Entity File · The Public Record
Owner of record
Philadelphia Hotel Associ
7 permits
- Records on file
- 7
Permits (as owner)
7 entries
- Issued May 4, 2026
Sign · FOR THE REMOVAL AND REPLACEMENT OF THREE (3) STATICALLY ILLUMINATED WALL SIGNS, ONE (1) NON-ILLUMINATED WALL SIGN, AND FOR THE REFACING OF ONE (1) 2-FACED FREESTANDING SIGN.
- Issued Mar 11, 2026
Signs (Accessory / Non-Accessory) · FOR THE REMOVAL AND REPLACEMENT OF THREE (3) STATICALLY ILLUMINATED WALL SIGNS, ONE (1) NON-ILLUMINATED WALL SIGN, AND FOR THE REFACING OF ONE (1) 2-FACED FREESTANDING SIGN. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS
- Issued Feb 4, 2026
Alterations · Commercial plumbing work associated with alterations to an existing hotel, including: REPLACE TOTAL OF 987 FIXTURES • Replacement of existing shower and tub valves • Installation of new P-traps at tubs as required to reconnect to existing drainage • Pull and reset of existing toilets • Pull and reset of existing lavatory faucets All work is limited to fixture and valve replacement and reconnection to existing plumbing systems. No new plumbing layouts or system reconfiguration is included.
- Issued Jan 9, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2025-006338
- Issued Jan 5, 2026
331 units
Addition and/or Alteration · LEVEL I ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING HOTEL BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued Dec 17, 2025
EZ Interior Non-Load-Bearing Wall Demo. · EZ INTERIOR NON-LOAD-BEARING WALL DEMOLITION - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans. Structural alteration or repair is expressly PROHIBITED under this permit. Prohibited structural work includes but not limited to any modification to exterior walls, party wall, floor/roof framing and foundations, including underpinning, excavation and removal of fou
- Issued Nov 2, 2025
Addition and/or Alteration · Installing a 200 amp panel from existing disconnect to power 4 new EV chargers on 2 pedestals ,fed from existing 3000A MDP . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC .
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.