Built (as contractor)
162 entries
- Issued Oct 26, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing
- Issued Oct 20, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Oct 19, 2026
New Construction or Additions · NEW CONSTRUCTION OF 49 UNIT APARTMENT BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION FOR PIPIJNG SERVING FIXTURES IN COMMMERCIAL SPACES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE BASE VENTING CODE. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Oct 9, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2026-005793
- Issued Oct 9, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2026-005795
- Issued Oct 9, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2026-005793
- Issued Oct 9, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2026-005794
- Issued Oct 9, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2026-005794
- Issued Oct 9, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2026-005792
- Issued Oct 9, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2026-005794
- Issued Oct 9, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2026-005793
- Issued Oct 9, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2026-005795
- Issued Oct 9, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2026-005795
- Issued Oct 8, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing
- Issued Oct 8, 2026
New Construction or Additions · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH. ALL WORK PERFORMED IN COMPLIANCE WITH 2021 PPC AND APPROVED PLANS
- Issued Oct 7, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Oct 7, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing House/Building Drain House/Building Curb Trap House/Building Fresh Air Inlet Water Distribution
- Issued Sep 21, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Sep 17, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2026-004035
- Issued Sep 16, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2026-004035
- Issued Sep 16, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2026-004035
- Issued Sep 15, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2026-004036
- Issued Sep 15, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2026-004036
- Issued Sep 15, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2026-004036
- Issued Sep 10, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Sep 9, 2026
New Construction or Additions · House/Building Drain House/Building Curb Trap House/Building Fresh Air Inlet Water Distribution
- Issued Sep 4, 2026
Alterations · Plumbing Permit (Interior) for combo CP-2026-000745
- Issued Aug 24, 2026
New Construction or Additions · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing.
- Issued Aug 18, 2026
New Construction or Additions · - Exterior Storm and Sanitary Plumbing for New Construction in accordance with EZ Permit Standard for Plumbing. CTs, FAIs & MDs. - Exterior 1.5" Water Distribution for New Construction in accordance with EZ Permit Standard for Plumbing.
- Issued Aug 18, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE CT, FAI & MD.
- Issued Aug 11, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH.
- Issued Aug 5, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing
- Issued Aug 3, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-008671
- Issued Aug 3, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-008671
- Issued Jul 29, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing
- Issued Jul 29, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-007123
- Issued Jul 22, 2026
Alterations · Install drain,waste, vent and water supply lines for 2 Toilets, 2 vanities, 2 tub, 2 washer boxes and 2 kitchen sinks
- Issued Jul 16, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-007081
- Issued Jul 16, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-007081
- Issued Jul 15, 2026
New Construction or Additions · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Jul 8, 2026
Alterations · House/Building Drain House/Building Curb Trap House/Building Fresh Air Inlet
- Issued Jul 2, 2026
New Construction or Additions · House/Building Drain House/Building Curb Trap House/Building Fresh Air Inlet 1.5" Water Distribution
- Issued Jul 2, 2026
Alterations · ALTERATIONS TO EXISTING MIXED USE BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION FOR FOR VENTS SERVING FIXTURES IN COMMERCIAL SPACE. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Jun 30, 2026
Alterations · Plumbing Permit (Interior) for combo CP-2026-001338
- Issued Jun 12, 2026
New Construction or Additions · INSTALL SANITARY AND STORM CTs, FAIs, MDs & 1" WDP.
- Issued Jun 10, 2026
Alterations · Plumbing Permit (Interior) for combo RP-2026-004296 1 kitchen sink, 1 water closet, 1 lavatory & 1 shower/tub.
- Issued Jun 9, 2026
New Construction or Additions · INSTALL SANITARY AND STORM CTs, FAIs, MDs & 1.5" WATER LINE.
- Issued Jun 4, 2026
Alterations · Install 15 lavatories, 2 floor sinks, 1 kitchen sink, 1 hand sink, 1 grease interceptor, 1 mop sink, 1 shower, 1 drinking fountain, 11 water closets, 2 floor drains, 2 urinals, 1 hot water heater, 1 backflow preventer and 1 three compartment sink. All work to be done according to the 2018 PPC and per approved plans.
- Issued Jun 4, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH.
- Issued Jun 2, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURES ROUGH-IN TO FINISH
- Issued May 28, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH.
- Issued May 28, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH.
- Issued May 28, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH.
- Issued May 28, 2026
New Construction or Additions · NEW CONSTRUCTION OF TRIPLEX. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued May 20, 2026
New Construction or Additions · INSTALL House/Building Drain House/Building Curb Trap 1" Water Distribution House/Building Fresh Air Inlet
- Issued May 18, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH.
- Issued May 15, 2026
New Construction or Additions · INSTALL: House/Building Drain House/Building Curb Trap 1.5" Water Distribution House/Building Fresh Air Inlet
- Issued May 11, 2026
New Construction or Additions · NEW CONSTRUCTION OF TRIPLEX. EXTERIOR INSTALLATION OF CURB TRAP, FAI, MAIN DRAIN, AND WATER DISTRIBUTION PIPE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued May 11, 2026
New Construction or Additions · INSTALL NEW SANITARY AND STORM CTs, FAIs, MDs & 1.5" WATER DISTRIBUTION PIPE.
- Issued May 8, 2026
New Construction or Additions · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued May 8, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH.
- Issued May 7, 2026
New Construction or Additions · INSTALL SANITARY AND STORM CTs, FAIs, MDs & 1.5" WDP.
- Issued May 4, 2026
Alterations · 5" House/Building Drain 5" House/Building Curb Trap 5" House/Building Fresh Air Inlet
- Issued Apr 30, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH.
- Issued Apr 17, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURES ROUGH-IN TO FINISH
- Issued Apr 16, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-007081
- Issued Apr 15, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH.
- Issued Apr 9, 2026
New Construction or Additions · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH.
- Issued Apr 9, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH.
- Issued Mar 31, 2026
New Construction or Additions · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH.
- Issued Mar 17, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-007123
- Issued Mar 10, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR 12 FIXTURES.
- Issued Feb 16, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-012623
- Issued Feb 16, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-012623
- Issued Feb 16, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-005950
- Issued Feb 16, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012623
- Issued Feb 16, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-005949
- Issued Feb 16, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-005947
- Issued Feb 16, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-005948
- Issued Feb 12, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR 10 FIXTURES.
- Issued Feb 9, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURE ROUGH-IN TO FINISH.
- Issued Jan 27, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-005949
- Issued Jan 23, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-005947
- Issued Jan 23, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-005950
- Issued Jan 23, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-005950
- Issued Jan 23, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-005947
- Issued Jan 22, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-005948
- Issued Jan 22, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-005949
- Issued Jan 22, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-005948
- Issued Jan 14, 2026
Alterations · Plumbing Permit (Interior) for combo RP-2025-009494
- Issued Jan 13, 2026
Alterations · INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURES CONNECTING TO EXISTING METALLIC PIPING. ALL PIPING UTILIZED SHALL BE METALLIC. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Jan 8, 2026
New Construction or Additions · 8in House/Building Drain 8in House/Building Curb Trap 8in House/Building Fresh Air Inlet 2in domestic Waterline 1in commercial Waterline
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 2, 2026.