Entity File · The Public Record
Contractor
Paramount Electrical
21 permits
- Records on file
- 21
Built (as contractor)
21 entries
- Issued Jun 30, 2026
Addition and/or Alteration · Provide new 250A electrical service, lighting, receptacles, HVAC power and fire alarm all work per approved plans. NEC 2017 NFPA2016
- Issued Jun 3, 2026
New Construction · Provide and install 36 poles and overhead conductors for medium voltage electrical service. All work to be done according to the 2017 NEC and per approved plans.
- Issued Apr 1, 2026
Addition and/or Alteration · Relocate existing circuits for minor bar renovation
- Issued Mar 25, 2026
New Construction · Electrical Permit for combo CP-2025-006209
- Issued Mar 13, 2026
Addition and/or Alteration · Selective electrical demolition and temporary lighting and power from an existing source. Supply and install new panelboards, new lighting, new receptacle outlets and new feeders for new HVAC equipment as per 2017 NEC. Supply and install new fire alarm control panel, annunciator and devices as per 2016 NFPA 72.
- Issued Feb 13, 2026
Addition and/or Alteration · Remove and replace (2) 6KW ceiling mounted heaters. Remove and replace (2) ceiling mounted fans. Provide (2) 60A 208V receptacles for temporary power.
- Issued Feb 13, 2026
Addition and/or Alteration · Supply and install (1) 70A circuit breaker, (1) 45 KVA transformer, (1) 100A panelboard, and (25) receptacle outlets for office fit out as per 2017 NEC. All lighting is existing.
- Issued Feb 11, 2026
Addition and/or Alteration · Selective electrical demolition and temporary power and light from existing source. Provide a new 600 amp 120/208V service, new 600 amp automatic transfer switch, new 250 KW generator, new 150 amp panelboard, new 100 amp panelboard. Provide new lighting, new receptacle outlets and power for HVAC equipment. Provide new fire alarm control panel, annunciator, NAC panel and devices. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jan 30, 2026
Addition and/or Alteration · “Provide a new circuit (2#12 + 1#12GND - 3/4"C and 20/1 lockable circuit breaker) and final connection to the new statically illuminated sign board. Relocate existing conduit/wiring for the CCTV camera as required for installation of the new statically illuminated sign board. Perform Load monitoring at existing electrical equipment to confirm adequate capacity for the new load.” per GP-2025-011250
- Issued Jan 23, 2026
Addition and/or Alteration · Upgrade fire alarm devices for elevator modernization as per 2016 NFPA 72 and per approved plans.
- Issued Dec 9, 2025
New Construction · Install utility supplied pad mount transformer and service conductors, supply and install 2000 amp switchboard, Supply and install feeders to new panelboards, transformers and HVAC equipment. Supply and install branch circuit wiring for new interior and exterior lighting and receptacle outlets , fire pump .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. AMENDMENT: Install fire alarm PER APPROVED DRAWINGS.
- Issued Dec 8, 2025
Addition and/or Alteration · Install cabling and equipment for access control and cctv systems
- Issued Nov 5, 2025
Addition and/or Alteration · INSTALL FIRE ALARM SYSTEM TO OFFICE AREA. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Oct 28, 2025
Addition and/or Alteration · Remove existing lighting for reuse, add new receptacle outlets and power supplies for existing lighting. REPLACEMENT ONLY. NO WIRING
- Issued Oct 9, 2025
Addition and/or Alteration · Install panels, conduit, wiring, lighting fixtures, receptacles, switches, and connections to mechanical equipment, and egress lighting . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **NO FIRE ALARM ON THIS PERMIT**
- Issued Sep 30, 2025
Addition and/or Alteration · Add receptacle outlets using existing circuits, add new branch circuits for new equipment . PER APPROVED DRAWINGS-2017 NEC.
- Issued Sep 30, 2025
New Construction · Provide wiring and terminations for low voltage HVAC controls -2017 nec.
- Issued Sep 16, 2025
Addition and/or Alteration · Providing low voltage power to in-line fans, motorized valves, and sensors . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Sep 15, 2025
Addition and/or Alteration · Provide wiring and terminations for low voltage controls of overhead door .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Sep 8, 2025
Addition and/or Alteration · Provide new switchgear, new feeders for HVAC equipment and new lighting and controls as per 2017 NEC. Provide and install new fire alarm equipment for HVAC shut down as per 2016 NFPA 72.
- Issued Aug 29, 2025
Addition and/or Alteration · Upgrade existing Fire Alarm and CCTV systems .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.