Permits (as owner)
36 entries
- Issued Jul 7, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (9) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 9, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jun 9, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Jun 8, 2026
Addition and/or Alteration · Furnish and install 43 duplex outlets, 9 quad outlets, 4 GFI's, 6 TV outlets, 2 projector outlets, 9 floor cores, 3 wall furniture feeds, 1 hot water heater, 7 fan power boxes, 70' L-1, 22 L-2, 32 L-3, 6 L-4, 4 L-5, 3 L-6, 45 L-7, 3 L-8, 3 L-9, 14 L-10, 6 L-11, 1 L-12, 8 exits, 2 dimmers, 8 wall occupancy sensors, 15 ceiling sensors ,Fire Alarm ALL NWORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jun 5, 2026
Alterations · Install (2) plumbing fixtures, (1) kitchen sink and (1) hot water heater, connecting to existing piping.
- Issued May 29, 2026
Addition and/or Alteration · Relocate 18 light fixture, 6 switch. Install 3 light fixture, 3 switch, 9 receptacle, 9 CAT-6 cables.
- Issued May 28, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (65) SPRINKLER HEADS, PER NFPA 13
- Issued May 21, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 21, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO THE VACANT THIRD FLOOR TO ACCOMODATE EXPANSION OF BUILDING AMENITIES/ OFFICE SPACE PER APPROVED PLANS. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 11, 2026
EZ Interior Non-Load-Bearing Wall Demo. · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Mar 2, 2026
Addition and/or Alteration · Installation of New lighting and lighting sensors. Installation of new speakers. Replacement of strobes 1 for one. changing color from red to white. Temporary power and lighting NEC 2017
- Issued Feb 6, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 14 exhaust grilles only, then provide air balance report.
- Issued Jan 13, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 97 sprinkler heads
- Issued Jan 12, 2026
Addition and/or Alteration · Furnish and install 6 F1, 215 F2, 3 F3, 19 F4, 27 F5, 2 F6, 2 F7 light fixtures 1 for 1 swap using existing circuitry. Replace 73 ceiling occupancy sensors in kind as per 2017 NEC.
- Issued Dec 29, 2025
Alterations · • Provide labor and material to disconnect [8] water closets, [7] lavatories, [3] urinals on the 6th Floor Core Restroom • Provide labor and material to disconnect [6] water closets, [5] lavatories, [2] urinals on 56th Floor Core Restroom
- Issued Dec 22, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Dec 18, 2025
Addition and/or Alteration · Furnish and install wiring for one hot water heater, one VAV, 4 FPV, five duplex receptacles, 4 quads, 2 dedicated receptacles, 20 light fixtures, lighting controls, relocate 30 existing light fixtures and fire alarm as per drawings In accordance with the NFPA72 2016 & The Philadelphia fire code 2018
- Issued Dec 17, 2025
1 units
Addition and/or Alteration · FOR INTERIOR DEMOLITION AND RESTROOM ALTERATIONS (WITH NO CHANAGE OF OCCUPANCY) PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Dec 10, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 18 Heads
- Issued Dec 10, 2025
Addition and/or Alteration · Rework Chillers #1, 2 & 4 with Conduit and Wire - Rework Pumps 8, 9 & 10 with Conduit and Wire - Control Conduit and Wiring for the Same Units - Disconnect and Reconnect EF-4 .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **MP-2025-005087**
- Issued Dec 2, 2025
Alterations · Furnish and install (2) plumbing fixtures, (1) kitchen sink and (1) hot water heater, with piping. ALL WORK PER 2018 PPC AND EZ STANDARD
- Issued Nov 25, 2025
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING STRUCTURE. FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE SELECTIVE DEMOLITION OF EXISTING PARTITION AND THE ERECTION OF NEW PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Oct 28, 2025
Alterations · Remove and replace (32) plumbing fixtures, (12) lavatories, (14) water closets and (6) urinals connecting to existing piping. *WITHOUT PIPING*
- Issued Oct 22, 2025
1 units
Addition and/or Alteration · FOR LEVEL I ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS A BUSINESS OCCUPANCY, ALTERATIONS TO INCLUDE PROVIDING FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ** NO CERTIFICATE OF OCCUPANCY REQUIRED FOR THIS WORK. ALTERATIONS SHALL BE DONE IN A MANNER THAT DOES NOT IMPACT THE EGRESS OR THE LEVEL OF FIRE
- Issued Oct 17, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Oct 15, 2025
Addition and/or Alteration · Relocate 20 light fixtures. Install 24 light fixtures, 2 exit, 3 switches, 8 receptacles, and provide power to 1 shade as per 2017 NEC. Fire Alarm: Install 1 speaker/strobe and relocate 1 speaker/strobe as per 2016 NFPA 72.
- Issued Oct 2, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Sep 25, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (14) SPRINKLER HEADS ON THE 28TH FLOOR, PER NFPA 13
- Issued Sep 19, 2025
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS ( NO CHANGE IN OCCUPANCY) TO A PORTION OF THE 28TH FLOOR OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE DEMOLITION OF EXISTING PARTITIONS AND THE ERECTION OF NEW PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Sep 19, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS TO THE 31ST FLOOR OF AN EXISTING STRUCTURE PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
- Issued Sep 8, 2025
Addition and/or Alteration · Install power, tele/data, lighting, and lighting controls as per attached drawings and 2017 NEC.
- Issued Aug 19, 2025
Addition and/or Alteration · Reconfigure existing fire alarm as per the attached drawings and 2016 NFPA 72. This is only for the fire alarm portion of work.
- Issued Aug 12, 2025
Rough-In · Rough-In Permit for EP-2025-007807 Reconfigure existing fire alarm as per the attached drawings.
- Issued Aug 7, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF NEW SPRINKLER HEADS AND THE RELOCATION OF SPRINKLER HEADS IN ACCORDANCE WITH NFPA 13 THROUGHOUT THE 31ST FLOOR LEVEL WITH EXISTING 6" BACKFLOW PREVENTION ASSEMBLY. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Aug 1, 2025
Rough-In · Rough-In Permit for EP-2025-007342 Power, teledata, lighting and lighting controls as per attached drawings. Contract value $740,635.00= $701,635 for electrical and teledata portion of work and $39,000 for fire alarm portion of work. FA will be applied for at a later date.
- Issued Jul 16, 2025
Alterations · • Furnish and install [2] Pantry Sinks, [1] Electric Water Heater, [1] Floor Drain and [1] Hub Drain • Provide labor and materials to extend from existing sanitary, vent and domestic water.
Violations
9 entries
- Violation Jun 2, 2026OPEN
HALON SYSTEMS
- Violation Jun 2, 2026OPEN
HIGH-RISE BUILDING
- Violation Jun 2, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Jun 2, 2026OPEN
EXIT SIGN ILLUMINATION
- Violation Jun 2, 2026OPEN
RECORDS
- Violation Jun 2, 2026OPEN
DAMPER CERTIFICATION REPORT
- Violation Jun 2, 2026OPEN
UTILITY IDENTIFICATION
- Violation Jun 2, 2026OPEN
SMOKE CONTROL SYSTEM RECORDS
- Violation Jun 2, 2026OPEN
FIRE EXTINGUISHERS
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.