Entity File · The Public Record
Owner of record
Redevelopment Authority, Of Philadelphia
39 permits · 103 violations
- Records on file
- 142
Permits (as owner)
38 entries
- Issued Jul 7, 2026
New construction, addition, GFA change · Erection of a attached structure with cellar to use as single family household living, size and location as shown in the plan.
- Issued Jul 7, 2026
New construction, addition, GFA change · Erection of an attached structure with cellar to use as single family household living, size and location as shown in the plan.
- Issued Jul 7, 2026
New construction, addition, GFA change · erection of an attached structure with cellar to use as single family household living, size and location as shown in the plan.
- Issued Jul 2, 2026
New construction, addition, GFA change · ERECTION OF AN ATTACHED STRUCTURE.(SIZE AND LOCATION AS PER PLANS)
- Issued Jun 10, 2026
Sign · FOR THE INSTALLATION OF THREE (3) FLAT WALL SIGNS WITH STATIC ILLUMINATION, ONE (1) DOUBLE FACED FREE-STANDING SIGN W/ STATIC ILLUMINATION AND ONE (1) DOUBLE FACED DIRECTIONAL SIGN W/ STATIC ILLUMIATION. SEPARATE PERMIT REQUIRED FOR ELECTRICAL WORK.
- Issued Jun 1, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED TWO (2) STORY STRUCTURE. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN SEVEN (7) FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRE
- Issued Jun 1, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED TWO (2) STORY STRUCTURE. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN SEVEN (7) FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRE
- Issued May 18, 2026
New construction, addition, GFA change · For the erection of a two-story attached structure. Size and location per plan.
- Issued May 18, 2026
New construction, addition, GFA change · erection of an attached structure size and location as shown on plans.
- Issued May 15, 2026
New Construction or Additions · Installation of rough and finish plumbing throughout New water and sewer services 1.5” domestic water line New main sanitary and storm drain and curb traps and 4” fai
- Issued May 15, 2026
1 units
New Construction · FOR THE ERECTION OF A TWO (2) STORY STRUCTURE OF TYPE V-B CONSTRUCTION FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRE
- Issued May 14, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006792
- Issued May 13, 2026
New construction, addition, GFA change · New construction of a three story single family structure as per approved plan NTE 38' in height as part of the affordable housing development plan. PLAN AMMENDED TO UPDATE PA ONE CALL NUMBER AS REQUESTED BY STREETS DEPARTMENT.
- Issued May 6, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-008153 EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and/or Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction plans.
- Issued May 6, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-008152 EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and/or Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction plans.
- Issued Apr 30, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED 2-STORY STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. THE BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 8 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR
- Issued Apr 29, 2026
New Construction · Electrical Permit for combo RP-2025-008152 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction plans.
- Issued Apr 28, 2026
New Construction · Electrical Permit for combo RP-2025-008153 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction plans.
- Issued Mar 3, 2026
Signs (Accessory / Non-Accessory) · FOR THE REMOVAL AND REPLACEMENT OF THREE (3) STATICALLY ILLUMINATED WALL SIGNS, FOUR (4) NON-ILLUMINATED WALL SIGNS, ONE (1) 2-FACED FREESTANDING SIGN (LARGER THAN ORIGINAL), AND ONE (1) DIRECTIONAL SIGN. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS.
- Issued Mar 2, 2026
New Construction · FOR THE INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D THROUGHOUT THREE STORY BUILDING TO INCLUDE 1-INCH COMBINED WATER SERVICE LINE AS PER APPROVED PLANS. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Mar 2, 2026
New Construction · FOR THE INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D THROUGHOUT THREE STORY BUILDING TO INCLUDE 1-INCH COMBINED WATER SERVICE LINE AS PER APPROVED PLANS. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Dec 18, 2025
New Construction or Additions · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Dec 18, 2025
New Construction or Additions · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Nov 14, 2025
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS.
- Issued Nov 14, 2025
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS.
- Issued Nov 14, 2025
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS.
- Issued Nov 14, 2025
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS.
- Issued Oct 23, 2025
1 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED
- Issued Oct 23, 2025
1 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED
- Issued Oct 1, 2025
EZ Wall Covering Replacement · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Oct 1, 2025
EZ Bathroom & Kitchen Remodel · EZ Bathroom 3 piece bathroom on 2nd floor
- Issued Sep 29, 2025
1 units
Foundation · FOR THE ERECTION OF A FOUNDATION FOR A NEW CONSTRUCTION. **WORK TO BE COMPLETED PER APPROVED PLANS**IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IBC 2018** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**FOUNDATION ONLY**
- Issued Sep 18, 2025
1 units
Foundation · FOR THE ERECTION OF A FOUNDATION FOR A NEW CONSTRUCTION. **WORK TO BE COMPLETED PER APPROVED PLANS**IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IBC 2018** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**FOUNDATION ONLY**
- Issued Sep 11, 2025
1 units
New Construction · FOR THE NEW CONSTRUCTION OF THREE (3) STORY BUILDING OF TYPE VB CONSTRUCTION WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR THE USE OF SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS.
- Issued Sep 9, 2025
1 units
New Construction · **MASTER PERMIT APPROVAL ONLY - SEPARATE PERMITS TO BE FILED FOR EACH BUILDING/PARCEL** FOR THE ERECTION OF NINETEEN (19) THREE (3) STORY STRUCTURES OF TYPE V-B CONSTRUCTION FOR USE AS SINGLE-FAMILY DWELLINGS, ONE EACH ON 1600-16 N 9TH ST PARCELS "B" THROUGH "T" (SEE ZONING PERMIT ZP-2024-002168 FOR LOT SUBDIVISION) AS PER PLANS AND APPLICATION DOCUMENTS AND IN ACCORDANCE WITH 2018 IRC. EACH BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13D AUTOMATIC SPRINKLER SYSTEM. SEPARATE PERMIT
- Issued Jul 10, 2025
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH A ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE, FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING, THE SIZE AND LOCATION AS SHOWN ON THE PLAN.
Built (as contractor)
1 entry
- Issued Jul 17, 2025
1 units
New Construction · FOR THE ERECTION OF AN ONE-STORY STRUCTURE TO BE USED AS A PUBLIC RESTROOM ACCESSORY TO CLARK PARK AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY MEP WORK. *2018 IBC*
Violations
103 entries
- Unsafe Jan 8, 2020ACTIVE
Unsafe structure designation
- Violation Jul 9, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jun 30, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 30, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 29, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jun 29, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jun 25, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Jun 25, 2026OPEN
HAZARD IDENTIFICATION SIGNS
- Violation Jun 25, 2026OPEN
EXIT DOORS
- Violation Jun 25, 2026OPEN
FIRE EXTINGUISHER HANGERS & BRACKETS
- Violation Jun 25, 2026OPEN
EMERGENCY LIGHTING ACTIVATION TEST
- Violation Jun 25, 2026OPEN
FIRE RESISTANCE RATED CONSTRUCTION
- Violation Jun 16, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jun 16, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jun 15, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 15, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 13, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 13, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 10, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 10, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 10, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 10, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 10, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 10, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 9, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 9, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 8, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 8, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 8, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 8, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 8, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 8, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 8, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 8, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 8, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 8, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 6, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 6, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 6, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 6, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 5, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 5, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 4, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 4, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 4, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 4, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 4, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 4, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 4, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 4, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 4, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 4, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 4, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 4, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 4, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 4, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 4, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 4, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 4, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 4, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 4, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 4, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 4, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 4, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 26, 2026OPEN
RUBBISH & GARBAGE
- Violation May 26, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 26, 2026OPEN
RUBBISH & GARBAGE
- Violation May 26, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 20, 2026OPEN
RUBBISH & GARBAGE
- Violation May 20, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 20, 2026OPEN
RUBBISH & GARBAGE
- Violation May 20, 2026OPEN
RUBBISH & GARBAGE
- Violation May 20, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 20, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 20, 2026OPEN
RUBBISH & GARBAGE
- Violation May 20, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 13, 2026OPEN
EXTERIOR AREA SANITATION
- Violation May 4, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 4, 2026OPEN
RUBBISH & GARBAGE
- Violation Feb 26, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Feb 26, 2026OPEN
EXTERIOR STRUCTURE ROOF DRAINAGE
- Violation Jan 16, 2026OPEN
ENCROACHING TREES
- Violation Jan 16, 2026OPEN
ENCROACHING TREES
- Violation Nov 25, 2025OPEN
ENCROACHING TREES
- Violation Nov 19, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Oct 30, 2025OPEN
EXTERIOR AREA SANITATION
- Violation Oct 30, 2025OPEN
ZONING AND USE REGISTRATION PERMITS
- Violation Aug 26, 2025OPEN
NEW USE
- Violation Aug 1, 2025OPEN
EXTERIOR AREA SANITATION
- Violation Aug 1, 2025OPEN
EXTERIOR AREA WEEDS
- Violation Apr 30, 2025OPEN
EXTERIOR AREA SANITATION
- Violation Apr 30, 2025OPEN
EXTERIOR AREA WEEDS
- Violation Apr 30, 2025OPEN
VEGETATION
- Violation Feb 28, 2025OPEN
REMOVAL OF COMBUSTIBLES
- Violation Feb 28, 2025OPEN
EXTERIOR AREA SANITATION
- Violation Jan 23, 2025OPEN
NEW USE
- Violation Aug 15, 2024OPEN
EXTERIOR STRUCTURE IDENTIFICATION
- Violation Aug 15, 2024OPEN
VACANT PROPERTIES
- Violation Aug 15, 2024OPEN
EXTERIOR AREA WEEDS
- Violation Aug 15, 2024OPEN
EXTERIOR AREA SANITATION
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.