13 permits · 11 violations
- Records on file
- 24
Permits (as owner)
13 entries
- Issued Jun 22, 2026
Addition and/or Alteration · New circuits: Install new circuit from panel to new location (1) cook-top, (1) wall oven (1) microwave, (2) counter-top, (1) fridge, (1) dishwasher, (1) g.disposal, (1) general lighting Lighting: Install dimmer switch, switch control wire, feed wire, customer provided light fixture or recessed lights. Recessed: (4) kitchen fixtures customer provided: (2) section of under-cabinet lights, (4) pendant lights Receptacles: Install feed wire, outlet box and standard white receptacle or customer provi
- Issued Jun 12, 2026
Alterations · Kitchen renovation Relocate drain and water lines to new fixture locations Install finished fixtures: kitchen sink, disposal, dishwasher Relocate 3" stack
- Issued Apr 30, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE NEW FLOORING, FIXTURES, FURNISHINGS, AND FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Mar 6, 2026
Addition and/or Alteration · Wire 80 recessed lights, 70 receptacles, and install low voltage wiring including coaxial and cable for entertainment and 2017 NEC. Service is existing.
- Issued Feb 2, 2026
New Construction or Additions · Install 1 kitchen sink, 1 dishwasher, 1 washing machine box, 1 laundry sink, 5 lavatories, 3 shower/tub and 3 water closets. All work to be done according to the 2018 PPC and per approved plans.
- Issued Jan 14, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Oct 31, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (22) sprinkler heads, per NFPA 13
- Issued Oct 30, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO CONVERT TWO UNITS INTO ONE UNIT TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- Issued Oct 27, 2025
Addition and/or Alteration · INSTALL 1 SPERKER/STROBE AND 1 STROBE. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Oct 18, 2025
Addition and/or Alteration · Relocate 2 exit, 1 switch. Install 1 switch, 2 receptacles, 5 furniture power. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC ABD PER PLANS.
- Issued Sep 25, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (9) SPRINKLER HEADS ON THE 18TH FLOOR, PER NFPA 13
- Issued Sep 23, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Furnish labor to relocate 6 existing diffusers, with no wall penetrations, and within a single tenant space on the 18th floor - Suite 1810.
- Issued Sep 15, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO A PORTION OF THE 18TH FLOOR OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. ** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
Violations
11 entries
- Violation Jan 22, 2026OPEN
PERIODIC TESTING
- Violation Jan 22, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Jan 22, 2026OPEN
DAMPER CERTIFICATION REPORT
- Violation Jan 22, 2026OPEN
RECORDS
- Violation Jan 22, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Jan 22, 2026OPEN
COMMERCIAL SYSTEM TEST
- Violation Jan 22, 2026OPEN
PENETRATIONS MAINTAINING PROTECTION
- Violation Jan 22, 2026OPEN
EQUIPMENT ROOMS
- Violation Jan 22, 2026OPEN
DOOR OPERATION
- Violation Jan 22, 2026OPEN
UNAPPROVED CONDITIONS
- Violation Jan 22, 2026OPEN
HIGH-RISE BUILDING
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.