Entity File · The Public Record
Company / LLC
Ols Office Partners L P
48 permits · 10 violations
- Records on file
- 58
Permits (as owner)
48 entries
- Issued Jul 7, 2026
Alterations · Furnish and install (3) plumbing fixtures, (2) kitchen sinks and (1) hot water heater, connecting to existing piping. *WITHOUT PIPING*
- Issued Jul 1, 2026
Addition and/or Alteration · Relocate lighting, add 10 receptacles, 3 new connect tracs, recircuit lighting controls and add three phase 100 amp panel as per 2017 NEC. Install Fire Alarm devices as per drawings and 2016 NFPA 72.
- Issued Jun 19, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE (SPACE 500). FOR USE AS A BUSINESS OCCUPANCY. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jun 5, 2026
Alterations · Install (1) hub drain for water dispenser, connecting to existing piping.
- Issued Jun 5, 2026
Alterations · Furnish and install (10) plumbing fixtures, (4) hot water heaters, (2) kitchen sinks, (2) lavatories, (1) water closet and (1) floor drain with piping. All work to be perform according to the 2018 PPC and per approved plans.
- Issued Jun 4, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (6) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 4, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (88) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 1, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 4 existing diffusers, with no wall penetrations, within a single tenant space, in compliance with EZ Permit standards
- Issued May 21, 2026
Addition and/or Alteration · Furnish and install electrical wiring for power and lighting as per APPROVED drawings-2017 NEC. **Fire alarm work will be applied for separately**
- Issued May 19, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued May 19, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE PARITAL DEMO, NEW PARTITIONS, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.
- Issued May 18, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 26TH FLOOR LEVEL FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Mar 30, 2026
Addition and/or Alteration · Furnish and install 52 duplex outlets, 26 quad outlets, 5 GFI's, 6 dedicated outlets, 1 L530P, 1 L520P, 4 wall furniture feeds, 4 floor cores, 1 hot water heater, 1 AC unit. 43 F-1, 5 F-2, 6 F-3A, 2 F-3B, 3 F-3C, 1 F-3D, 6 F-4A, 3 F-4B, 31 F-5, 28 F-6, 1 F-7, 11 F-8, 8 exit signs, 27 dimmers, 5 wall motions and 16 ceiling motions ,Fire Alarm .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Mar 30, 2026
Addition and/or Alteration · Furnish and install 5 duplex outlets, 1 quad, 6 floor cores and wall furniture feeds. One panel (LPLV13C). Installation shall comply with 2017 NEC.
- Issued Mar 24, 2026
Addition and/or Alteration · Provide and install electrical systems including three hundred ten (310) lighting fixtures, fourteen (14) exit signs, ninety (90) switches, one (1) lighting control panel, one hundred thirty-one (131) receptacle outlets, fifteen (15) floor receptacles, twenty-seven (27) furniture power connections, and six (6) equipment power connections. Furnish and install a fire alarm system including twenty-five (25) speaker/strobe notification appliances, six (6) speakers, six (6) strobes, one (1) relay, a
- Issued Mar 21, 2026
Alterations · Furnish and install (3) plumbing fixtures, (2) kitchen sinks and (1) hot water heater, with piping. Floor 4, not Floor 5. This application is for the 4th floor with a different building permit number. Thank you.
- Issued Mar 20, 2026
Alterations · ALTERATIONS TO EXISTING COMMERCIAL BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Mar 18, 2026
Alterations · Furnish and install (3) plumbing fixtures, (2) kitchen sinks and (1) hot water heater, with piping. ALL WORK PERFORMED PER 2018 PPC AND EZ PLUMBING STANDARD
- Issued Mar 17, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Mar 12, 2026
Addition and/or Alteration · Furnish and install 37 duplex outlets, 26 quads, 7 GFI's, 8 dedicated receptacles, 3 floor cores, 2 hot water heaters, 18 F-1, 40 F-2, 9 F-3, 14 F-4, 4 exit signs, 16 wall motions, 9 ceiling motions and two dimmers. Fire Alarm as per APPROVED drawings-2017 NEC,2016 NFPA-72.
- Issued Mar 10, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Mar 10, 2026
Addition and/or Alterations · FOR A MECHANICAL SYSTEM UPGRADE TO ACCOMMODATE A PORTION OF THE 5TH FLOOR OF AN EXISTING STRUCTURE.** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **
- Issued Mar 9, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 79 SPRINKLER HEADS
- Issued Mar 6, 2026
Addition and/or Alteration · Furnish and install eighty (80) Category 6 plenum cables from the IT Room to workstations.
- Issued Mar 3, 2026
Addition and/or Alteration · Perform electrical upgrades to the existing 5th floor office space, including installation and/or modification of electrical panels as required, new and revised branch circuit wiring, lighting fixtures, switches, receptacles, and associated devices to support the renovated layout. Provide any necessary feeders, circuit extensions, grounding, bonding, terminations, and updated panel directories. Furnish and install a fire alarm system for the 5th floor office space, including fire alarm control
- Issued Mar 2, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY AT FIFTH FLOOR OF EXISTING BUILDING. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Feb 27, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 77 HEADS
- Issued Feb 27, 2026
Addition and/or Alteration · Install telecommunications wiring for office space, including low-voltage cabling, raceways, back boxes, terminations, and supports as required. All work to be performed in accordance with the 2017 NEC.
- Issued Feb 25, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- Issued Feb 24, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (116) SPRINKLER HEADS ON THE 14TH FLOOR, PER NFPA 13
- Issued Feb 18, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNITS, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
- Issued Feb 6, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (21) SPRINKLER HEADS ON THE 5TH FLOOR AS PER NFPA 13
- Issued Feb 2, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING BUSINESS OCCUPANCY ON THE 5TH FLOOR IN AN EXISTING BUILDING, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jan 28, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jan 14, 2026
EZ Interior Non-Load-Bearing Wall Demo. · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Dec 17, 2025
Addition and/or Alteration · Furnish and install 12 F-3, 82 ft. F-4, 80 ft. F-6, and 4 exit signs, utilizing existing circuitry. (No review for the electrical installations, work area is less than 2,000 sq Ft) Fire alarm as per drawings. In accordance with NFPA72 2016& The Philadelphia Fire code 2018
- Issued Dec 3, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Nov 24, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 3 Heads
- Issued Nov 11, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. Furnish labor to relocate 3 existing diffusers with no wall penetrations within a single tenant space area.
- Issued Oct 29, 2025
Addition and/or Alteration · Furnish & Install (114) Category 6 plenum cables for voice/data
- Issued Oct 15, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING BUSINESS OCCUPANCY ON THE 26TH FLOOR OF AN EXISTING BUILDING, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Oct 14, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Sep 25, 2025
Addition and/or Alteration · Install fire alarm devices . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Aug 14, 2025
Alterations · FIXTURE REPLACEMENT WITHOUT PIPING OF LISTED FIXTURES. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC
- Issued Aug 13, 2025
Addition and/or Alteration · Furnish and install power and lighting per plans and 2017 NEC. FA Permit to be submitted at a later date when drawings are finalized.
- Issued Aug 6, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. *CP-2025-003866* RELOCATE (62) SPRINKLER HEADS AS PER NFPA 13 (4th Floor)
- Issued Jul 28, 2025
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING BUSINESS OCCUPANCY ON THE 4TH FLOOR LEVEL SUITE 400 OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE DEMOLITION OF EXISTING WALL PARTITION AND ERECTION OF NEW PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR A
Violations
10 entries
- Violation Dec 15, 2025OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Dec 15, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Aug 14, 2025OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Aug 14, 2025OPEN
EXIT SIGN ILLUMINATION
- Violation Aug 14, 2025OPEN
RELIABILITY
- Violation Aug 14, 2025OPEN
FIRE EXTINGUISHERS
- Violation Aug 14, 2025OPEN
FIRE EXTINGUISHER HANGERS & BRACKETS
- Violation Aug 14, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Aug 14, 2025OPEN
FIRE EXTINGUISHERS REQUIRED
- Violation Aug 14, 2025OPEN
PERIODIC TESTING
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.