Entity File · The Public Record
Owner of record
Philadelphia Housing Authority
1 property · $2.31M acquired · 42 permits · 9 violations
- Records on file
- 52
- Acquired
- $2.31M
Acquired
1 entry
Permits (as owner)
37 entries
- Issued Jun 23, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. **WORK INCLUDES NEW COOLING TOWER, BOILERS, AND HYDRONIC PIPING**
- Issued May 13, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.
- Issued May 13, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.
- Issued May 13, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.
- Issued May 13, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.
- Issued May 12, 2026
Excavation · Site / Utility Permit for RP-2025-010078 and RP-2025-010075
- Issued May 12, 2026
New Construction or Additions · Plumbing Permit for combo SP-2025-001273
- Issued May 12, 2026
Excavation · Site / Utility Permit for RP-2025-010083 AND RP-2025-010084
- Issued May 8, 2026
Sitework with Onsite Utility Services · FOR GENERAL SITEWORK AND ONSITE UTILITY SERVICES WITH AN 8 IN SANITARY PIPE, CURB TRAP FRESH AIR INLET, 3 18 IN STORM CONNECTIONS, ONE 24 IN STORM CONNECTION, 9 INLETS, 4 U G BASIN, 30 YARD DRAINS, 42 ROOF DRAINS, 4 OUTLET CONTROL STRUCTURES, 4 IN DOMESTIC WATER, THIS IS FOR 5 BUILDING BRANCH OFF, 4 IN SANT, 2 IN WATER INTO EACH BUILDING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR AL
- Issued May 5, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.
- Issued May 5, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.
- Issued May 5, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.
- Issued Mar 25, 2026
New Construction · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Mar 13, 2026
336 units
Addition and/or Alteration · FOR LEVEL III ALTERATIONS TO AN EXISTING RESIDENTIAL HIGH-RISE APARTMENT BUILDING WITH 336 DWELLING UNITS (R-2 OCCUPANCY). ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **ASBESTOS REMEDIATION REQUIRED**
- Issued Mar 13, 2026
Change of Use · Residential - Household Living - Multi-Family
- Issued Mar 5, 2026
New Construction · FOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO REGISTERS, DIFFUSERS ON THIS PERMIT.
- Issued Feb 25, 2026
New Construction or Additions · NEW CONSTRUCTION OF 3 STORY 15 UNIT RESIDENTIAL MODULAR BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY LISTED FIXTURES. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Feb 25, 2026
New Construction or Additions · NEW CONSTRUCTION OF 3 STORY 13 RESIDENTIAL DWELLING MODULAR BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Feb 25, 2026
New Construction or Additions · NEW CONSTRUCTION OF 3 STORY 14 RESIDENTIAL DWELLING MODULAR BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Feb 25, 2026
New Construction or Additions · NEW CONSTRUCTION OF 3 STORY 17 DWELLING RESIDENTIAL MODULAR BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Feb 25, 2026
New Construction or Additions · NEW CONSTRUCTION OF 2 SOTRY MODULAR BUILDING WITH USE OF A COMMUNITY CENTER AND 5 RESIDENTIAL DWELLING UNITS. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Jan 28, 2026
New Construction · Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures, receptacles, site lighting fixtures and temporary light and power. Make final electrical connections at each modular unit. Provide new lights, devices, lighting control, power to HVAC equipment, tele-data wiring, new electrical house panels, access control, CCTV and intercom systems within community center. Within modular units, install new telecom wiring and jacks
- Issued Jan 28, 2026
New Construction · Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures, receptacles and site lighting fixtures. Make final electrical connections at each modular unit. Provide site temporary lighting and power. Within modular units, install new telecom wiring and jacks. Make final connections at HVAC equipment. Provide new fire alarm work within building sprinkler room as shown on shop drawings. All other work within modular units is
- Issued Jan 28, 2026
New Construction · Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures, receptacles, (3) EV Chargers and site lighting fixtures. Make final electrical connections at each modular unit. Provide site temporary lighting and power. Within modular units, install new telecom wiring and jacks. Make final connections at HVAC equipment as per 2017 NEC. Provide new fire alarm work within building sprinkler room as shown on shop drawings and 20
- Issued Jan 21, 2026
New Construction or Additions · CURB TRAPS, FAI'S, MAIN DRAINS, AND 2" WATER DISTRIBUTION
- Issued Dec 24, 2025
New Construction or Additions · Rough in Main house drain 5 in curb trap fresh air inlet and 2 in water service to the building
- Issued Dec 23, 2025
New Construction or Additions · rough in main house drain 5 in curb trap fresh air to the building
- Issued Dec 17, 2025
New Construction · Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures and site lighting fixtures. Make final electrical connections at each modular unit. Provide site temporary lighting and power. Within modular units, install new telecom wiring and jacks. Make final connections at HVAC equipment. Provide new fire alarm work within building sprinkler room as shown on shop drawings. All other work within modular units is by the modul
- Issued Dec 16, 2025
New Construction or Additions · INSTALL CT, FAI, MD & 2" WDP CURB IN.
- Issued Dec 11, 2025
New Construction or Additions · INSTALL CT, FAI, MD & 2" WDP CURB IN.
- Issued Oct 29, 2025
New construction, addition, GFA change · For the complete demolition of all structures on the lot and for the erection of a semi-detached structure. Size and location as shown on plans. See MI-2025-003929 for ZBA variance.
- Issued Oct 29, 2025
New construction, addition, GFA change · FOR THE ERECTION OF A DETACHED BUILDING. SIZE AND LOCATION AS SHOWN ON PLANS.
- Issued Oct 15, 2025
New Construction · Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures, receptacles and site lighting fixtures. Make final electrical connections at each modular unit. Provide site temporary lighting and power. Within modular units, install new telecom wiring and jacks. Make final connections at HVAC equipment. Provide new fire alarm work within building sprinkler room as shown on shop drawings. All other work within modular units is
- Issued Jul 17, 2025
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Jul 17, 2025
City Demolition · Sub Demolition Permit for 665713. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: Replace front sidewalk. (1) stucco c/w 2234 N. 17th St. Erosion control mat with topsoil and seed. 4' corral fence across front of both properties.
- Issued Jul 17, 2025
Tank Install/Removal · FOR THE REMOVAL OF ONE (1) 1,000 GALLON UNDERGROUND HEATING OIL STORAGE TANK. REMOVE ANY HEATING OIL PRODUCT/WATER FROM TANK, CLEAN TANK, CONDUCT A CONFIRMATORY SOIL SAMPLING OF SURROUNDING SOIL. CONTINGENCY PLAN IN PLACE IN THE CASE CONTAMINATED SOILS DISCOVERED AND BACKFILL. ALL WORK COMPLETED IN ACCORDANCE WITH PADEP UST REMOVAL GUIDELINES. PROVIDE THE CITY OF PHILADELPHIA WITH A TANK CLOSURE REPORT.
Built (as contractor)
5 entries
- Issued Apr 23, 2026
Make Safe Permit For RP · MAKE SAFE PERMIT TO COMPLY WITH UNSAFE VIOLATION CF-2024-011365 TO INCLUDE REPAIRS TO FRONT EXTERIOR MASONRY WALL PER APPROVED PLANS AND IN ACCORDANCE WITH CODE BULLETIN PM-1801. LICENSED PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION.
- Issued Aug 21, 2025
6 units
Addition and/or Alteration · FOR A LEVEL I INTERIOR ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO FINISHES UPGRADE. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.**SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.** ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF WORK**
- Issued Aug 21, 2025
6 units
Addition and/or Alteration · FOR A LEVEL I INTERIOR ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO FINISHES UPGRADE. FOR USE AS MULTI-FAMILY (6 UNITS) HOUSEHOLD LIVING. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ** ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF WORK** 10/22/25 AMENDMENT: AMENMENT TO UPDATE BASEMENT AS PER PLANS.
- Issued Aug 21, 2025
6 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO EXISTING R2 OCCUPANCY (6 DWELLING UNITS) IN AN EXISTING BUILDING. ALL WORK TO BE DONE PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 21, 2025
6 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO AN EXISTING SIX (6) FAMILY DWELLING (GROUP R-2). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. **ASBESTOS ABATEMENT REQUIRED**
Violations
9 entries
- Unsafe Apr 29, 2026ACTIVE
Unsafe structure designation
- Violation Jul 7, 2026OPEN
RUBBISH & GARBAGE
- Violation Jul 7, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Apr 29, 2026OPEN
UNSAFE STRUCTURE
- Violation Apr 29, 2026OPEN
ARCHITECT/ENGINEER SERVICES
- Violation Apr 29, 2026OPEN
EXTERIOR WALLS
- Violation Jan 7, 2026OPEN
PERIODIC TESTING
- Violation Jan 7, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Jul 26, 2024OPEN
EXTERIOR STRUCTURE DOORS
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.