THE INDEX: 64 17 · week of Jun 29permits soft, openings quiet, deal ledger quiet

The Philadelphia Index

Entity File · The Public Record

Company / LLC

Nix Homes Preservation LLC

1 property · $7.42M acquired · 22 permits

Records on file
23
Acquired
$7.42M

Acquired

1 entry

  1. Recorded Oct 27, 2025

    $7.42M

    1404-38 N 15th St

    from NIX HOMES INVESTORS LP

Permits (as owner)

22 entries

  1. Issued Apr 30, 2026

    1404-38 N 15th St

    Addition and/or Alteration · Installation of a 9.315 kW solar system, consisting of (23) SOLARSPACE LUMINA I : SS8-54HSB-405M, 405W, (1) TESLA SOLAR 7.600KW [1538000-XX-Y] (240V) INVERTER AND (6) TESLA MCI-2 AS PER 2017 NEC.

  2. Issued Mar 4, 2026

    1404-38 N 15th St

    Solar Panels and Structure · FOR THE INSTALLATION OF ROOF MOUNTED SOLAR PANELS IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIT REQUIRED FOR ELECTRICAL WORK.

  3. Issued Feb 9, 2026

    1404-38 N 15th St

    Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 16.2 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER APPROVED PLANS.

  4. Issued Feb 9, 2026

    1404-38 N 15th St

    Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 12.15 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER APPROVED PLANS.

  5. Issued Feb 5, 2026

    1404-38 N 15th St

    Solar Panels and Structure · FOR THE INSTALLATION OF RESIDENTIAL ROOF MOUNTED SOLAR PANELS AND RELATED APPURTENANCES AS NOTED ON THE APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK, INCLUDING ALL ELECTRICAL WORK. ** NO STATIONARY STORAGE BATTERY SYSTEMS WITH THIS PERMIT **

  6. Issued Feb 3, 2026

    1404-38 N 15th St

    Addition and/or Alteration · Installation of a 16.605 kW DC rooftop solar array consisting of (41) SOLARSPACE LUMINA I : SS8-54HSB-405M, 405W modules and (2) TESLA SOLAR 7.600KW [1538000-XX-Y] (240V) inverters. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. GP-2026-000233: Issued

  7. Issued Jan 28, 2026

    1404-38 N 15th St

    Addition and/or Alteration · Installation of a 15.795 kW solar system, consisting of (39) SOLARSPACE LUMINA I : SS8-54HSB-405M, 405W, (2) TESLA SOLAR 7.600KW [1538000-XX-Y] (240V) INVERTER AND (12) TESLA MCI-2 AS PER APPROVED DRAWINGS-2017 NEC. GP-2026-000232

  8. Issued Jan 28, 2026

    1404-38 N 15th St

    Addition and/or Alteration · Installation of a 19.440 kW solar system, consisting of (48) SOLARSPACE LUMINA I : SS8-54HSB-405M, 405W, (2) TESLA SOLAR 7.600KW [1538000-XX-Y] (240V) INVERTER AND (12) TESLA MCI-2 AS PER APPROVED DRAWINGS-2017 NEC. GP-2026-000230

  9. Issued Jan 27, 2026

    1404-38 N 15th St

    Addition and/or Alteration · Installation of a 16.200 kW solar system, consisting of (40) SOLARSPACE LUMINA I : SS8-54HSB-405M, 405W, (2) TESLA SOLAR 7.600KW [1538000-XX-Y] (240V) INVERTER AND (12) TESLA MCI-2 AS PER APPROVED DRAWINGS-2017 NEC. GP-2026-000164: Issued

  10. Issued Jan 26, 2026

    1404-38 N 15th St

    Solar Panels and Structure · FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS AND STRUCTURE AS PER APPROVED PLANS.

  11. Issued Jan 26, 2026

    1404-38 N 15th St

    Solar Panels and Structure · FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS AND STRUCTURE AS PER APPROVED PLANS.

  12. Issued Jan 26, 2026

    1404-38 N 15th St

    Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 14.58KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER APPROVED PLANS.

  13. Issued Jan 26, 2026

    1404-38 N 15th St

    Solar Panels and Structure · FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS AND STRUCTURE AS PER APPROVED PLANS.

  14. Issued Jan 26, 2026

    1404-38 N 15th St

    Addition and/or Alteration · INSTALLATION OF ROOFTOP MOUNTED 16.2 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER PLANS.

  15. Issued Jan 23, 2026

    1404-38 N 15th St

    Addition and/or Alteration · Installation of a 17.415 kW rooftop solar array consisting of (43) SOLARSPACE LUMINA I : SS8-54HSB-405M, 405W, and (2) TESLA SOLAR 7.600KW [1538000-XX-Y] (240V) inverters, in accordance with the 2017 NEC.

  16. Issued Jan 23, 2026

    1404-38 N 15th St

    Solar Panels and Structure · FOR THE INSTALLATION OF RESIDENTIAL ROOF MOUNTED SOLAR PANELS AND RELATED APPURTENANCES AS NOTED ON THE APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK, INCLUDING ALL ELECTRICAL WORK. ** NO STATIONARY STORAGE BATTERY SYSTEMS WITH THIS PERMIT **

  17. Issued Jan 23, 2026

    1404-38 N 15th St

    Addition and/or Alteration · Installation of a 16.2 kW rooftop solar array consisting of 40 SOLARSPACE LUMINA I : SS8-54HSB-405M, 405W modules, and 2 TESLA SOLAR 7.600KW [1538000-XX-Y] (240V) inverters .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. GP-2026-000165

  18. Issued Jan 23, 2026

    1404-38 N 15th St

    Solar Panels and Structure · FOR THE INSTALLATION OF ROOF-MOUNTED SOLAR COLLECTORS IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**

  19. Issued Jan 12, 2026

    1404-38 N 15th St

    Solar Panels and Structure · FOR THE INSTALLATION OF RESIDENTIAL ROOF MOUNTED SOLAR PANELS AND RELATED APPURTENANCES AS NOTED ON THE APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK, INCLUDING ALL ELECTRICAL WORK. ** NO STATIONARY STORAGE BATTERY SYSTEMS WITH THIS PERMIT **

  20. Issued Jan 12, 2026

    1404-38 N 15th St

    Solar Panels and Structure · FOR THE INSTALLATION OF RESIDENTIAL ROOF MOUNTED SOLAR PANELS AND RELATED APPURTENANCES AS NOTED ON THE APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK, INCLUDING ALL ELECTRICAL WORK. ** NO STATIONARY STORAGE BATTERY SYSTEMS WITH THIS PERMIT **

  21. Issued Jan 9, 2026

    1404-38 N 15th St

    Solar Panels and Structure · FOR THE INSTALLATION OF ROOF-MOUNTED SOLAR COLLECTORS IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  22. Issued Jan 9, 2026

    1404-38 N 15th St

    Solar Panels and Structure · FOR THE INSTALLATION OF RESIDENTIAL ROOF MOUNTED SOLAR PANELS AND RELATED APPURTENANCES AS NOTED ON THE APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK, INCLUDING ALL ELECTRICAL WORK. ** NO STATIONARY STORAGE BATTERY SYSTEMS WITH THIS PERMIT **

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.