Entity File · The Public Record
Company / LLC
Paragon Contractors, LLC
86 permits
- Records on file
- 86
Built (as contractor)
86 entries
- Issued Jun 23, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Jun 10, 2026
Addition and/or Alterations · VIRTUAL MEETING - If you have any questions and would like to schedule a virtual meeting please copy and paste the following link in your browser (https://kiosk.us2.qless.com/kiosk/app/home/7100000030) Select one of the following options: "Virtual Permit meeting"- or- "Virtual License Meeting". There are also options for in-person meetings available for appointment type. For more information or FAQs visit www.phila.gov/li or call 311 for assistance. Replace existing boiler only, in like and kin
- Issued Jun 5, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace boiler only, in like and kind, no new piping/ ductwork
- Issued Jun 4, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, no new piping/ ductwork
- Issued Jun 4, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, no new piping/ ductwork
- Issued Jun 4, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, no new ductwork
- Issued Jun 4, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing gas boiler only, in like and kind, no new piping/ ductwork
- Issued May 27, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing boiler only, in like and kind, existing piping /ductwork
- Issued May 13, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued May 13, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued May 13, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued May 11, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing furnace with a new, 90k btu gas fired furnace and tie back into the existing ductwork and venting.
- Issued May 11, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing gas boiler with a new, 60k btu gas boiler and tie back into the existing supply and return piping distribution and venting.
- Issued May 6, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing furnace only, in like and kind, using the existing ductwork. The modification/ addition of some trunk duct will be done in the basement only. It will all be exposed and tied back into the existing ducts going upstairs.
- Issued May 6, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing furnace only, with a new 54k btu furnace, using existing ductwork
- Issued Apr 27, 2026
Addition and/or Alterations · FOR THE REPLACEMENT OF THE EXISTING BOILER. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Apr 21, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Apr 21, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing gas furnace and A/C system with a new, 60k btu gas furnace and a/c coil and condenser. Modifications to the exposed basement ductwork only, reconnecting to the ducts going upstairs.
- Issued Apr 21, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace and AC only, in like and kind, using existing ductwork. No new ductwork.
- Issued Apr 20, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing piping/ ductwork
- Issued Apr 16, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing furnace only, in like and kind, no new ductwork
- Issued Apr 14, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing boiler only, in like and kind, no new piping/ ductwork
- Issued Apr 10, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace and condenser only, in like and kind, using existing ductwork. We are increasing one section of trunk and some of the supply ducts in the basement only, tying back into the the runs going upstairs. The new ductwork in the basem
- Issued Apr 6, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing gas furnace and central air with a new 60k btu gas furnace and central air and modify basement ductwork only, tying back into all ducts and existing registers going up stairs, all the ductwork will be
- Issued Apr 1, 2026
Addition and/or Alterations · Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing gas furnace with a new, 90k btu gas fired furnace and tie back into existing ductwork distribution. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK IS PART OF THIS PERMIT, APPLIANCE REPLACEMENT LIKE IN KIND ONLY
- Issued Apr 1, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing gas furnace with a new 54k btu gas fired furnace and tie back into existing ductwork distribution. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK IS P
- Issued Mar 20, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing ductwork
- Issued Mar 17, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing gas furnace and central air a/c with a new, 60k btu gas furnace and a/c and tie back into existing ductwork distribution. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblie
- Issued Mar 17, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing gas furnace with a new, 38k BTU gas-fired furnace and tie back into existing ductwork distribution NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK pro
- Issued Mar 17, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace and AC unit only, in like and kind, using existing ductwork.
- Issued Mar 17, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing gas furnace only, in like and kind, using existing ductwork
- Issued Mar 16, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing oil boiler with a new, 85k btu oil boiler and tie back into existing piping distribution . NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK proposed on
- Issued Mar 13, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace and AC only, in like and kind, using existing ductwork
- Issued Mar 10, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing gas furnace only, in like and kind, using existing ductwork
- Issued Mar 6, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Mar 3, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Mar 3, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing ductwork
- Issued Feb 26, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing gas boiler with a new, 79k btu gas fired boiler and tie back into existing distribution. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK proposed on du
- Issued Feb 25, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing electric furnace with a 3-ton heat pump system, using existing electric service. Replace existing basement ductwork only, in unfinished basement, using existing floor vents. ANY OTHER DUCTWORK WILL REQUIRE A VALID BUILDING PERMIT.
- Issued Feb 24, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing oil boiler with a new, 85k btu oil boiler and tie back into existing distribution . NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK proposed on ductwor
- Issued Feb 24, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing gas boiler with a new, 75k btu gas fired boiler and tie back into existing piping distribution. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK propose
- Issued Feb 20, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing gas boiler with a new, 100k btu gas fired boiler and tie back into existing distribution . NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK proposed on
- Issued Feb 19, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, no new ductwork
- Issued Feb 12, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing gas boiler with a new, 60k btu gas fired boiler and tie back into existing venting and piping.
- Issued Feb 12, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing ductwork
- Issued Feb 8, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing piping/ ductwork
- Issued Feb 8, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing ductwork
- Issued Feb 6, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing ductwork
- Issued Feb 5, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Feb 5, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Feb 3, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ductwork
- Issued Feb 3, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, no new piping/duckwork
- Issued Jan 29, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Jan 29, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Jan 26, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing ductwork.
- Issued Jan 26, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Jan 26, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing gas furnace only, in like and kind, using existing ductwork
- Issued Jan 21, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. replace existing gas fired furnace with a new, 90k btu gas fired furnace and tie back into existing ductwork
- Issued Jan 21, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing hydronic pipe
- Issued Jan 21, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing hydronic pipe
- Issued Jan 21, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing hydronic pipe
- Issued Jan 15, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Jan 12, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Jan 9, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing oil fired furnace with a new, 80k btu oil fired furnace and tie back into existing ductwork and venting - like and kind replacement of oil furnace.
- Issued Jan 8, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans. replace existing gas fired furnace with a new 54k btu gas fired furnace and tie back into existing ductwork distribution and venting
- Issued Jan 2, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- (Appliance replaced to existing duct work) For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
- Issued Dec 31, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing gas fired boiler with a new, 79k btu gas fired boiler and tie back into existing piping distribution. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK p
- Issued Dec 30, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing gas fired boiler with a new, 60k btu, gas fired boiler and tie back into existing venting and piping distribution - like and kind replacement of gas boiler. NO OTHER WORK PERMITTED ON THIS PERMIT. No p
- Issued Dec 30, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing 95% gas furnace with a new, 95% gas furnace, 54k btu input, and tie back into existing ductwork and vent piping. like and kind replacement of condensing gas furnace. NO OTHER WORK PERMITTED ON THIS PE
- Issued Dec 30, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing gas fired furnace with a new, 70k btu gas fired furnace and tie back into existing ductwork distribution and venting. like and kind replacement of gas furnace. NO OTHER WORK PERMITTED ON THIS PERMIT. N
- Issued Dec 30, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing boiler with a new, 95k btu gas fired boiler and tie back into existing distribution . NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK proposed on ductw
- Issued Dec 15, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing ductwork/ piping
- Issued Dec 15, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing gas fired boiler with a new, 60k btu gas fired boiler and tie back into existing venting and piping distribution - like and kind replacement of gas boiler
- Issued Dec 15, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing gas furnace with a new, 80% 54k btu gas fired furnace and tie back into existing ductwork and venting - like and kind replacement of gas furnace
- Issued Dec 9, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Dec 9, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Dec 4, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace and AC only, in like and kind, using existing ductwork.
- Issued Dec 2, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing ductwork.
- Issued Nov 18, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like & kind, using existing ductwork.
- Issued Nov 17, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like & kind, using existing venting and piping.
- Issued Nov 17, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like & kind, using existing venting and piping.
- Issued Nov 17, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like & kind, add in return drop, boot, and grill. No ductwork. ANY NEW DUCTWORK WILL REQUIRE A VALID BUILDING PERMIT
- Issued Nov 14, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, no new piping/ductwork.
- Issued Nov 14, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, no new piping/ductwork.
- Issued Nov 14, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind. In the unfinished basement only - replace approximately 10' of trunk line and 20' of take offs with 7" round duct, and a new return grill. No drywall will need to be removed/replaced to replace this ductwo
- Issued Nov 13, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing gas furnace and AC only, in like & kind, using existing ductwork.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.