Owner of record
Mastery Charter Schools F
2 permits · 42 violations
- Records on file
- 44
Permits (as owner)
2 entries
- Issued Jun 19, 2026
Addition and/or Alteration · Installation of new 400 amp MLO panel fed from existing MDP. Install HVAC hook-ups, lighting fixtures, switches, and local controls per submitted plans and 2017 NEC.
- Issued Jun 11, 2026
Addition and/or Alterations · FOR THE PARTIAL DEMOLITION OF 43 REGISTERS, DIFFUSERS, AND FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
Violations
42 entries
- Violation Jun 22, 2026OPEN
RECORD KEEPING
- Violation Jun 22, 2026OPEN
RELIABILITY
- Violation Jun 22, 2026OPEN
MEANS OF EGRESS CONTINUITY
- Violation Jun 22, 2026OPEN
POSTING OF OCCUPANT LOAD
- Violation Jun 22, 2026OPEN
PERIODIC TESTING
- Violation Jun 22, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Jun 22, 2026OPEN
EXIT DOORS
- Violation Jun 22, 2026OPEN
RECORDS
- Violation Jun 22, 2026OPEN
HAZARD IDENTIFICATION SIGNS
- Violation Jul 29, 2025OPEN
EXIT SIGN ILLUMINATION
- Violation Jul 29, 2025OPEN
EXIT DOORS
- Violation Jul 29, 2025OPEN
FIRE EXTINGUISHER HANGERS & BRACKETS
- Violation Jul 29, 2025OPEN
FIRE EXTINGUISHERS
- Violation Jul 29, 2025OPEN
STORAGE IN BUILDINGS
- Violation Jul 29, 2025OPEN
HAZARD IDENTIFICATION SIGNS
- Violation Jul 29, 2025OPEN
POSTING OF OCCUPANT LOAD
- Violation Jul 29, 2025OPEN
ACCEPTANCE CRITERIA & REPORTS
- Violation Jul 29, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Jul 24, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Jul 24, 2025OPEN
STORAGE
- Violation Jul 24, 2025OPEN
ACCEPTANCE CRITERIA & REPORTS
- Violation Jul 24, 2025OPEN
GROUP E OCCUPANCIES
- Violation Jul 24, 2025OPEN
RECORD KEEPING
- Violation Jul 24, 2025OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Jul 24, 2025OPEN
PERIODIC TESTING
- Violation Jul 24, 2025OPEN
POSTING OF OCCUPANT LOAD
- Violation Jul 24, 2025OPEN
LOCKDOWN PLAN CONTENTS
- Violation Jul 24, 2025OPEN
LABELING
- Violation Jul 24, 2025OPEN
FDC LOCKING CAPS
- Violation Jul 24, 2025OPEN
UNAPPROVED CONDITIONS
- Violation Jul 22, 2024OPEN
PERIODIC TESTING
- Violation Jul 22, 2024OPEN
LABELING
- Violation Jul 22, 2024OPEN
HAZARD IDENTIFICATION SIGNS
- Violation Jul 22, 2024OPEN
SUBMISSION OF CERTIFICATIONS
- Violation Jul 22, 2024OPEN
SUBMISSION OF CERTIFICATIONS
- Violation Jul 22, 2024OPEN
POSTING OF OCCUPANT LOAD
- Violation Jul 22, 2024OPEN
EXIT SIGNS
- Violation Jul 22, 2024OPEN
EXIT SIGN ILLUMINATION
- Violation Jul 22, 2024OPEN
HAZARD IDENTIFICATION SIGNS
- Violation Jul 22, 2024OPEN
PERIODIC TESTING
- Violation Jul 22, 2024OPEN
RECORDS
- Violation Jul 22, 2024OPEN
FIRE EXTINGUISHERS REQUIRED
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.