THE INDEX: 84 78 · week of Aug 24permits quiet, openings quiet, deal ledger running hot

The Philadelphia Index

Entity File · The Public Record

Delinquent

Owner of record

Resow Fanny

6 permits · $4K owed

Records on file
7
Owed to the city
$4,224

Permits (as owner)

6 entries

  1. Issued Jul 29, 2026

    2319 N 10th St

    City Demolition · Sub Demolition Permit for CF-2026-094218. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No sidewalk. No stucco. Erosion control mat with topsoil and seed. 4' corral fence across front.

  2. Issued Jul 29, 2026

    2319 N 10th St

    Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh

  3. Issued Jul 29, 2026

    1 units

    2319 N 10th St

    New Construction · FOR THE ERECTION OF AN ATTACHED THREE-STORY STRUCTURE FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 8-FEET (1/4TH OF HEIGHT OF BUILDING) OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IB

  4. Issued Jul 29, 2026

    1 units

    2319 N 10th St

    New Construction · FOR THE ERECTION OF AN ATTACHED THREE-STORY STRUCTURE FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 8-FEET (1/4TH OF HEIGHT OF BUILDING) OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IB

  5. Issued Jul 29, 2026

    1 units

    2319 N 10th St

    New Construction · FOR THE ERECTION OF AN ATTACHED THREE-STORY STRUCTURE FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 8-FEET (1/4TH OF HEIGHT OF BUILDING) OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IB

  6. Issued May 12, 2026

    2319 N 10th St

    Excavation · Site / Utility Permit for RP-2025-010058, RP-2025-010059, AND RP-2025-010060.

Owes the city

1 entry

  1. 37 yrs owed

    2319 N 10th St

    $4,224

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated September 12, 2026.