Contractor
Peter Shkolnik
26 permits
- Records on file
- 26
Built (as contractor)
26 entries
- Issued May 22, 2026
New Construction · Install 100 AMP Electrical Service with Main circuit breaker panel and proper grounding and bonding. Wire house throughout. Install lighting, switches, receptacles. Install dedicated branch circuit for the A/C unit. Install 120 volt interconnected smoke/CO alarms. All work to be done according to 2017 NEC.
- Issued May 22, 2026
New Construction · Install 100 AMP Electrical Service with Main circuit breaker panel and proper grounding and bonding. Wire house throughout. Install lighting, switches, receptacle outlets. Install dedicated branch circuit for the A/C unit. Install 120 volt interconnected smoke/co alarms. All work to be done according to the 2017 NEC.
- Issued May 16, 2026
Addition and/or Alteration · Install 8 recessed lights in soffit.. Install 10 recessed lights in ceiling. All work to be performed according to 2017 NEC.
- Issued Apr 28, 2026
Addition and/or Alteration · Install 200 AMP Service with Main circuit breaker panel and proper grounding and bonding. Rewire house throughout. Install 36 receptacles, 12 switches, 36 fixtures. Install 6 hard wired smoke detectors. Provide dedicated line for the A/C with disconnect outdoor. All work to be done according to the 2017 NEC. Labor, Materials, Overhead and Profit are included in this contract.
- Issued Apr 23, 2026
Addition and/or Alteration · Replace existing 100 AMP Service feeder due to OXIDATION. Install new line for outdoor A/C unit 30 AMP 240 volt. All work to be performed according to 2017 NEC. MP-2026-001882
- Issued Apr 13, 2026
Addition and/or Alteration · Install 4 receptacles, 4 switches, 1 ceiling fan. Install 10 recessed lights. All work to be performed according to 2017 NEC.
- Issued Apr 6, 2026
Addition and/or Alteration · Install new feeder 60 AMP 240 volt for the swimming pool panel. Provide contour Grounding for the pool. Install lines for the pool pump (20 AMP 240 volt) and Heat pump (40 AMP 240 volt). All work to be performed according to 2017 NEC
- Issued Jan 30, 2026
Addition and/or Alteration · Install 16 switches, 29 fixtures, 34 receptacles. Provide dedicated lines to each room for window A/C units. Install 7 hardwired smoke detectors All work to be done according to the 2017 NEC.
- Issued Jan 28, 2026
Addition and/or Alteration · Install 100 AMP Electrical Service with Main circuit breaker panel and proper Grounding and Bonding. Rewire house throughout. Install lighting, switches and receptacle outlets. Install dedicated branch circuit for the A/C unit. Install 120 volt interconnected Smoke / CO alarms. All work to be done according to the 2017 NEC.
- Issued Dec 6, 2025
Addition and/or Alteration · Install 200 Amp Service with Main circuit breaker panel and proper Grounding and Bonding. Rewire house throughout. Install 50 receptacles, 32 switches, 46 fixtures. Install 8 hardwired smoke detectors. Provide dedicated line for the A/C with disconnect outdoor.
- Issued Dec 6, 2025
Addition and/or Alteration · Install 100 AMP Electrical Service With Main circuit breaker panel and proper grounding and bonding. Rewire house throughout. Install lighting, switches and receptacle outlets. Install 120 volt interconnected smoke/CO alarms. Install dedicated branch circuit for the A/C unit. All work to be done according to the 2017 NEC
- Issued Dec 6, 2025
Addition and/or Alteration · Install 200 AMP Electrical Service with 2 Main circuit breaker panels and proper grounding and bonding. Rewire house throughout. Install 38 receptacles, 22 switches, 28 fixtures. Install 8 hardwired smoke detectors. Provide 2 lines for the A/C with disconnects outdoor. All work to be done according to 2017 NEC.
- Issued Nov 6, 2025
Addition and/or Alteration · Install 100 AMPS Electrical Service with Main circuit breaker panel and proper Grounding and Bonding. Rewire house throughout. Install lighting, switches and receptacle outlets. Install 120 v interconnected smoke/ CO alarms. Install dedicated branch circuit for the A/C unit. All work to be done according to the 2017 NEC.
- Issued Nov 5, 2025
Addition and/or Alteration · Install 100 Amp Electrical Service with Main circuit breaker panel and proper Grounding and Bonding. Rewire house throughout. Install lighting, switches and receptacle outlets. Install 120 volt interconnected smoke/CO alarms. Install dedicated branch circuit to the A/C unit. All work to be done according to the 2017 NEC.
- Issued Oct 21, 2025
Addition and/or Alteration · INSTALL 100 AMP ELECTRICAL SERVICE WITH MAIN CIRCUIT BREAKER PANEL AND PROPER GROUNDING AND BONDING. REWIRE HOUSE THROUGHOUT. INSTALL LIGHTING, SWITCHES AND RECEPTACLES OUTLETS. INSTALL DEDICATED BRANCH CIRCUIT FOR THE AC UNIT. INSTALL 120 VOLTS INTERCONNECTED SMOKE/CO ALARMS. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.
- Issued Oct 14, 2025
Addition and/or Alteration · Install 100 AMP Service to the property. Install 30 receptacles, 19 switches, 32 fixtures. Install 6 hardwired smoke detectors. Provide line for the A/C with disconnect outdoor.
- Issued Oct 6, 2025
New Construction · INSTALL 200 AMP ELECTRICAL SERVICE, METER SOCKET AND MAIN CIRCUIT BREAKER PANEL WITH PROPER GROUNDING AND BONDING. REWIRE HOUSE THROUGHOUT AND INSTALL LIGHTING, SWITCHES AND RECEPTACLE OUTLETS. INSTALL DEDICATE BRANCH CIRCUIT FOR AC UNIT WITH DISCONNECT. INSTALL 120 VOLTS INTERCONNECTED SMOKE AND CO ALARMS. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.
- Issued Sep 24, 2025
Addition and/or Alteration · Install 200 AMP Service to the property. Install 38 receptacles,19 switches,33 fixtures. Install 7 hardwired smoke detectors. Provide line for the A/C with disconnect outdoor.
- Issued Sep 24, 2025
Addition and/or Alteration · Install new 100 AMP Service panel. Install 6 light fixtures, 3 switches, 6 GFCI receptacles. Install new lines for Dishwasher, Garbage Disposal and Refrigerator.
- Issued Sep 24, 2025
Addition and/or Alteration · Install 100 AMP Service to the property. Install 29 receptacles, 18 switches, 32 fixtures. Install 6 hardwired smoke detectors. Provide line for the A/C with disconnect outdoor.
- Issued Sep 15, 2025
Addition and/or Alteration · Install new dedicated line 15 AMP 120 volts for the rolling gate. Parent Building permit GM-2024-008177
- Issued Sep 10, 2025
Addition and/or Alteration · Install 200 AMP Service to the property. Install 45 receptacles, 47 fixtures, 22 switches. Install 7 hardwired smoke detectors. Provide line for A/C with disconnect outdoor.
- Issued Aug 27, 2025
Addition and/or Alteration · Install 200 AMP Service for the DUPLEX with two 100 AMP panels. Install 38 receptacles, 22 switches, 28 fixtures. Install 8 hardwired smoke detectors. Provide 2 lines for the A/c with disconnects outdoor.
- Issued Aug 13, 2025
Addition and/or Alteration · Eliminate existing wiring for the gate. Install new power line 120 v, 20 AMP for the electric gate.
- Issued Aug 12, 2025
Addition and/or Alteration · Connect 350 KVA generator to the rides, lights, food stands. This is TEMPORARY wiring for the CARNIVAL. AUGUST 21 - AUGUST 30, 2025
- Issued Jul 31, 2025
Addition and/or Alteration · Install 200 AMP Service to the property ( 2 electrical panels 100 AMP each ). Install 25 switches, 40 fixtures, 80 receptacles. Install 10 hardwired smoke detectors. Provide 2 lines for A/C with disconnects outdoor.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.