Entity File · The Public Record

Contractor

Redion Xhoxhi Joji Contractors

4 permits

Records on file
4

Built (as contractor)

4 entries

  1. Issued Aug 6, 2026

    1 units

    3136 S 17th St

    New Construction · FOR THE COMPLETE DEMOLITION AND NEW CONSTRUCTION OF SEMI-DETACHED STRUCTURE TO INCLUDE PILOT HOUSE AND ROOF DECK FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. THE STRUCTURE IS TO BE BUILT ON THE EXISTING FOUNDATION, WITH ADDITIONAL DEEP DRIVEN HELICAL PILES AT THE REAR. NO EXCAVATION PROPOSED. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK AND THE EXTENSION OF THE ADJACENT CHIMNEY. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST A

  2. Issued Jul 16, 2026

    3136 S 17th St

    Minor Demolition · FOR THE COMPLETE DEMOLITION (REMOVAL OF 2/3 OF STRUCTURAL FRAMING AND REAR EXTERIOR WALL) OF THE EXISTING TWO (2) STORY SEMI-DETACHED MASONRY STRUCTURE. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH THE PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. **21 DAY POSTING & NOTICE REQU

  3. Issued Apr 28, 2026

    3136 S 17th St

    New construction, addition, GFA change · FOR THE COMPLETE DEMOLITION OF EXISTING BUILDING; FOR THE ERECTION OF A SEMI-DETACHED BUILDING WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN ON PLANS.

  4. Issued Apr 22, 2026

    6 units

    2643 Emily St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY SEMI-DETACHED STRUCTURE OF TYPE V-A CONSTRUCTION WITH BASEMENT, ROOF DECKS, AND ROOF DECK ACCESS STRUCTURES. FOR USE AS A GROUP R-2 SIX (6) FAMILY DWELLING. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. STANDPIPES TO BE INSTALLED IN INTERIOR EXIT STAIRWAY ENCLOSURES PER NFPA 14. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK.

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.