alteration · Supply and install a new 200AMP service cable including a new 200AMP service cable on the exterior sleeved in PVC conduit if applicable. A new 200 AMP meter box. Ground the main electrical system. Build a backboard for the new equipment in the basement as necessary. Label the panel after rewire is complete. First floor: Supply and install new wiring to existing outlets in living room and dining room to replace knob and tube wiring. Supply and install new wiring to existing lighting and sw
- Issued Jun 23, 2026
Addition and/or Alteration · Supply and install a new 200AMP service cable on the exterior sleeved in PVC conduit if applicable. A new 200AMP meter socket on the interior. A new Siemens 200 AMP 40 circuit panel with main breaker, A new Siemens breaker for every existing circuit properly sized for every existing standard breaker. We will reuse existing Siemens ARC fault breakers. Install a Siemens in panel surge protector. Ground the main electrical system. Build a backboard for the new equipment in the basement if ne
- Issued Jun 16, 2026
Addition and/or Alteration · Supply and install a new 100 AMP panel including a new Siemens 100 AMP 30 circuit panel with main breaker, a new Siemens beaker for every existing circuit properly sized, A new 100 AMP meter box, ground the main electrical system, build a backboard, if necessary to mount the new panel, a Siemens in panel surge protector, label the panel. Provide a permit and inspection for work listed above, troubleshoot/evaluate one outlet in front bedroom.
- Issued Jun 16, 2026
Addition and/or Alteration · Supply and install a new 200 AMP service cable, sleeved in PVC conduit if applicable. Supply and install a new 200 AMP meter socket to replace undersized existing. Properly ground the main electrical system. Su[lu and install new Decora switching to replace existing in third floor bedroom (5 single switches). Two singe poles, one new three way in hallway. 4 singles, two three ways and one four way on second floor. one three way, eight singles on first floor. Supply and install a new smok
- Issued May 6, 2026
Addition and/or Alteration · Supply and install 4 new receptacles in basement. Supply and install a dedicated 15 AMP circuit for outlets above. Supply and install GFCI and ARC fault protection for outlets above. Supply and install a dedicated 20 AMP circuit for a washer receptacle. Supply and install a dual-function ARC fault GFCI breaker for dedicated washer circuit. Fishing lines throughout to allow for wiring.
- Issued Jan 21, 2026
Addition and/or Alteration · Supply and install a new 200 AMP service including: a new 200 AMP service cable on the exterior, sleeved in PVC conduit, if applicable. A new 200 AMP meter socket on the exterior. A new Siemens 40 circuit panel with a 200 AMP main breaker. A new breaker for every existing circuit, properly sized.. Ground the main electrical system. Build a backboard for the new equipment in the basement
- Issued Jan 14, 2026
Addition and/or Alteration · Supply and install a new 100 AMP service including: a new 100 AMP service cable on the exterior sleeved in PVC conduit,, if applicable, a new 100 AMP meter socket on the exterior. A new Siemens 30 circuit panel with a 100 AMP main breaker. A new Siemens breaker for every existing circuit, properly sized. Ground the main electrical system. Build a backboard for the new equipment in the basement, as necessary. Supply and install a Siemens in panel whole house surge protector. Provide perm
- Issued Nov 24, 2025
Addition and/or Alteration · Electrical Permit for combo CP-2024-003008
- Issued Nov 17, 2025
Addition and/or Alteration · Supply and install a new 100 AMP service including: a new 100 AMP service cable on the exterior, sleeved in PVC conduit if applicable. New 100 AMP meter socket on the exterior. New Siemens 30 circuit panel with a 100 AMP main breaker. A new breaker for every existing circuit properly sized. Ground the main electrical system. Build a backboard for the new equipment in the basement if necessary. Label the panel.
- Issued Sep 24, 2025
Addition and/or Alteration · Supply and install a new 200 AMP service including: • A new Siemens 200 AMP 40 circuit panel with main breaker • Supply and install a new Siemens breaker properly sized for every new circuit as a result of the rewire • A new 200 AMP meter socket on the exterior • A new 200 AMP service cable from load side of meter to main electrical panel • Ground the main electrical system • Build a back board to mount the new panel if necessary • Label the panel Complete rewire as per NEC code • Supply, wire
- Issued Sep 15, 2025
Addition and/or Alteration · Supply and install a new 200 AMP service including a new 200 AMP service cable on the exterior sleeved in PVC conduit, a new 200 AMP meter socket on the interior, a new Siemens 200 AMP 40 circuit panel and main breaker, supply and install a new Siemens breaker properly sized for every existing circuit, ground the main electrical system, build a back board to mount the new panel if necessary and label the panel. Provide a permit and inspection for the work listed above.
- Issued Aug 11, 2025
Addition and/or Alteration · Supply and install a new 200 AMP service cable on exterior, sleeved in PVC A new 200 AMP meter socket on the exterior. A new Siemens 40 circuit panel with a 200 AMP main breaker. A new breaker for every existing circuit, properly sized where necessary. Ground the main electrical system. Build a backboard for the new equipment in basement if necessary. Label the panel. Remove existing dead floating wires in basement. Supply and install cover plates for exposed junction boxes in basement.
- Issued Jul 24, 2025
Addition and/or Alteration · Supply and install a new 100 AMP service, including new 100 AMP service cable on the exterior sleeved in PVC conduit if applicable, new 100 AMP meter socket on the interior, new Siemens 100 AMP 30 circuit panel with main breaker, supply and install a new Siemens breaker properly sized for every existing circuit, ground the main electrical system, build a backboard to mount the new panel if necessary, label the panel. Knob and tube replacement and additional wiring first floor: Supply and insta
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 18, 2026.