- Issued Jun 25, 2026
New Construction · Electrical Permit for combo RP-2025-012865
- Issued May 20, 2026
Combined Lot Line Relocation and New Development · For lot line relocation to create five (5) lot (Parcel A, Parcel B, Parcel C, Parcel E, and Parcel D) from existing two (2) lot (1748-52 N 31st St and 1754-56 N 31st St.).
- Issued May 13, 2026
New Construction · FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITN NFPA 13D, WITH A ONE-INCH COMBINED FIRE SERVICE LINE, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued May 13, 2026
New Construction · THE INSTALLATION OF A ONE (1) INCH COMBINED SERVICE LINE FOR A FIRE & DOMESTIC SUPPLY LINE AND FIRE SERVICE LINE WITH REMOTE TOILET CONNECTION PER PLANS. MULTIPURPOSE RESIDENTIAL FIRE SPRINKLER SYSTEM DESIGNED IN ACCORDANCE WITH NFPA 13D. ALL WORK SHALL BE ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS, AND APPROVED BUILDING PERMIT. SEPARATE PERMITS REQUIRED FOR ALL PLUMBING WORK.
- Issued May 13, 2026
New Construction · FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13D THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 1" COMBINED FIRE SERVICE LINE AS PER APPROVED PLANS. **ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.**
- Issued May 13, 2026
New construction, addition, GFA change · New construction of a three story single family structure as per approved plan NTE 38' in height as part of the affordable housing development plan. PLAN AMMENDED TO UPDATE PA ONE CALL NUMBER AS REQUESTED BY STREETS DEPARTMENT.
- Issued Apr 28, 2026
1 units
New Construction · FOR THE ERECTION OF A SEMI-DETACHED TWO (2) STORY STRUCTURE. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN SEVEN (7) FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQ
- Issued Mar 19, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-012865
- Issued Mar 19, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-012862
- Issued Mar 19, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-012863
- Issued Mar 12, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-012863
- Issued Mar 12, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012863
- Issued Mar 12, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-012862
- Issued Mar 12, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012865
- Issued Mar 12, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012862
- Issued Mar 12, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-012863
- Issued Mar 12, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-012865
- Issued Mar 12, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-012862
- Issued Mar 12, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-012865
- Issued Feb 13, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED THREE-STORY STRUCTURE FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 7 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR ST
- Issued Feb 13, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED THREE-STORY STRUCTURE FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 7 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR ST
- Issued Feb 6, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED THREE-STORY STRUCTURE FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 7 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR ST
- Issued Oct 23, 2025
New construction, addition, GFA change · New construction For erection of an attach structure (not to exceed 38 feet in height) to use as single-family household living. Size and location per plan.
- Issued Oct 23, 2025
New construction, addition, GFA change · For the erection of a three-story semi-detached structure. Size and location per plan.
- Issued Oct 23, 2025
New construction, addition, GFA change · Erection of an attached structure to use as single family household living, size and location as shown on the plan.
- Issued Sep 4, 2025
New construction, addition, GFA change · FOR THE ERECTION OF A TWO (2) STORY SEMI-DETACHED STRUCTURE, FOR USE AS A SINGLE-FAMILY HOUSEHOLD, SIZE AND LOCATION AS SHOWN IN THE PLAN. Amendment #1: Amend to increase the GFA within 10% of the original approval, as per the amended plan.
Violations
26 entries
- Violation Jun 30, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jun 29, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jun 26, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jun 26, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 26, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 24, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 24, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 22, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 22, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 16, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 16, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 4, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 4, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 27, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 27, 2026OPEN
RUBBISH & GARBAGE
- Violation May 27, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 27, 2026OPEN
RUBBISH & GARBAGE
- Violation May 18, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Apr 1, 2026OPEN
ALTER EXTERIOR PORTION
- Violation Dec 13, 2025OPEN
NEW USE
- Violation Dec 13, 2025OPEN
NEW USE
- Violation Sep 26, 2025OPEN
VACANT STRUCTURE LICENSE
- Violation Sep 26, 2025OPEN
EXTERIOR STRUCTURE STRUCTURAL MEMBERS
- Violation Sep 26, 2025OPEN
EXTERIOR STRUCTURE PROTECTIVE TREATMENT
- Violation Jun 18, 2025OPEN
NEW USE
- Violation Oct 28, 2024OPEN
EXTERIOR AREA MOTOR VEHICLE WITHIN THE PROPERTY LINE
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.