7 permits
- Records on file
- 7
Built (as contractor)
7 entries
- Issued May 18, 2026
2 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS A TWO (2) FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. (UNDERPINNING NOT A PART OF THIS PERMIT). SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA 13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- Issued May 5, 2026
1 units
New Construction · FOR NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK. FOR USE AS A SINGLE-FAMILY DWELLING THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED PER NFPA 13D. **MECHANICAL, ELECTRICAL, PLUMBING, AND EXCAVATION WORK INCLUDED IN THE SCOPE OF WORK** SEPARATE PERMITS REQUIRED FOR ALL FIRE SUPPRESSION SYSTEMS INSTALLATION. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.**ENERGY COD
- Issued May 5, 2026
1 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARR
- Issued Mar 26, 2026
1 units
New Construction · FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR AND ROOF DECK ACCESSED BY ROOF DECK ACCESS STRUCTURE. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. ***********************SEPARATE ELECTRICAL, AND PLUMBING PERMITS REQUIRED. ****************************************
- Issued Mar 16, 2026
7 units
New Construction · FOR NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK AND A ROOF DECK ACCESS STRUCTURE. FOR USE AS A MULTI-FAMILY HOUSEHOLD LIIVNG FOR FIVE (5) DWELLING UNITS AND TWO ARTIST STUDIO AT THE BASEMENT AND GROUND FLOOR. BUILDING SHALL BE FULLY SPRINKLERED PER NFPA13. SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIE
- Issued Sep 19, 2025
2 units
New Construction · FOR THE NEW CONSTRUCTION OF A FOUR (4) STORY, TWO (2) FAMILY STRUCTURE WITH TWO (2) ACCESSORY ROOF DECKS ACCESSED BY TWO (2) INDIVIDUAL PILOTHOUSES (INCLUDING ELEVATOR OVERRUNS), AND SIX (6) INTERIOR ACCESSORY OFF-STREET PARKING SPACES (THREE (3) SPACES PER DWELLING UNIT) IN AN ENCLOSED GROUND LEVEL GARAGE, ALL AS PER APPROVED PLANS.
- Issued Jul 21, 2025
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13R) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. **AMENDED 10/2/25- Removal of crawlspace an
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.