Entity File · The Public Record
Company / LLC
Royal Construction INC
7 permits
- Records on file
- 7
Built (as contractor)
7 entries
- Issued Jul 9, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. New HVAC system, ductwork, and 12 diffusers
- Issued Jul 1, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. HVAC system, ductwork, and 12 diffusers
- Issued Jun 23, 2026
Addition and/or Alteration · EZ PERMIT STANDARDS ALTERATIONS- For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/
- Issued Jun 23, 2026
Addition and/or Alteration · EZ PERMIT STANDARDS ALTERATIONS- For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/
- Issued May 12, 2026
Addition and/or Alteration · LEVEL III ALTERATION AND FOR THE ERECTION OF A REAR ADDITION TO INCLUDE ROOF DECK AND ROOF DECK ACCESS STRUCTURE AND THE MODIFICATION OF EXISTING REAR WALLS TO AN EXISTING ATTACHED STRUCTURE. DETAILS AS SHOWN IN APPLICATION/PLANS
- Issued Mar 5, 2026
Make Safe Permit For RP · MAKE SAFE PERMIT TO COMPLY WITH CF-2025-130218 TO INCLUDE PARTIAL DEMOLITION, CONSTRUCTION OF REAR FOUNDATION, REPAIRS/REPLACEMENT OF EXTERIOR WALLS AND FRAMING PER APPROVED PLANS AND IN ACCORDANCE WITH CODE BULLETIN PM-1801. LICENSED PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION. SEPARATE PERMITS REQUIRED FOR ADDITIONAL ALTERATIONS NOT
- Issued Aug 14, 2025
Make Safe Permit For RP · FOR THE STRUCTURAL REPAIR TO EXTERIOR WALL, JOISTS AND ROOF TO RESOLVE CASE #CF-2021-039623. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE #CF-2021-039623. ** SPECIAL INSPECTIONS REQUIRED **
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.