THE INDEX: 64 17 · week of Jun 29permits soft, openings quiet, deal ledger quiet

The Philadelphia Index

Entity File · The Public Record

Company / LLC

Rj Construction Services LLC

5 permits

Records on file
5

Built (as contractor)

5 entries

  1. Issued Apr 15, 2026

    1 units

    224 Market St

    Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING RESTAURANT ON THE FIRST AND SECOND FLOOR LEVEL, ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE ACCESSIBILITY IMPROVEMENTS AND PROVIDE FINISHES THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. *************************SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. ****************************************

  2. Issued Jan 13, 2026

    2743 S 3rd St

    Addition and/or Alterations · FOR THE INSTALLATION OF HVAC RTUs, GRDs, BATHROOM EXHAUSTS, AND ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2024-001071 FOR ASSOCIATED BUILDING PERMIT.

  3. Issued Nov 24, 2025

    1823 S 10th St

    Addition and/or Alteration · For the erection of an addition and for interior and exterior alterations to an existing attached single-family dwelling per plans. Separate permits are required for all associated Mechanical, Electrical, and Plumbing work. Basement to remain non-habitable, to be used for storage and utilities only.

  4. Issued Jul 24, 2025

    821-25 N 13th St

    New Construction · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.

  5. Issued Jul 16, 2025

    1823 S 10th St

    Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. install new 70,000 btu gas heat 90% and 2.5 ton ac unit with duct work

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.