Entity File · The Public Record
Contractor
Qazim Kupa
7 permits
- Records on file
- 7
Built (as contractor)
7 entries
- Issued Dec 15, 2025
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED STRUCTURE, ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE & LOCATION AS SHOWN ON THE APPLICATION/PLANS.
- Issued Dec 15, 2025
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED STRUCTURE HEIGHT 34.75 FT WITH CELLAR.
- Issued Oct 5, 2025
1 units
New Construction · For the erection of three story attached structure with roof deck and roof deck access structure. details per plan.
- Issued Oct 5, 2025
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- Issued Aug 26, 2025
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN ON PLANS.
- Issued Aug 7, 2025
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. No underpinning or excavation under 5 ft.
- Issued Jul 24, 2025
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.