Entity File · The Public Record
Company / LLC
Raffael Construction LLC
1 property · $270K acquired · 3 sold · 10 permits · 2 violations
- Records on file
- 16
- Acquired
- $270K
Acquired
1 entry
Sold
3 entries
Permits (as owner)
7 entries
- Issued Aug 14, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2026-005181
- Issued Aug 14, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2026-005181
- Issued Aug 14, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2026-005181
- Issued Jun 24, 2026
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED BUILDING TO INCLUDE ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS
- Issued May 20, 2026
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED BUILDING WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN ON PLANS.
- Issued Jul 16, 2025
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED BUILDING TO INCLUDE WALKOUT ROOF DECK AT FOURTH FLOOR LEVEL. SIZE AND LOCATION AS SHOWN IN PLANS
Built (as contractor)
3 entries
- Issued Aug 17, 2026
1 units
New Construction · NEW CONSTRUCTION OF AN ATTACHED STRUCTURE TO INCLUDE PILOT HOUSE AND ROOF DECK FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2021 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY.
- Issued Aug 6, 2026
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2021 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- Issued Jul 15, 2026
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT AND NO EXCAVATION BELOW FIVE FEET PROPOSED). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
Violations
2 entries
- Violation Jun 1, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 1, 2026OPEN
RUBBISH & GARBAGE
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated September 12, 2026.