- Issued Oct 6, 2026
Sign · FOR THE INSTALLATION OF THREE (3) ACCESSORY SIGNS: ONE (1) INTERNALLY ILLUMINATED FREESTANDING (PYLON) SIGN, DOUBLE-SIDED, 18’-11” H X 8’-3 3/8” W, WITH ELECTRONICALLY CHANGEABLE GAS-PRICE DISPLAYS; AND TWO (2) INTERNALLY ILLUMINATED FLAT-WALL/CHANNEL-LETTER SIGNS: ONE (1) 44-IN. CHANNEL-LETTER SIGN, SINGLE-SIDED, 5’-6 1/4” H X 12’-1 11/16” W, AND ONE (1) 32-IN. CHANNEL-LETTER SIGN, SINGLE-SIDED, 4’-3 13/16” H X 9’-2 5/8” W; AS PER APPROVED PLANS. *********SEPARATE ELECTRICAL PERMIT REQUIRED.
- Issued Sep 18, 2026
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Sep 17, 2026
New Construction · Low Voltage installation of (83) Cat5e network cables for registers and screens.
- Issued Sep 17, 2026
Signs (Accessory / Non-Accessory) · FOR THE ERECTION OF THREE (3) ACCESSORY SIGNS: ONE (1) INTERNALLY ILLUMINATED FREESTANDING (PYLON) SIGN, DOUBLE-SIDED, 18’-11” H X 8’-3 3/8” W, WITH ELECTRONICALLY CHANGEABLE GAS-PRICE DISPLAYS; AND TWO (2) INTERNALLY ILLUMINATED FLAT-WALL/CHANNEL-LETTER SIGNS: ONE (1) 44-IN. CHANNEL-LETTER SIGN, SINGLE-SIDED, 5’-6 1/4” H X 12’-1 11/16” W, AND ONE (1) 32-IN. CHANNEL-LETTER SIGN, SINGLE-SIDED, 4’-3 13/16” H X 9’-2 5/8” W; SIGNS ACCESSORY TO THE EXISTING CONVENIENCE STORE AND VEHICLE FUELING STATI
- Issued Sep 16, 2026
Addition and/or Alteration · Connect 4 new signs to existing sign circuits. No new wiring. General Permit #GP-2026-006436 All work to be perform according to the 2020 NEC and per executed contract.
- Issued Sep 8, 2026
Sign · FOR THE INSTALLATION OF FOUR (4) STATICALLY ILLUMINATED ACCESSORY WALL SIGNS. SIZE AND LOCATION AS SHOWN IN PLANS. **SEPARATE PERMITS TO BE OBTAINED FOR ALL ELECTRICAL WORK**
- Issued Aug 27, 2026
Addition and/or Alteration · HORIZONTAL CABLING: • Provide labor to install twenty-five (25) flush mount dual Category 6 locations. • Provide labor to install one (1) surface mount single Category 6 wireless access point location. • Provide labor to install sixteen (16) single Category 6 camera locations. These cables will be left unterminated and coiled at teach end for final terminations/connections by others. • Provide labor to install four (4) flush mount in-room dual Category 6 locations. • Provide labor to install fiv
- Issued Aug 11, 2026
Alterations · Remodel of existing Wawa Store including mechanical/plumbing systems, including selective demolition and replacement of fixtures, floor drains, sinks, and associated sanitary, vent, hot water, cold water, and specialty water piping.
- Issued Jul 30, 2026
1 units
Addition and/or Alteration · LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR INTERIOR AND EXTERIOR RENOVATIONS TO EXISTING BANK BUILDING AS PER APPROVED PLANS. EXISTING BUILDING NOT REQUIRED TO BE SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**
- Issued Jul 30, 2026
Addition and/or Alteration · Upgrade electrical service to 400 amps with grounding. Install new lighting and switching, new outlets and power to HVAC systems. New lighting and HVAC control system. Conduit stub ups for data as per 2017 NEC. No fire alarm.
- Issued Jul 27, 2026
Signs (Accessory / Non-Accessory) · For the installation of four (4) statically illuminated wall signs. Size and location as shown in application/plans.
- Issued Jul 22, 2026
Alterations · ALTERATIONS TO BANK. . INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Jun 25, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNITS, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
- Issued Jun 23, 2026
1 units
Addition and/or Alteration · FOR LEVEL III ALTERATIONS TO INCLUDE DOORS, NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND WORK. *IEBC 2018*
- Issued Apr 7, 2026
1 units
Addition and/or Alteration · INTERIOR ALTERATION TO THE DAY CARE CENTER ON THE GROUND FLOOR OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, AND PLUMBING WORK**
Violations
1 entry
- Violation Oct 21, 2026OPEN
REPLACE ROOF COVERING
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 7, 2026.