23 permits · 2 violations
- Records on file
- 25
Permits (as owner)
23 entries
- Issued Jun 25, 2026
Alterations · New fixtures w piping, 1 WC 1 LAV- 3 KS ALL WORK PERFORMED PER 2018 PPC AND EZ STANDARD
- Issued Apr 22, 2026
Temporary Tents and Canopies · ASSEMBLY USE TENT - LAWFUL OCCUPANCY SHALL BE AS POSTED - REMOVAL DATE ELECTRICAL PERMIT REQUIRED, UNLESS POWER IS PROVIDED THROUGH EXISTING EXTERIOR GROUND FAULT PROTECTED RECEPTACLES AND POWER CORDS ARE RATED EXTRA HEAVY DUTY WITH U. L. LABEL STATING SUCH RATING. NO COOKING OR HEATING PERMITTED WITH THIS APPROVAL. Streets Department permit is required for street closure prior to the start work if applicable.
- Issued Apr 15, 2026
Addition and/or Alteration · Renovation to existing PET CT room. New Lighting, Receptacles, and New Circuiting to new Medical Equipment as per 2017 NEC. Install new fire alarm devices as per 2016 NFPA 72.
- Issued Apr 13, 2026
Addition and/or Alteration · Install new Fire alarm panel, speakers and strobes .PER APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Apr 8, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Apr 7, 2026
Addition and/or Alteration · Replace existing lighting with new energy efficient LED lighting. Replace existing lighting control with new. Connect new HVAC equipment to existing circuits
- Issued Apr 6, 2026
Addition and/or Alterations · FOR THE REPLACEMENT OF TWO (2) GRDs AND ONE (1) TOILET ROOM EXHAUST FAN AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2026-001399 FOR ASSOCIATED BUILDING PERMIT.
- Issued Mar 30, 2026
Addition and/or Alterations · FOR ALTERATIONS TO AN EXISTING HVAC SYSTEM TO INSTALL NEW GRDs AND ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND PHC AND PA DOH APPROVALS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-006270 FOR ASSOCIATED BUILDING PERMIT.
- Issued Mar 26, 2026
Alterations · Add new sink and WC for toilet room. *WITHOUT PIPING*
- Issued Mar 24, 2026
Addition and/or Alterations · FOR ALTERATIONS TO AN EXISTING AUTOMATIC SPRINKLER SYSTEM OF THE EXISTING BUILDING TO INCLUDE REPLACEMENT OF FIRE SERVICE LINE AND BACKFLOW PREVENTER. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13 BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. NO CHANGE TO EXISTING FIRE MAIN, PUMP AND BACKFLOW ASSEMBLY. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK.
- Issued Mar 23, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, DOORS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK.
- Issued Mar 13, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (4) sprinklers in reading room
- Issued Mar 13, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (19) sprinklers in CT/PET area
- Issued Feb 26, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS ON THE SECOND FLOOR OF AN EXISTING HOSPITAL BUILDING PER APPROVED PLANS. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. AMENDMENT APPROVED AS OF 07/01/2026: TO REVISE THE STATEMENT OF SPECIAL INSPECTIONS SCHEDULE FORM TO INCLUDE INSPECTION TYPES "FIR
- Issued Feb 19, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (42) sprinkler to accommodate alterations to reading room
- Issued Dec 19, 2025
EZ Roof Covering Replacement · EZ PERMIT RE-ROOFING- For the Installation of New Roof Coverings on Existing Roofs as per attached standard. Deviations from these standards require submission of construction and site plans. Replacement of sheathing in excess of 10% of roof area shall not be applicable to the EZ permit process.
- Issued Dec 16, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE OF OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Dec 5, 2025
Addition and/or Alteration · Furnish & install new lighting, electrical feeders & circuits associated with the new Varian unit as per 2017 NEC. Install new fire alarm devices associated with new Varian unit as per 2016 NFPA 72.
- Issued Dec 3, 2025
Alterations · INSTALL 3 SINKS, 1 MOP SINK, 1 EYEWASH SINK AND 1 FLOOR DRAIN. ALL WORK TO BE DONE ACCORDING TO THE 2018 PPC
- Issued Dec 3, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF NEW HVAC APPLIANCES, GRDs, AND ASSOCIATED DUCTWORK AND PIPING AND FOR THE RELOCATION OF ONE (1) EXISTING APPLIANCE (VAV). ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND PHC AND PA DOH APPROVALS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-004864 FOR ASSOCIATED BUILDING PERMIT.
- Issued Nov 17, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (15) existing sprinkler heads to accommodate interior alterations
- Issued Nov 10, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EXISTING HOSPITAL . ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS AND DOH APPROVAL.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.** ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF WORK**
- Issued Aug 21, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (11) sprinklers in Bi-plane room
Violations
2 entries
- Violation Jul 8, 2026OPEN
FACADES
- Violation Jul 8, 2026OPEN
FACADES
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.