Entity File · The Public Record
Company / LLC
Lynx Management Solutions LLC
22 permits
- Records on file
- 22
Built (as contractor)
22 entries
- Issued Aug 4, 2026
3 units
New Construction · FOR NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK AND A ROOF DECK ACCESS STRUCTURE. FOR USE AS A MULTI-FAMILY HOUSEHOLD LIVING FOR THREE DWELLING UNITS. BUILDING SHALL BE FULLY SPRINKLERED PER NFPA13. SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. **EXCAVATION WORK TO BE INCLUDED AS PART OF THE PERMIT**PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQ
- Issued Jul 29, 2026
2 units
New Construction · FOR UNDERPINNING AND FOR THE INSTALLATION OF AN ATTACHED STRUCTURE WITH CELLAR AND ROOF DECK ACCESSED BY ROOF DECK ACCESS STRUCTURE. FOR USE AS TWO-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. *********************SEPARATE PERMITS FOR ALL OTHER WORK. **********************************
- Issued Jul 24, 2026
3 units
New Construction · NEW CONSTRUCTION OF A THREE-STORY BUILDING WITH CELLAR AND PRIVATE ROOF DECK/PILOT HOUSE FOR USE A THREE (3) DWELLING UNITS AS PER APPROVED PLANS. WORK TO INCLUDE UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Jul 15, 2026
3 units
New Construction · FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR, REAR DECK, AND ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE. FOR USE AS MULTI-FAMILY (3 UNIT) HOUSEHOLD LIVING. AS PER APPROVED PLANS. **************************SEPARATE PERMITS FOR ALL OTHER WORK. *************************************
- Issued Jul 15, 2026
3 units
New Construction · FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE TO INCLUDE CELLAR, ROOF DECK ACCESSED BY ROOF DECK ACCESS STRUCTURE AND TWO REAR DECKS. FOR USE AS MULTI-FAMILY (3 UNIT) HOUSEHOLD LIVING. AS PER APPROVED PLANS. ********************SEPARATE PERMITS FOR ANY OTHER WORK. *************************************
- Issued Jul 15, 2026
4 units
New Construction · FOR THE NEW CONSTRUCTION OF THREE (3) STORY VB CONSTRUCTION TYPE WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR THE USE OF MULTI-FAMILY (4 UNITS) DWELLINGS- R2 OCCUPANCY. BUILDING TO BE FULLY SPRINKLERED PER MIN. NFPA 13R. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE PERMIITS
- Issued Jul 15, 2026
3 units
New Construction · FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE TO INCLUDE CELLAR, ROOF DECK ACCESSED BY ROOF DECK ACCESS STRUCTURE AND TWO REAR DECKS. FOR USE AS MULTI-FAMILY (3 UNIT) HOUSEHOLD LIVING. AS PER APPROVED PLANS. ********************SEPARATE PERMITS FOR ANY OTHER WORK. *************************************
- Issued Jul 15, 2026
3 units
New Construction · FOR UNDERPINNING AND FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE TO INCLUDE CELLAR, ROOF DECK ACCESSED BY ROOF DECK ACCESS STRUCTURE AND TWO REAR DECKS. FOR USE AS MULTI-FAMILY (3 UNIT) HOUSEHOLD LIVING. AS PER APPROVED PLANS. ********************SEPARATE PERMITS FOR ANY OTHER WORK. *************************************
- Issued Jul 15, 2026
4 units
New Construction · FOR THE NEW CONSTRUCTION OF THREE (3) STORY VB CONSTRUCTION TYPE WITH REAR DECKS AT 2ND AND 3RD FL., ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR THE USE OF MULTI-FAMILY (4 UNITS) DWELLINGS- R2 OCCUPANCY. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 201
- Issued Apr 21, 2026
3 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY STRUCTURE OF TYPE V-B CONSTRUCTION WITH BASEMENT, ROOF DECK, AND ROOF DECK ACCESS STRUCTURE FOR USE AS THREE (3) DWELLING UNITS (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK.
- Issued Apr 21, 2026
3 units
New Construction · FOR THE ERECTION OF AN ATTACHED 3-STORY STRUCTURE WITH ROOF ACCESS STRUCTURE FOR ACCESS TO AN OCCUPIABLE ROOF DECK. STRUCTURE FOR USE AS MULTI-FAMILY HOUSEHOLD LIVING THREE (3) DWELLING UNITS. THE BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 9 F
- Issued Apr 21, 2026
3 units
New Construction · FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH CELLAR, ROOF DECK AND ROOF-DECK ACCESS STRUCTURE FOR USE AS MULTI-FAMILY HOUSEHOLD LIVING (THREE DWELLING UNITS). BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13R. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION. *AMEND 6/25/2026; ELIMINATE UNDERPINNING, INCREASE BUILDING HEIGHT, REVISE EXCAVATION PLAN/CALCULATIONS, AND CHANGE DPRC-SI PER AMENDED CONSTRUCTION DOCUMENTS*
- Issued Mar 13, 2026
4 units
New Construction · NEW CONSTRUCTION OF A THREE (3) STORY BUILDING WITH BASEMENT AND PRIVATE ROOF DECKS WITH PILOT HOUSES FOR USE AS A FOUR (4) FAMILY DWELLING AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Mar 10, 2026
3 units
New Construction · FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH CELLAR, ROOF DECK AND ROOF-DECK ACCESS STRUCTURE. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Mar 10, 2026
3 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED BUILDING OF TYPE VB CONSTRUCTION WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR THE USE OF R2 OCCUPANCY- 3 DWELLING UNITS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 8.5 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC.
- Issued Feb 26, 2026
2 units
New Construction · FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH A CELLAR, REAR DECK ACCESS FROM SECOND FLOOR AND ROOF DECK ACCESSD FROM ROOF DECK ACCESS STRUCTURE. FOR USE AS TWO-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. **************************SEPARATE PERMITS FOR ELECTRICAL, PLUMBING AND FIRE-SUPPRESSION SYSTEM. ******************************
- Issued Feb 26, 2026
2 units
New Construction · FOR NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK AND A ROOF DECK ACCESS STRUCTURE. FOR USE AS A TWO-FAMILY DWELLING THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED PER NFPA 13D.**EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBING WORK INCLUDED** SEPARATE PERMITS REQUIRED FOR ALL FIRE SUPPRESSION SYSTEMS INSTALLATION. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.**ENERGY
- Issued Feb 17, 2026
3 units
New Construction · FOR THE ERECTION OF AN ATTACHED THREE (3) STORY STRUCTURE OF TYPE V-B CONSTRUCTION FOR USE AS A THREE (3) FAMILY DWELLING (GROUP R-2). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK.
- Issued Feb 11, 2026
2 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS TWO FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY
- Issued Jan 21, 2026
2 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS TWO FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY
- Issued Nov 6, 2025
3 units
New Construction · FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH CELLAR, ROOF DECK AND ROOF-DECK ACCESS STRUCTURE. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Sep 23, 2025
3 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE AS PER APPROVED PLANS. FOR USE AS THREE (3) DWELLING UNITS. STRUCTURE TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 MINIMUM (EXTERIOR WALL OPENINGS). **SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.** **2018 IBC**
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated September 17, 2026.