Entity File · The Public Record
Company / LLC
Mmb Contractors INC
56 permits
- Records on file
- 56
Built (as contractor)
56 entries
- Issued Jul 6, 2026
Addition and/or Alteration · Fire alarm installed in restaurant per approved plans. No Induction burners installed. A separate permit will be required for any Hood installation and Ansul systems.
- Issued Jun 25, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE THE ERECTION OF ELEVATOR SHAFT, PARTITIONS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELEVATOR, MEP, AND FIRE SUPPRESSION WORK. *2018 IEBC* *ROURKE & SONS, INC TO CONDUCT STEEL FABRICATION*
- Issued Jun 23, 2026
Alterations · Install one 3-compartment sink, mop sink, prep sink, two hand sinks, four indirect drains, water heater as per attached plans.
- Issued Jun 23, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jun 16, 2026
Alterations · INSTALL 1 MOP SINK, 1 WATER CLOSET, 1 LAVATORY, 2 AESTHETICAN WASH SINK, 2 FACE WASH SINKS, 4 P TRAPS, 1 WATER FOUNTAIN AND 1 HOT WATER HEATER. all piping must be metallic installed to the 2018 PPC sec 919
- Issued Jun 16, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jun 11, 2026
Addition and/or Alteration · Electrical fit-out including new 150A panel, equipment circuits, receptacles, lighting, and exit signs and emergency lighting.
- Issued Jun 8, 2026
Addition and/or Alteration · Electrical distribution equipment plus panel and breakers, feed wiring, boxes, wiring devices for all power. Installation of all feed wiring, boxes, and light fixtures for all lighting. Installation of wiring and power for all mechanical equipment . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Jun 4, 2026
Alterations · Plumbing work for Somedays Bakery per attached drawings.
- Issued Jun 3, 2026
Addition and/or Alteration · GP-2026-001555 Connect (1) illuminated wall sign to existing electric
- Issued Jun 1, 2026
Addition and/or Alteration · INSTALLATION OF RECEPICALES ALL RECEPTACLES TO BE TAMPER-RESISTANT RECEPTACLES INSTALLATION OF LIGHTING AND LIGHTING CONTROLS MECHANICAL EQUIPMENT POWER HOOK UPS. ALL WORK PER APPROVED PLANS. ***NO FIRE ALARM ON THIS PERMIT***
- Issued May 27, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNITS, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
- Issued May 22, 2026
Alterations · Install 36 lavatories, 16 water closets, 12 floor drains, 10 kitchen sinks, 1 three compartment sink, 1 two compartment sink, 2 floor sinks, 2 hose bibbs. 1 grease interceptor, 1 drinking fountain, 1 mop sink, 1 washing machine, 1 hot water heater and 1 backflow preventer. All work to be done according to the 2018 PPC and per approved plans.
- Issued May 21, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS EATING AND DRINKING ESTABLISHMENTS- TAKE-OUT RESTAURANT. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued May 19, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 19, 2026
Alterations · ALTERATIONS TO 4 FAMILY DWELLING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued May 19, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 13, 2026
Addition and/or Alteration · For interior structural alterations to an existing attached structure per plans. Separate permits are required for all other interior alteration and all associated Mechanical, Electrical, and Plumbing work. Basement to remain non-habitable, to be used for storage and utilities only.
- Issued May 13, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PERSONAL SERVICES AT BASEMENT AND 1ST FLOOR. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Apr 27, 2026
Change of Use · Public, Civic, and Institutional - Libraries and Cultural Exhibits
- Issued Apr 1, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO (INCLUDING A CHANGE IN OCCUPANCY) AN EXISTING TENANT SPACE ON THE 1ST FLOOR LEVEL OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS NOT SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Mar 26, 2026
1 units
Addition and/or Alteration · FOR CHANGE OF OCCUPANCY AT 1ST FLOOR TO GROUP B TO INCLUDE NEW PARTITONS, EQUIPMENT, MILLWORK, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- Issued Mar 26, 2026
Change of Use · Wholesale, Distribution, and Storage - Wholesale Sales and Distribution
- Issued Mar 24, 2026
4 units
Addition and/or Alteration · FOR CHANGE OF OCCUPANCY TO R-2 (FOUR (4) DWELLING UNITS) AND LEVEL III ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- Issued Mar 16, 2026
1 units
New Construction (Shell Only) · FOR A NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A DECK ACCESSED THROUGH THE THIRD FLOOR . FOR THE CREATION OF A SHELL SPACE. **BUILDING SHALL BE FULLY SPRINKLERED PER NFPA13 PRIOR TO OCCUPANCY**SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.**ENERGY CODE COMPLIANCE IN ACCORDANCE
- Issued Feb 9, 2026
Alterations · Install 4 inch water service, 4 inch fire service, 10 inch sanitary drain, 8 inch storm drain, FAIs. 1 building drain and 1 backflow preventer. All work to be done according to the 2018 PPC and per approved plans.
- Issued Dec 12, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. AMENDMENT APPROVED AS OF 6/5/26: TO UPDATE THE STRUCTURAL PLANS AND TO INLCUDE UNDERPINNING. SIZE AND LOCATION AS SHOWN IN THE AMENDED PLANS.
- Issued Dec 11, 2025
Addition and/or Alteration · Electrical Permit for combo CP-2025-005100 Install new lighting, receptacles, tele/data wiring, and provide power to equipment as per 2017 NEC. Electrical service and panels are existing. ***NOT APPROVED FOR THE INSTALLATION OF FIRE ALARM***
- Issued Dec 11, 2025
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2025-005100 For the installation of HVAC appliances, GRDs, and associated ductwork, fuel gas piping, and Type 1 commercial kitchen hood exhaust system as per approved plans and in accordance with 2018 IMC. Separate permits to be obtained for all other work.
- Issued Dec 10, 2025
Alterations · Plumbing Permit (Interior) for combo CP-2025-005100 Alterations to existing building. Interior installation of drainage, waste, vent, and water supply for listed fixtures connecting to existing metallic piping. ALL piping utilized in this project shall be metallic to roof extension. Venting to be designed and installed in accordance with section 919 Philadelphia single stack vent system. All work to be performed in strict compliance with 2018 PPC and approved plans.
- Issued Dec 9, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS AND THE ERECTION OF A MEZZANINE TO AN EXISTING ONE (1) STORY STRUCTURE WITHOUT A CHANGE TO EXISTING GROUP A-2 SIT-DOWN RESTAURANT OCCUPANCY. BUILDING IS NOT SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, AND PLUMBING WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. SEE ZP-2025-007787 FOR ZONING APPROVAL OF G.F.A. INCREASE.
- Issued Dec 8, 2025
New Construction or Additions · INTERIOR AND EXTERIOR PLUMBING FOR RENOVATION AND 6 STORY ADDITION. EXTERIOR PLUMBING TO INCLUDE CURB TRAP, FRESH AIR INLET, MAIN DRAIN, AND 4" WATER DISTRIBUTION PIPE. INTERIOR INSTALLATION OF DRAINGE, WASTE, VENT, AND WATER SUPPLY FOR 786 FIXTURES. ALL WORK PERFOMRED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Nov 21, 2025
Addition and/or Alteration · Electrical Permit for combo RP-2025-011769
- Issued Nov 21, 2025
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo RP-2025-011769
- Issued Nov 20, 2025
Addition and/or Alteration · Level III non structural Alterations to an Existing One Family Dwelling as per attached drawings.
- Issued Nov 13, 2025
Alterations · INTERIOR ALTERATIONS TO EXISTING SCHOOL. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR 3 NEW FIXTURES PER PLANS. ALL OTHER FIXTURES PER APPLICATION ARE DIRECT REPLACEMENT WITHOUT PIPING. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL MATERIALS TO BE METALLIC AND CONNECT TO EXISTING METALLIC PIPING. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Nov 11, 2025
Addition and/or Alteration · Install new electrical wiring, devices, lighting fixtures, and equipment as per attached plan as per 2017 NEC.
- Issued Nov 6, 2025
Addition and/or Alteration · 200amp service rewire the whole house - 50 outlets, 60 recessed lights, 4 ceiling fans, hvac unit
- Issued Oct 29, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Oct 27, 2025
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF THE 1ST FLOOR OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE SELECTIVE DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Sep 24, 2025
Alterations · SEAL LATERAL PA20251742434 REMOVE TRAP AND HERMETICALLY SEALING THE LATERAL BY A CAP OR PLUG ."ALL EXCAVATIONS AND PLUMBING TRENCHES IN EXCESS OF 5 FEET IN DEPTH MUST HAVE APPROVED SHORING IN PLACE AT THE TIME OF INSPECTION"
- Issued Aug 13, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS AND EXPANSION OF EXISTING MEZZANINE. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK. *AMEND 2/5/26; CHANGE DPRC-SI PER AMENDED CONSTRUCTION DOCUMENTS*
- Issued Aug 12, 2025
New construction, addition, GFA change · For the addition of an interior mezzanine to increase the total gross floor area to 114%.
- Issued Aug 8, 2025
Addition and/or Alteration · Electrical Permit for combo RP-2023-012310
- Issued Jul 25, 2025
1 units
Addition and/or Alteration · FOR THE INSTALLATION OF AN AUTOMATED TELLER MACHINE. ALL WORK TO BE COMPLETED PER APPROVED PLANS. **SEPARATE PERMIT REQUIRED FOR ANY ELECTRICAL WORK**
- Issued Jul 24, 2025
Addition and/or Alteration · Electrical Permit for combo CP-2024-006439
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.