- Issued Aug 20, 2025
Minor Demolition · **MAKE SAFE PERMIT** FOR THE COMPLETE DEMOLITION OF THE EXISTING TWO (2) STORY MASONRY STRUCTURE (MORE THAN 2/3RD JOISTS REMOVAL WITH EXTERIOR WALL ALTERATION) TO COMPLY WITH VIOLATION CASE # CF-2022-091818. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIO
- Issued Jul 25, 2025
Minor Demolition · FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURES. EXISTING STRUCTURES TO BE DEMOLISHED BY A COMBINATION OF HAND-HELD AND MECHANICAL EQUIPMENT PER APPROVED PLANS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. * A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. * 21 DAY POSTING AND NOTICE REQUIRED PER A-3
- Issued Jul 22, 2025
Minor Demolition · COMPLETE DEMOLITION OF AN EXISTING ATTACHED ONE-STORY, MASONRY AND WOOD COMMERCIAL BUILDING BY HAND METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. COMPLETE SIDEWALK CLOSURE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PE
- Issued Jul 22, 2025
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING ONE (1) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE. *ASBESTOS ABATEMENT REQ
- Issued Jul 22, 2025
Minor Demolition · COMPLETE DEMOLITION OF AN EXISTING SEMI-DETACHED ONE-STORY, MASONRY AND WOOD COMMERCIAL BUILDING BY HAND & MECHANICAL METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. COMPLETE SIDEWALK CLOSURE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN A
- Issued Jul 22, 2025
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING ONE (1) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE. *ASBESTOS ABATEMENT REQ
- Issued Jul 22, 2025
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING ONE (1) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE. *ASBESTOS ABATEMENT REQ
- Issued Jul 22, 2025
Minor Demolition · COMPLETE DEMOLITION OF AN EXISTING ATTACHED ONE-STORY, MASONRY AND WOOD COMMERCIAL BUILDING BY HAND METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. COMPLETE SIDEWALK CLOSURE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PE
- Issued Jul 22, 2025
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING ONE (1) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY BOTH MECHANICAL AND HAND DEMOLITION METHODS. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE. *ASBESTOS
- Issued Jul 22, 2025
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING ONE (1) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE. *ASBESTOS ABATEMENT REQ
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.