Entity File · The Public Record
Company / LLC
L/s 26th Street North LP
7 permits · 3 violations
- Records on file
- 10
Permits (as owner)
7 entries
- Issued Nov 2, 2026
Addition and/or Alterations · FOR INSTALLATION OF FUEL GAS PIPING AT ROOFTOP FOR FUTURE HVAC MECHANICAL EQUIPMENT.
- Issued Oct 20, 2026
Addition and/or Alteration · relocate 1200 a panel to column line j, feed from existing 200amp panel relocate 400a 480/277v panel, relocate 45kva transformer 480/208/120 relocate 100a 3 phase 208/120 panel install new feeder line 3-4 emt 3-sets 750mcm al wire ground as per 2020 NEC.
- Issued Oct 3, 2026
Alterations · New piping to include: 2 Other (Install 1-4" valve and cap and 1-2-1/2" valve and cap on existing domestic water line for future tenant fit out in existing industrial facility). All work per 2021 PPC.
- Issued Sep 21, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN EXISTING GROUP S-1 USE AND OCCUPANCY CLASSIFICATION TO SUB-DIVIDE AN EXISTING WAREHOUSE INTO MULTIPLE STORAGE SPACES. EXISTING BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK.
- Issued Jul 15, 2026
EZ Interior Non-Load-Bearing Wall Demo. · EZ INTERIOR DEMOLITION- For the interior demolition on non-bearing partition wall and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans. Structural alteration or repair is expressly PROHIBITED under this permit. Prohibited structural work includes but not limited to any modification to exterior walls, party wall, floor/roof framing and foundations, including underpinning, excavation and removal of foundation slab. Separate Street
- Issued Jan 30, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Aug 1, 2025
Addition and/or Alteration · Electrical Permit for combo CP-2025-003316
Violations
3 entries
- Violation Oct 5, 2026OPEN
BENCHMARKING LATE
- Violation Oct 1, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Oct 1, 2026OPEN
PERIODIC TESTING
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 7, 2026.