Entity File · The Public Record
Contractor
Lee Ovrutsky
23 permits
- Records on file
- 23
Built (as contractor)
23 entries
- Issued Jun 30, 2026
Addition and/or Alteration · (((All work fished))) Replace one 200A entrance cable Grounding system to the water meter in an open basement (50 feet) Bond all pipes for the water heater as they are currently not bonded Install whole house surge protector Install one 4-foot LED fixture in the basement closet Run one dedicated line 15-amp Line Install one new dedicated circuit for the range (20A on an arc fault breaker) Install one GFCI outlet for an existing feed for the dishwasher Replace the washer outlet with a new box and
- Issued Jun 15, 2026
Addition and/or Alteration · (((All work fished))) 100 amp 20 circuit sub panel installed to the right of the main panel 100 amp whole house surge protector2 rod grounding system Ground panel to water meter (45 feet) Replace one ceramic fixture with a new LED fixture above the sink
- Issued Jun 11, 2026
Addition and/or Alteration · (((All work fished))) 200 AMP Service Install - 200 AMP 40 Circuit Panel 200 AMP Service Cable (30 feet) 200 AMP Entrance Cable 200 AMP Meter Socket 200 AMP backing board 200 AMP (2) Rod Grounding System 200 AMP Surge Protector 100 AMP sub panel Rewire the dryer with a double pole 30A circuit Install one 4 prong cord and outlet for the dryer Replace one outlet with a GFCI for the washer Ground the panel to the water meter (45 feet) Permit and inspection
- Issued Jun 11, 2026
Addition and/or Alteration · (((All work fished))) 100 AMP Service 100 AMP 30 Circuit Panel 100 AMP Service Cable 100 AMP Entrance Cable 100 AMP Meter Socket 100 AMP (2) Rod Grounding System 100 AMP Surge Protector -Install one new 20A circuit for the dryer GFCI and AFCI protection where required
- Issued Jun 2, 2026
Addition and/or Alteration · ((All work fished))) 100 AMP Service Installation 100 AMP 30 Circuit Panel 100 AMP Service Cable 100 AMP Entrance Cable 100 AMP Meter Socket 100 AMP (2) Rod Grounding System Whole House Surge Protector Run one dedicated 20A circuit to the second floor for a ac unit along the outside wall Within the same conduit, run a new 20A circuit to the same room for two new outlets along the wall where no receptacles are present These circuits must be put on arc fault breakers Run one dedicated line to
- Issued Jun 2, 2026
Addition and/or Alteration · (((All work fished))) 100 amp 30 circuit panel replacement 100 amp whole house surge protector 60amp panel replacement. 2 rod grounding system Ground panel to water meter Install one ring doorbell compatible transformer and rewire the doorbell.
- Issued May 28, 2026
Addition and/or Alteration · 200 amp 40 circuit panel replacement Whole house surge protector 200 amp 2 rod grounding system (((All Work Fished)))
- Issued May 28, 2026
Addition and/or Alteration · (((All work fished))) 100 amp 30 circuit panel 100-amp meter socket 100 amp 2 rod grounding system Whole house surge protector 60 amp sub panel replacement any circuit that will be rewired will required an arc fault breaker Rewire lighting circuit 1st and 2nd floor Install one new dedicated outlet on the outside porch This will be a weather resistant GFCI with a bubble cover. If these fixtures are not reusable, a new fixture will need to be customer provided. 10-year warranty on all new parts an
- Issued May 28, 2026
Addition and/or Alteration · (((All Work Fished))) 100 AMP 20 Circuit Panel Replacement 100 AMP Load Side Cable Replacement Grounding
- Issued May 28, 2026
Addition and/or Alteration · (((All work Fished))) 150-amp 30 circuit panel replacement Whole house surge protector 2 rod grounding system Replace two weather resistant GFCI outlets and bubble covers Replace one utility outlet next to the panel with a GFCI outlet Clean up wiring outside in the meter area Install one clamp on the entrance cable 10-year warranty on all parts and labor.
- Issued Apr 14, 2026
Addition and/or Alteration · Electrical Work: •Run 2 dedicated back splash/small appliance circuits. 4 outlets included •Run a dishwasher circuit •Run a garbage disposal circuit •Run a fridge circuit •Run a range and microwave circuit •Rough in 4 high hats and a switch •Land everything in the panel •Install all boxes Install all finish devices and fixtures AFCI and GFCI protection where required. (RP-2026-002249)
- Issued Apr 9, 2026
Addition and/or Alteration · 200 AMP 40 Circuit Panel 200 AMP Service Cable 200 AMP Entrance Cable 200 AMP Meter Socket (Install on the exterior of the property) 200 AMP Outside Disconnect 200 AMP (2) Rod Grounding System 200 AMP Surge Protector 200 AMP Backboard (See photos for size) Install conduit running from the top of the meter to the service head location (((All work fished)))
- Issued Mar 31, 2026
Addition and/or Alteration · 100 AMP Service Upgrade 100 AMP 30 Circuit Panel 100 AMP Service Cable 100 AMP Entrance Cable 100 AMP Meter Socket 100 AMP (2) Rod Grounding System 100 AMP Surge Protector 100 AMP Weather head 100 AMP 30 circuit backboard
- Issued Feb 28, 2026
Addition and/or Alteration · Fishing Only: Replace the existing 200-amp, 40-circuit panel with a new 200-amp panel. Install new circuit breakers, including AFCI and GFCI where existing. Extend wiring in the panel as necessary to accommodate new breakers. Install a whole-house surge protection device (breaker type). Test and label all circuits in the panel. All work shall be performed in accordance with the 2017 NEC.
- Issued Feb 26, 2026
Addition and/or Alteration · ((All Work Fished)) 200 Amp service upgrade. Grounding system, with surge unit. Run new 5 new circuits to the kitchen. All branch wiring will have AFCI and GFCI protection were required.
- Issued Dec 17, 2025
Addition and/or Alteration · (((All work is fished))) Install new 100 amp meter socket as current socket is installed upside down 100 amp 2 rod grounding system Bond both neutral bars together Ensure no neutral wires are double stacked in the neutral bar Reattach service cable to outside wall with new clamps Install 100 amp service head and attach service head to outside wall Redo service taps to ensure safe and proper connections Current service has a gooseneck loop without a service head
- Issued Oct 22, 2025
Addition and/or Alteration · Run a dedicated line with a GFCI / AFCI protection. (((All work is fished)))
- Issued Oct 4, 2025
Addition and/or Alteration · INSTALL PROPER GROUNDING AND BONDING TO ELECTRICAL SERVICE. REPLACE WIRING, LIGHTING AND JUNCTION BOXES. REPLACE SMOKE ALARM IN BASEMENT. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC. ************** FISHING WIRES ONLY *****************
- Issued Oct 4, 2025
Addition and/or Alteration · INSTALL 100 AMP ELECTRICAL SERVICE WITH MAIN CIRCUIT BREAKER PANEL AND PROPER GROUNDING AND BONDING. ALL WORK TO BE DONE ACCORDING TO THE 2017 NCE.
- Issued Sep 15, 2025
Addition and/or Alteration · ((((All work is fished)))) ? 2 100 AMP 30 Circuit Panels ? 1 200 AMP Service Cable (20 feet high) ? 2 100 AMP Entrance Cable (8 feet) ? 1 200 AMP 2 gang drop down Meter Socket ? 2 100 AMP (2) Rod Grounding System ? 2 100 AMP Surge Protector ? 1 back board for both 30 circuit panel ? ? Left panel: ? 6 single pole 20 amp breakers ? ? Right panel: ? 5 single pole 15 amp breakers ? 6 single pole 20 amp breakers ? 1 double pole 30 amp breaker ? 1 double pole 20 amp breakers ? ? Reattach hanging wires
- Issued Jul 30, 2025
Addition and/or Alteration · ll Work Is Fished-200 AMP Service. Add 1 House 100 AMP 20 Circuit Panel. 200 AMP Service Cable. 3 - 100 AMP Load Side Cables, 200 AMP 3 gang Meter Socket. 200 AMP (2) Rod Grounding System. Rewire Common Space Circuits to New House Panel.
- Issued Jul 22, 2025
Addition and/or Alteration · (((All work fished - old work))) 200 AMP 40 Circuit Panel 200 AMP Service Cable 200 AMP Entrance Cable 200 AMP Meter Socket 200 AMP (2) Rod Grounding System 200 AMP Surge Protector Install backing board so panel is flush to wall, there is a 4 1/2 inch ledge coming off the base of the wall, 1 2/4 subpanel, 1 6/12 subpanel, Run designated line for dishwater and garbage disposal, Add outlet for dishwasher behind where current cabinets are located, Add switch for garbage disposal under sink or on wa
- Issued Jul 17, 2025
Addition and/or Alteration · ((All work fished)) Panel change out. 100 amp 30 circuit Panel . GFCI AFCI protection where required. Light fixture to be installed pictures provided . 2 rod rod grounding system . 100 amp Surge protector . Label breaker .
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.