- Issued Jul 2, 2026
Addition and/or Alteration · Installation of a 5.16 KW DC solar photovoltaic system consisting of 12 solar photovoltaic modules as per 2017 NEC.
- Issued Jun 27, 2026
Addition and/or Alteration · Wiring a three-story dwelling unit that is a mixed use dwelling which includes three apartments and a commercial use space. Installing metallic and non-metallic cables, electrical conduit for the power, lighting, receptacles, smoke alarms, appliances and fire alarm devices and each apartment and vacant commercial space (SEPARATE FITOUT PERMIT REQ'D) and the common areas throughout the building. Installing a 400 amp main service &supply power to each other panels in the building.-PER APPROVED DRA
- Issued Jun 15, 2026
Addition and/or Alteration · Rooftop PV Solar System 31 Panels. 13.640kW (DC) GP-2026-003430 Amended 7/6/26 Reduce the number of panels from 31 to 25 all work per approved plans uploaded 6/22/26
- Issued Jun 11, 2026
Addition and/or Alteration · Total rewire. Installing new receptacles, switches, lighting, smoke detectors using nonmetallic Romex cable throughout the apartment. Two apartment units getting converted into one unit.
- Issued Jun 4, 2026
Addition and/or Alteration · Complete rewire. Installing new non-metallic Romex cables for lighting receptacles smoke detectors appliances etc. Replacing the existing 100 amp electrical service with a 200 amp electrical service.
- Issued May 29, 2026
Addition and/or Alteration · Rooftop PV Solar System 14 Panels. 5.810kW (DC) In Accordance with attached EZ standard
- Issued May 29, 2026
Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 4.5 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER PLANS.
- Issued May 29, 2026
Addition and/or Alteration · Installation of Rooftop PV Solar System 36 Panels. 14.940kW (DC) .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued May 14, 2026
Addition and/or Alteration · Complete rewire. Installing new non-metallic Romex cables for lighting receptacles smoke detectors appliances etc.
- Issued May 11, 2026
Addition and/or Alteration · Electrical Permit for combo RP-2026-004044
- Issued May 5, 2026
Addition and/or Alteration · Rooftop PV Solar System 22 Panels. 9.130kW (DC) In Accordance with attached EZ standard
- Issued May 5, 2026
Addition and/or Alteration · Installing a 200 amp electrical service. Installing a 200 amp panel, meter socket, cable
- Issued May 5, 2026
Addition and/or Alteration · UPGRADE TO 200 AMP ELECTRICAL SERVICE, METER SOCKET AND MAIN CIRCUIT BREAKER PANEL WITH PROPER GROUNDING AND BONDING. INSTALL WIRING, LIGHTING, SWITCHES AND RECEPTACLE OUTLETS. INSTALL INTERCONNECTED 120 VOLT SMOKE AND CO ALARMS. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC 70 AND PER APPROVED PLANS.
- Issued May 5, 2026
Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 9.96 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER PLANS.
- Issued May 4, 2026
Addition and/or Alteration · INSTALL NEW PANELBOARDS AND ASSOCIATED BRANCH CIRCUIT WIRING. RECONNECT AND REROUTE EXISTING INTERIOR LIGHTING TO NEW PANELS AND REPLACE EXTERIOR LIGHTING FIXTURES LIKE-FOR-LIKE. INSTALL NEW WIRING, SWITCHING, EXIT SIGNS, EMERGENCY LIGHTING, AND GENERAL-USE RECEPTACLE OUTLETS. PROVIDE POWER CONNECTIONS, DISCONNECTS, AND ASSOCIATED WIRING FOR MECHANICAL EQUIPMENT, EXHAUST FANS, AND SIGNAGE AS SHOWN. ALL WORK TO BE INSTALLED IN ACCORDANCE WITH THE 2017 NEC AND PER APPROVED PLANS.
- Issued Apr 24, 2026
Addition and/or Alteration · Replacing a smoke detector and installing two circuits for a washer and dryer
- Issued Apr 22, 2026
Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 5.39 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER PLANS.
- Issued Apr 13, 2026
Addition and/or Alteration · Installation of a 400-amp service, interior wiring of three dwelling units, and common areas. All work per approved plans, NEC 2017 ***NO FIRE ALARM ON THIS PERMIT.***
- Issued Apr 10, 2026
Addition and/or Alteration · Install a 600-amp electrical service with 7 (7) meter packs, including proper grounding and bonding. Install one (1) 100-amp subpanel for the house panel and one (1) 100-amp subpanel for each of the six (6) dwelling units. Provide electrical wiring throughout the building, including installation of lighting fixtures, switches and receptacle outlets. Install interconnected smoke and carbon monoxide alarms. All work shall be performed in accordance with the 2017 NEC and per approved plans.
- Issued Apr 9, 2026
Addition and/or Alteration · Complete rewire. Installing new non-metallic Romex cables for lighting receptacles switches smoke detectors etc throughout the house. Replacing the existing 100 amp electrical service with a new 100 amp electrical service.
- Issued Apr 8, 2026
Addition and/or Alteration · Complete rewire. Installing new non-metallic Romex cables for lighting power smoke detectors appliances devices etc. Unit number 21 J & K.
- Issued Apr 7, 2026
Addition and/or Alteration · Complete rewire installing new non-metallic Romex Electrical cables for lighting receptacles switches smoke detectors etc throughout the house. Replacing the existing 100 amp electrical service with a new 100 amp electrical service
- Issued Mar 30, 2026
Addition and/or Alteration · Install a 9.54 kW DC Rooftop Photovoltaic Solar System, consisting of (23) solar photovoltaic modules as per 2017 NEC.
- Issued Mar 23, 2026
Addition and/or Alteration · Install a 5.395 kW DC Rooftop PV Solar System consisting of 13 solar photovoltaic Panels as per 2017 NEC.
- Issued Mar 23, 2026
Addition and/or Alteration · Installation of solar array in accordance with signed standard
- Issued Mar 23, 2026
Addition and/or Alteration · Rooftop PV Solar System 11 Panels. 4.565kW (DC) In Accordance with the attached EZ standard
- Issued Mar 20, 2026
Addition and/or Alteration · Install a 22.410 kW DC Rooftop PV Solar System consisting of 54 solar photovoltaic Panels as per 2017 NEC. AMENDMENT: Revise electrical plan diagram to reflect a 100A back fed breaker with #2 AWG THWN-2 feeders from the disconnect to the main panel, and #2 AWG THWN-2 feeders from the disconnect to the combiner box with one #6 grounding conductor as per 201 NEC.
- Issued Mar 20, 2026
Addition and/or Alteration · Wiring a two family dwelling unit. Installing new non-metallic Romex cables for lighting, power for receptacles, appliances, smoke detectors etc throughout the house. Installing a 300 amp service cable, two 100 amp panels and a 60 amp panel for the common area.
- Issued Mar 16, 2026
Addition and/or Alteration · Wiring the basement in the house. Installing non-metallic Romex cables supplying power for lighting, receptacles, 120 volt and 240 volt power for a heat pump dryer, baseboard heaters, smoke detectors etc
- Issued Mar 12, 2026
Addition and/or Alteration · Complete rewire. Installing new non-metallic Romex cables for power, lighting smoke detectors, appliances etc. Installing a 200 amp electrical service.
- Issued Mar 10, 2026
Addition and/or Alteration · Rooftop PV solar system of 11 panels. 4.565kW In Accordance with attached EZ standard
- Issued Mar 2, 2026
Addition and/or Alteration · Electrical Permit for combo RP-2025-012160
- Issued Mar 2, 2026
Addition and/or Alteration · Installation of a 400 amp service for a two family dwelling. wiring Of dwelling units and common areas All work Per NEC 2017
- Issued Mar 2, 2026
Addition and/or Alteration · Install telecommunications wiring for Burlington Coat Factory, including low-voltage cabling, raceways, back boxes, terminations, and supports as required. All work to be performed in accordance with applicable codes and approved plans.
- Issued Feb 26, 2026
Addition and/or Alteration · Complete rewire. Installing new non-metallic Romex cable for lighting, receptacles, smoke detectors, appliances etc. Replacing a 100 amp service with an updated 100 amp service.
- Issued Feb 18, 2026
Addition and/or Alteration · Replacing the existing 200 amp electrical service with a new 200 amp electrical service to bring it up to code.
- Issued Feb 17, 2026
Addition and/or Alteration · Re wiring one apartment inside of a condo (apartment) building. Installing new non-metallic Romex cables receptacles switches lighting smoke detectors etc throughout the dwelling. All work to be done according to the 2017 NEC and per approved plans.
- Issued Feb 2, 2026
Addition and/or Alteration · Amend Permit 3/19/2026 - Change Electrical Agency. Electrical Permit for combo RP-2025-011521
- Issued Jan 14, 2026
Addition and/or Alteration · Complete rewire. Replacing the old electrical cable with new non-metallic Romex cables. Installing new lighting receptacles switches smoke detectors etc. Installing a 200 amp electrical service.
- Issued Dec 31, 2025
Addition and/or Alteration · INSTALL 400 AMP ELECTRICAL SERVICE AND 3 METER PACKS WITH PROPER GROUNDING AND BONDING. INSTALL ONE 60 AMP SUBPANEL FOR HOUSE, ONE 150 AMP SUBPANEL FOR COMMERCIAL SPACE AND ONE 150 AMP SUBPANEL FOR DWELLING UNIT. INSTALL WIRING, LIGHTING, SWITCHES, EXIT SIGNS AND RECEPTACLE OUTLETS. INSTALL INTERCONNECTED SMOKE AND CO ALARMS. INSTALL FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER APPROVED PLANS.
- Issued Dec 19, 2025
Addition and/or Alteration · Installing a light switch inside a office. Relocate an emergency exit sign. Adding additional receptacles inside the office. Installation shall comply with 2017 NEC.
- Issued Dec 18, 2025
Addition and/or Alteration · Complete rewire. Installing new non-metallic Romex cables for circuits. Installing new lighting, receptacles, switches, smoke detectors etc. Installing a new 200 amp electrical service.
- Issued Dec 18, 2025
New Construction · Electrical Permit for combo RP-2024-002112
- Issued Dec 8, 2025
Addition and/or Alteration · Electrical Permit for combo RP-2025-011262
- Issued Dec 1, 2025
Addition and/or Alteration · Wiring the kitchen and laundry room. Fishing non-metallic Romex cable from the panel through the basement ceiling to the kitchen and laundry area walls inside the house. Replacing the receptacles and switches throughout the house. Installing a 200 amp service conductor for a meter enclosure and installing 3 meters and three electrical panels in the dwelling . That was a mistake my apologies is not a two-family dwelling
- Issued Nov 26, 2025
Addition and/or Alteration · Installing a 200 amp service cable and a 200 amp meter socket, recess ed lighting throughout the unit A GFCI receptacle on the kitchen island, smoke detectors, receptacles in the front and back on the exterior of the house installing now metallic electrical cables etc
- Issued Nov 20, 2025
Addition and/or Alteration · Rewiring a kitchen inside the house. Removing the old knob and tube conductors and replacing them with non-metallic Romex cable. Installing new switches, receptacles, lighting and circuits for the appliances etc. Installing a 200 amp electrical service
- Issued Nov 15, 2025
Addition and/or Alteration · Complete rewire installing new non-metallic Romex cables receptacles switches lighting smoke detectors etc installing a 200 amp electrical service
- Issued Nov 14, 2025
Addition and/or Alteration · Complete rewire installing new non-metallic Romex cable, receptacles switches lighting smoke detectors etc. Installing a 200 amp electrical service
- Issued Nov 11, 2025
Addition and/or Alteration · Rewiring the bedrooms, kitchen and bathrooms inside the house. Replacing the receptacles switches lighting adding smoke detectors and non-metallic Romex cable etc
- Issued Nov 6, 2025
Addition and/or Alteration · INSTALL LIGHTING, SWITCHES, EMERGENCY LIGHTING AND RECEPTACLE OUTLETS. INSTALL DEDICATED BRANCH CIRCUIT FOR ALL APPLICANCES. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS.
- Issued Oct 30, 2025
Addition and/or Alteration · Total rewire. Installing new receptacles switches lighting smoke detectors non metallic romex cable throughout the apartment unit.
- Issued Oct 16, 2025
Addition and/or Alteration · Installing circuits for recessed lighting, washer, dryer, dishwasher, refrigerator and ceiling fans
- Issued Oct 9, 2025
Addition and/or Alteration · Complete rewire. Installing new non-metallic Romex cable fishing the cables from the panel through the walls and ceilings inside the house. Installing new receptacles switches lighting smoke detectors electrical boxes etc. Installing a new 100 amp electrical service.
- Issued Oct 7, 2025
Addition and/or Alteration · Complete rewire. Installing new non-metallic (Romex) cable fishing the cables from the panel through the walls and ceilings inside the house. Installing new receptacles switches lighting smoke detectors, electrical boxes etc. Installing a new 100 amp electrical service. FISHING ALL WIRES
- Issued Sep 25, 2025
Addition and/or Alteration · Complete rewire. Removing the old electrical wire and devices and replacing them with new non-metallic Romex cables, receptacles, switches, lighting, smoke detectors etc. Upgrading the electrical service to 200 amps.
- Issued Sep 16, 2025
Addition and/or Alteration · Installing electrical circuits for bathroom light fixtures, exhaust fans. Receptacles, exterior fixtures etc fishing the cables from the panel through the walls and the ceiling to get to the locations throughout the house. Installing Arc fault and ground fault breakers and devices.
- Issued Sep 15, 2025
Addition and/or Alteration · Re wiring one suite in two separate apartments. Installing new electrical cables, receptacles, switches, lighting, smoke detectors etc.
- Issued Sep 10, 2025
Addition and/or Alteration · THIS IS A REWIRE ONLY NO NEW BATHROOM, KITCHEN, OR FRAMING THIS IS A PHDC REWIRE FOR A COMPLETE 2 STORY OCCUPIED PROPERTY. TO INCLUDE THE FOLLOWING SCOPE: * UP TO 20 BRANCH CIRCUITS, 15A AND 20A, INCLUDING ALL CABLING, BOXES AND CONNECTORS * UP TO 32 RECEPTACLES, TAMPER PROOF, INCLUDING ALL PROVISIONS FOR GFCIs IN BATHROOMS, LAUNDRY, AT PANEL, KITCHEN AND OUTDOOR RECEPTACLES * UP TO 16 ROCKER SWITCHES, INCLUDING ALL NECESSARY 3-WAY SWITCHES; *LIVING ROOM TO INCLUDE EITHER AN OVERHEAD LIGHT OR A
- Issued Sep 9, 2025
Addition and/or Alteration · Installing electrical circuits for lighting, receptacles for a washer and dryer. Ceiling fans, dishwasher, fridge
- Issued Sep 5, 2025
Addition and/or Alteration · Complete rewire. Removing the old electrical wire and replacing it with new non-metallic Romex cables. Installing new receptacles, switches, lighting, smoke detectors etc. Upgrading the electrical service to 200 amps.
- Issued Sep 3, 2025
Addition and/or Alteration · Electrical Permit for combo RP-2025-007292
- Issued Aug 16, 2025
Addition and/or Alteration · Wiring a garage/shed. Installing receptacles, switches, lighting, heater etc. the wires will be fish through electrical conduits such as electrical metallic tubing and PVC conduit that is being installed surface mounted onto the walls and the ceiling.
- Issued Aug 8, 2025
Addition and/or Alteration · Complete wiring including switches outlets lights hardwired detectors 100 amp panel and service in each of 2 units as per code
- Issued Aug 6, 2025
Addition and/or Alteration · Complete rewire. Removing the old electrical wire and replacing it with new non-metallic Romex cables. Installing new receptacles, switches, lighting, smoke detectors etc. Upgrading the electrical service to 200 amps
- Issued Aug 4, 2025
Addition and/or Alteration · Amended 8/7/25 Complete rewire, remove the existing knob and tube, and replace with romex. Install new receptacles, switches, lighting, and smoke detectors etc Electrical Permit for combo RP-2025-002346
- Issued Jul 18, 2025
Addition and/or Alteration · INSTALL A 800 AMP SINGLE PHASE SERVICE, (15) GANG 800 AMP METER BANK, (12) 125 AMP PANEL & FEEDERS, (1) 100 AMP PANEL & FEEDER. INSTALL WIRING THROUGHOUT THE COMMON AREAS & TWELVE DWELLING UNITS. INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES, SENSORS, RECEPTACLES, AND SMOKE ALARMS. PROVIDE POWER FOR THE MECHANICAL & HVAC EQUIPMENT AS PER 2017 NEC. INSTALL A NEW FIRE ALARM SYSTEM THROUGHOUT AS PER 2016 NFPA 72.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.