Entity File · The Public Record
Company / LLC
Level Up Builders LLC
9 permits
- Records on file
- 9
Built (as contractor)
9 entries
- Issued Jun 29, 2026
Addition and/or Alteration · Interior alterations to convert an existing basement/garage area into habitable living space within an existing single-family dwelling. Work to include new interior partitions, finishes, and associated life safety improvements as required. No change in occupancy classification is proposed and no structural work.. see permit # RP-2025-012903 other work details.
- Issued May 21, 2026
Make Safe Permit For RP · MAKE SAFE PERMIT- For (Remove brick above rear window and replace lintel. Add 4 ft. long 4" 4" x1/4 for steel lintel) to resolve case #CF-2026-013842. Abutting sidewalk must be closed with fencing a minimum of 6’ in height. Separate Streets Department permit required for sidewalk closure. A separate permit is required for any additional alterations that are not specifically addressed on case #CF-2026-013842. “In accordance with Code Bulletin PM-1801, a PA professional engineer is required to mo
- Issued May 13, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Feb 4, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install furnace, AC, ductwork, and 9 registers
- Issued Jan 12, 2026
Addition and/or Alteration · For interior and exterior alterations to an existing attached single-family dwelling per plans. Separate permits are required for all associated Mechanical, Electrical, and Plumbing work. Basement to remain non-habitable, to be used for storage and utilities only. Interior parking space to remain.
- Issued Dec 17, 2025
3 units
Addition and/or Alteration · FOR LEVEL I ALTERATIONS TO AN EXISTING APARTMENT UNIT (1 OF 3 UNITS IN BUILDING), ALTERATIONS TO INCLUDE PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 15, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.