Entity File · The Public Record
Owner of record
Santoso Iwan
7 permits
- Records on file
- 7
Permits (as owner)
7 entries
- Issued Jul 6, 2026
Addition and/or Alteration · Install Additional Fire Alarm Devices In Commercial Kitchen Area And attachment To hood To NFPA 72 And 2017 NEC.
- Issued Jun 3, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 5 existing sprinkler heads for tenant alterations
- Issued Apr 15, 2026
Alterations · ALTERATIONS TO EXISTING RESTAURANT. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Mar 1, 2026
Addition and/or Alteration · Electrical Fit Out Of 1st Floor Commercial Space With Existing Panel- New Outlets, Switches And Lighting In 825sqft Space To NEC Code
- Issued Feb 22, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install a wet chemical kitchen fire suppression system for a 11'-0" hood
- Issued Feb 12, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (11'-0") AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018**
- Issued Feb 4, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE. FOR USE AS A BUSINESS OCCUPANCY (SIT-DOWN RESTAURANT). ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.