Entity File · The Public Record
Contractor
Mr D's Plumbing & Heating
283 permits
- Records on file
- 283
Built (as contractor)
283 entries
- Issued Oct 22, 2026
Alterations · REPLACE CURB TRAP, FRESH AIR INLET AND HOUSE DRAIN - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Oct 22, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE 3/4" WATER LINE.
- Issued Oct 20, 2026
Alterations · 3/4" WATER SERVICE - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Oct 14, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE HOUSE DRAIN FROM BASEMENT TO REAR OF HOUSE. REPLACE STAND PIPE. REPLACE COMBO AREA DRAIN
- Issued Oct 9, 2026
Alterations · 3/4" WATER SERVICE - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Oct 9, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Oct 8, 2026
Alterations · CURB TRAP AND FAI - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Oct 6, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE 3/4" WATER LINE
- Issued Oct 1, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CT & FAI.
- Issued Oct 1, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CT, FAI, MD & 3/4" WATER LINE.
- Issued Oct 1, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE 3/4" WATER LINE
- Issued Sep 29, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CT & FAI.
- Issued Sep 28, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CURB TRAP, FRESH AIR INLET, HOUSE DRAIN, MAIN DRAIN IN BASEMENT, RAIN WATER CONDUCTOR & 3/4" WATER LINE.
- Issued Sep 21, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Sep 21, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE 3/4" WATER LINE. SUPPLY AND INSTALL A NEW 3/4" RPZ BACKFLOW DEVICE.
- Issued Sep 21, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CT, FAI & MD.
- Issued Sep 18, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CURB TRAP, FRESH AIR INLET AND MAIN DRAIN IN BASMENT. .
- Issued Sep 18, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE CURB TRAP AND FRESH AIR INLET REAR OF PROPERTY
- Issued Sep 17, 2026
Alterations · Amend Permit ADDITIONALREPAIRS. REPLACE CURB TRAP, FRESH AIR INLET, AREA DRAIN. FRONT ROOF DRAIN AND SIDE ROOF DRAIN. REAR AREA DRAIN. Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE EXTERIOR MD & INTERIOR MD IN BASEMENT.
- Issued Sep 17, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CT & FAI.
- Issued Sep 16, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CURB TRAP. FRESH AIR INLET. HOUSE DRAIN. MAIN DRAIN IN BASEMENT. STANDPIPE
- Issued Sep 11, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Sep 10, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. SEAL LATERAL FOR DEMO.
- Issued Sep 10, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. SEAL LATERAL FOR DEMO.
- Issued Sep 10, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. SEAL LATERAL FOR DEMO.
- Issued Sep 8, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE REAR MAIN DRAIN AND COMBO AREA DRAIN
- Issued Sep 3, 2026
Alterations · REPLACE 3/4" WATER LINE - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Sep 3, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE SECTION OF MAIN DRAIN IN BASEMENT
- Issued Sep 3, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE MAIN DRAIN IN BASEMENT, STANDPIPE, AND REAR AREA DRAIN
- Issued Sep 2, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE STORM AND SANITARY CURB TRAPS AND FRESH AIR INLETS
- Issued Aug 21, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CT & FAI.
- Issued Aug 21, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE STORM AND SANITARY CURB TRAPS AND FRESH AIR INLETS
- Issued Aug 20, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing.
- Issued Aug 19, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE MAIN DRAIN
- Issued Aug 19, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE 3/4" WATER LINE
- Issued Aug 19, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing.
- Issued Aug 17, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE MAIN DRAIN IN BASEMENT AND REAR AREA DRAIN
- Issued Aug 17, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CT & FAI.
- Issued Aug 17, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE 3/4" WATER LINE.
- Issued Aug 13, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CT & FAI.
- Issued Aug 11, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing.
- Issued Aug 11, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE SANITARY AND STORM CT, FAI & MDs
- Issued Aug 11, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Aug 6, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE 3/4" WATER LINE, MAIN DRAIN AND FRONT ROOF DRAIN
- Issued Aug 6, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE MAIN DRAIN IN BASEMENT AND REAR YARD AND COMBO AREA DRAIN
- Issued Aug 3, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CT, FAI & MD.
- Issued Aug 3, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. SEAL LATERAL FOR DEMO.
- Issued Jul 30, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Jul 30, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Jul 30, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Jul 30, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Jul 28, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing REPLACE REAR MAIN DRAIN IN BASEMENT. COMBO AREA DRAIN AND LAUNDRY TUB
- Issued Jul 24, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing.
- Issued Jul 24, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. CT, FAI & MD.
- Issued Jul 23, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CURB TRAP AND FRESH AIR INLET
- Issued Jul 21, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Jul 21, 2026
Alterations · - Approved plumbing repair work per attached EZ Permit Standard for Plumbing
- Issued Jul 15, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Jul 15, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Jul 8, 2026
Alterations · Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing
- Issued Jul 8, 2026
Alterations · - Approved plumbing repair work per attached EZ Permit Standard for Plumbing
- Issued Jul 8, 2026
Alterations · The proposed plumbing work associated with an Addition or Alteration requires submittal of applicable EZ Permit Standard for Plumbing - https://www.phila.gov/media/20260622154348/PB_030_F-EZ-Plumbing-Permit-Standards-2026.pdf Standard must be signed and include AP#
- Issued Jul 8, 2026
Alterations · - Approved plumbing repair work per attached EZ Permit Standard for Plumbing
- Issued Jul 6, 2026
Alterations · REPLACE CURB TRAP, FRESH AIR INLET, HOUSE DRAIN, 3/4" WATER LINE, MAIN DRAIN IN BASEMENT AND RAIN WATER CONDUCTOR .
- Issued Jul 1, 2026
Alterations · REPLACE SORM AND SANITARY CURB TRAPS AND FRESH AIR INLETS
- Issued Jun 26, 2026
Alterations · REPLACE UNDERFLOOR PLUMBING FOR LAV, TOILET AND BATHTUB FIRST FLOOR BATHROOM (PIPE ONLY)
- Issued Jun 24, 2026
Alterations · REPLACE CURB TRAP, FRESH AIR INLET, HOUSE DRAIN, MAIN DRAIN IN BASMENT, FRONT RAIN WATER CONDUCTOR AND STAND PIPE FOR LAUNDRY TUB (PIPE ONLY)
- Issued Jun 16, 2026
Alterations · REPLACE CURB TRAP, FRESH AIR INLET, HOUSE DRAIN, MAIN DRAIN IN BASEMENT, COMBO AREA DRAIN
- Issued Jun 11, 2026
Alterations · REPLACE STORM AND SANITARY CURB TRAPS AND FRESH AIR INLETS.
- Issued Jun 11, 2026
Alterations · REPLACE 3/4" WATER SERVICE, CURB TRAP AND FRESH AIR INLET
- Issued Jun 4, 2026
Alterations · REPAIR/REPLACE STORM AND SANITAY CURB TRAPS AND FRESH AIR INLETS.
- Issued Jun 3, 2026
Alterations · REPAIR/REPLACE CURB TRAP, FRESH AIR INLET, HOUSE DRAIN, MAIN DRAIN IN BASEMENT, RAIN WATER CONDUCTOR, COMBO AREA DRAIN AND STAND PIPE IN BASEMENT.
- Issued Jun 1, 2026
Alterations · REPLACE HOUSE DRAIN FROM CURB INTO BASEMENT. REPLACE 3" TRAP FOR ROOF DRAIN AND DRAIN LINES FOR LAUNDRY (PIPE ONLY)
- Issued May 28, 2026
EZ Bathroom & Kitchen Remodel · REPLACE UNDERFLOOR PLUMBING FOR VANITY, TOILET, BATHTUB (PIPE 0NLY) AND KITCHEN SINK
- Issued May 27, 2026
Alterations · REPAIR/REPLACE STORM AND SANITARY CURB TRAPS AND FRESH AIR INLETS.
- Issued May 26, 2026
Alterations · REPLACE MAIN DRAIN IN BASEMENT, REPLACE STACK AND STANDPIPE
- Issued May 20, 2026
Alterations · REPLACE CURB TRAP, FRESH AIR INLET, HOUSE DRAIN, AREA DRAIN AND MAIN DRAIN IN BASEMENT.
- Issued May 7, 2026
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 4, 2026.