Entity File · The Public Record
Owner of record
School District Of Phila
197 permits · 2456 violations
- Records on file
- 2653
Permits (as owner)
197 entries
- Issued Oct 19, 2026
1 units
Addition and/or Alteration · For Level II Alterations to the roof of an existing structure to include Partial Demolition, the complete removal and replacement of approximately 47,900 square feet of existing low-slope roofing across all affected roof levels. The scope of the project requires full replacement of the existing roofing system with a new roofing assembly, along with the replacement of roof access doors and selected ladders. for use as previously approved. as per approved plans.
- Issued Oct 7, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Oct 5, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE WATER FOUNTAIN WITHOUT PIPING.
- Issued Oct 5, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE WATER FOUNTAIN WITHOUT PIPING.
- Issued Oct 5, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE WATER FOUNTAIN WITHOUT PIPING.
- Issued Oct 5, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE WATER FOUNTAIN WITHOUT PIPING.
- Issued Oct 5, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing. REPLACE WATER FOUNTAIN WITHOUT PIPING.
- Issued Oct 1, 2026
Addition and/or Alteration · Install 116 CAT 6 cables, 7-12 strand fiber cables 1-23 strand fiber cable updating low voltage data cables Using existing runways, pipes, wire mold. No new holes will be used
- Issued Sep 16, 2026
Addition and/or Alteration · Install telecommunications wiring and associated low-voltage cabling for the Public School Building. Work includes the installation of raceways, cables, outlet boxes, patch panels, communication outlets, equipment connections, and associated telecommunications devices, together with all required supports necessary for a complete and operational telecommunications system. All work shall be performed in accordance with the 2017 NEC and per executed contract.
- Issued Sep 15, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Sep 14, 2026
Addition and/or Alteration · Hall & Stem Room: - furnish and install ( 14) 2x4 lay-in fixtures as indicated in plans to include 1 in electrical room- furnish and install (6) emergency lights as indicated in plans . . furnish and install (10) remote heads as indicated in plans- furnish and install (3) exit/emergency lights as indicated in plans- demo receptacles on wall to be removed- install baseboard heater- complete previously started wiring as needed- install devices (switches, receptacles, occupancy sensors) Wrestling R
- Issued Sep 9, 2026
Addition and/or Alteration · Installation of 360kWac worth of solar inverters and 433.800kWdc worth of roof solar modules, conduit, wiring, ground-level readily-accessible utility disconnect. GP-2026-003235
- Issued Sep 8, 2026
Addition and/or Alteration · Install 200 Amp Service to Temporary Classroom Trailer w/ req'd surge protection .Wire Trailer , is to have tamper resistant receptacles-2020 NEC.
- Issued Sep 4, 2026
Tank Install/Removal · TANK REMOVAL PERMIT - REMOVE ONE (1) UNDERGROUND STORAGE TANKS (UST). THE REMOVAL MUST COMPLY WITH THE REGULATIONS OF THE PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION (PADEP). NO EXCAVATION NEAR THE BUILDING.
- Issued Sep 2, 2026
Addition and/or Alteration · Install telecommunications wiring and associated low-voltage cabling for the Public School Building. Work includes the installation of raceways, cables, outlet boxes, patch panels, communication outlets, equipment connections, and associated telecommunications devices, together with all required supports necessary for a complete and operational telecommunications system. All work shall be performed in accordance with the 2017 NEC and per executed contract.
- Issued Sep 2, 2026
Addition and/or Alteration · Install in existing pipe and runways. No new mounting or wire pathways will be installed 38 Cat 6 cables 4- 24 strand fiber cables
- Issued Aug 25, 2026
Addition and/or Alteration · Extension of fire alarm system to serve temporary trailer restrooms including the installation of 5 smoke detectors, 5 ceiling mount speaker/strobes, 2 pull stations and monitoring modules.
- Issued Aug 6, 2026
Addition and/or Alteration · Furnish and install a fire alarm system, including all required fire alarm control equipment, initiating devices, notification appliances and wiring. All devices shall be properly interconnected to provide required detection, notification, and system monitoring. All work to be perform according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued Aug 6, 2026
New construction, addition, GFA change · FOR THE INSTALLATION OF A 10' x 19' TEMPORARY MODULAR STRUCTURE. SIZE AND LOCATION AS SHOWN IN PLANS.
- Issued Jul 31, 2026
Addition and/or Alteration · Connect (11) Hydration stations to electricity (replace in kind). All work to be perform according to the 2020 NEC and per executed contract.
- Issued Jul 30, 2026
Addition and/or Alteration · Low voltage CCTV wire system* -Installation of interior telecommunication wiring -(1) 30amp twist lock for CCTV system. -Installing OM3 6 strand fiber. -Running armored Cat6 above ceiling tiles using J hooks. Materials: Armored cat6 1000ft OM3 6 strand fiber 30amp twist lock outlet 10/3 MC wire Double pole 30 amp Breaker.
- Issued Jul 27, 2026
1 units
Addition and/or Alteration · FOR CONCRETE REPAIRS PER APPROVED PLAN.
- Issued Jul 27, 2026
Addition and/or Alteration · Install EVACS fire alarm system. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jul 26, 2026
1 units
Addition and/or Alteration · ERECTION OF CORRIDOR ADDITION TO EXISTING EDUCATIONAL FACILITY AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR BATHROOM ADDITIONS. NOT REQUIRED TO BE SPRINKLERED *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**
- Issued Jul 21, 2026
Addition and/or Alteration · Upgrade (52) Cat6 cables throughout 1st and 2nd floors. Using existing pipe and wire mold and supporting means. no new pipe or wire mold will be installed.
- Issued Jul 16, 2026
Alterations · Plumbing Permit (Interior) for combo CP-2025-001314 Plumbing per plans
- Issued Jul 9, 2026
Addition and/or Alteration · Replace the existing fire alarm system with a new fire alarm system including the removal and replacement of the existing fire alarm control panel with a new fire alarm control panel as per 2016 NFPA 72.
- Issued Jul 6, 2026
Addition and/or Alteration · Connect 2 hydration stations to electricity (replace in kind).
- Issued Jul 6, 2026
Addition and/or Alteration · Connect 2 hydration stations to electricity (replace in kind).
- Issued Jul 6, 2026
Addition and/or Alteration · Connect 1 hydration stations to electricity (replace in kind).
- Issued Jul 6, 2026
Addition and/or Alteration · Connect 1 hydration stations to electricity (replace in kind).
- Issued Jul 2, 2026
1 units
Addition and/or Alteration · FOR EXTERIOR WORK TO INCLUDE STRUCTURAL UPGRADE TO AN EXISTING STRUCTURE. **ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**EXTERIOR WORK ONLY**
- Issued Jul 1, 2026
Alterations · 2 Storm water connections to street and installation of 2 new 8" curb traps and laterals discharging from a subsurface stormwater basin. Work inside the site is part of the site work permit and not in the plumbing scope of the project. SP-2026-000547 is the permit for the project.
- Issued Jun 16, 2026
Addition and/or Alteration · Low voltage CCTV wire system* -Installation of interior telecommunication wiring -(1) 30amp twist lock for CCTV system. -Installing OM3 6 strand fiber. -Running armored Cat6 above ceiling tiles using J hooks. Materials: Armored cat6 1000ft OM3 6 strand fiber 30amp twist lock outlet 10/3 MC wire Double pole 30 amp Breaker.
- Issued Jun 11, 2026
Addition and/or Alteration · replace lights and receptacles as per submitted drawings PER APPROVED DRAWINGS-2017 NEC.
- Issued Jun 10, 2026
Alterations · INSTALL OF NEW BOOSTER PUMP AND BACKFLOW PREVENTER
- Issued Jun 9, 2026
General Earth Disturbance ONLY · For the site work for a new playground and a subsurface stormwater basin as per approved plans.
- Issued Jun 5, 2026
Addition and/or Alteration · Furnish and install new lighting fixtures and associated hardware. Power to new rooftop units are included. No new fire alarm devices. Power to new fence.
- Issued Jun 5, 2026
Tank Install/Removal · FOR THE REMOVAL OF ONE (1) 4,000 GALLON ABOVE GROUND TANK. ALL WORK TO BE DONE IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS, PENNSYLVANIA D.E.P. REGULATIONS, ALL APPLICABLE CODES, NFPA 30 AND NFPA 31.
- Issued Jun 4, 2026
Alterations · We will be removing 2 existing water fountains and replacing them with 2 new filtered water fountains in same location. No piping or rough in work required, just fixture replacement.
- Issued Jun 2, 2026
Alterations · We will be removing 2 existing water fountains and replacing them with 2 new filtered water fountains in same location. **WITHOUT PIPING**
- Issued Jun 1, 2026
Addition and/or Alteration · Installation of low-voltage telecommunications CCTV System -Installation of interior telecommunication wiring -Installing OM3 6 strand fiber. -Running armored Cat6 above ceiling tiles using J hooks.
- Issued May 22, 2026
Addition and/or Alterations · FOR A MECHANICAL SYSTEM UPGRADE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.**
- Issued May 22, 2026
1 units
Addition and/or Alteration · INTERIOR ALTERATION TO PARTIAL BASEMENT OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 21, 2026
Alterations · We will be removing 4 existing water fountains and replacing them with 4 new filtered water fountains in same location. **WITHOUT PIPING**
- Issued May 21, 2026
Alterations · We will be removing 2 existing water fountains and replacing them with 2 new filtered water fountains in same location. *WITHOUT PIPING*
- Issued May 21, 2026
Alterations · We will be removing 1 existing water fountain and replacing with 1 new filtered water fountain in same location. No piping or rough in work required, just fixture replacement.
- Issued May 21, 2026
Alterations · We will be removing 1 existing water fountain and replacing with 1 new filtered water fountains in same location. **WITHOUT PIPING**
- Issued May 21, 2026
Alterations · We will be removing 2 existing water fountains and replacing them with 2 new filtered water fountains in same location. **WITHOUT PIPING**
- Issued May 21, 2026
Alterations · We will be removing 2 existing water fountains and replacing them with 2 new filtered water fountains in same location. *WITHOUT PIPING*
- Issued May 21, 2026
Addition and/or Alteration · (1) smoke and (1) pull station to be removed from the existing EST2 panel and added to the new FX(Kidde) system in place in the IT room as per 2016 NFPA 72. Includes programming and testing of devices. CAD will wire and install and remove the existing EST2 panel.
- Issued May 1, 2026
Addition and/or Alteration · Providing power to new scoreboard installation as per 2017 NEC.
- Issued May 1, 2026
Temporary Tents and Canopies · ASSEMBLY USE TENT - LAWFUL OCCUPANCY SHALL BE AS POSTED - REMOVAL DATE ELECTRICAL PERMIT REQUIRED, UNLESS POWER IS PROVIDED THROUGH EXISTING EXTERIOR GROUND FAULT PROTECTED RECEPTACLES AND POWER CORDS ARE RATED EXTRA HEAVY DUTY WITH U. L. LABEL STATING SUCH RATING. NO COOKING OR HEATING PERMITTED WITH THIS APPROVAL. Streets Department permit is required for street closure prior to the start work if applicable.
- Issued Apr 30, 2026
Addition and/or Alteration · CMD will install cameras throughout the school.
- Issued Apr 28, 2026
Tank Install/Removal · FOR THE REMOVAL OF TWO (2) 275 GALLON ABOVE-GROUND STORAGE TANKS (AST). ALL WORK TO BE DONE IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS, PENNSYLVANIA D.E.P. REGULATIONS, ALL APPLICABLE CODES, NFPA 30 AND NFPA 31.
- Issued Apr 22, 2026
1 units
Addition and/or Alteration · FOR THE ERECTION OF A MECHANICAL ENCLOSURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Apr 21, 2026
New construction, addition, GFA change · FOR THE ERECTION OF A CHAINLINK ENCLOSURE. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS
- Issued Apr 13, 2026
1 units
Addition and/or Alteration · INTERIOR ALTERATION TO AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING & FIRE SUPPRESSION WORK**
- Issued Apr 7, 2026
Addition and/or Alteration · Low voltage CCTV wire system* -Installation of interior telecommunication wiring -(1) 30amp twist lock for CCTV system. -Installing OM3 6 strand fiber. -Running armored Cat6 above ceiling tiles using J hooks. Materials: Armored cat6 1000ft OM3 6 strand fiber 30amp twist lock outlet 10/3 MC wire Double pole 30 amp Breaker.
- Issued Apr 7, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2025-000492
- Issued Mar 30, 2026
Alterations · Remove water fountain and replace with new water fountain in same location (2). *WITHOUT PIPING*
- Issued Mar 20, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (64) sprinklers to accommodate interior alterations
- Issued Mar 19, 2026
Addition and/or Alterations · INSTALLATION OF NEW 4" AMES COLT 200 BACKFLOW PREVENTION ASSEMBLY ON EXISTING FIRE SERVICE LINE FOR AN EXISTING NFPA 13 SPRINKLER SYSTEM AS PER APPROVED PLANS AND DOCUMENTATION.
- Issued Mar 18, 2026
Sign · FOR THE INSTALLATION OF ONE (1) STATICALLY ILLUMINATED ACCESSORY DOUBLE-SIDED FREESTANDING SIGN **SEPARATE PERMIT REQUIRED FOR ELECTRICAL WORK**
- Issued Mar 12, 2026
Addition and/or Alteration · Installation of low-voltage telecommunications CCTV System -Installation of interior telecommunication wiring -Installing OM3 6 strand fiber. -Running armored Cat6 above ceiling tiles using J hooks. NO PENETRATIONS TO FIRE RATED ASSEMBLIES.
- Issued Mar 6, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (66) sprinklers to accommodate interior alterations
- Issued Mar 3, 2026
Addition and/or Alteration · Low voltage CCTV wire system* -Installation of interior telecommunication wiring -(1) 30amp twist lock for CCTV system. -Installing OM3 6 strand fiber. -Running armored Cat6 above ceiling tiles using J hooks. Materials: Armored cat6 1000ft OM3 6 strand fiber 30amp twist lock outlet 10/3 MC wire Double pole 30-amp Breaker.
- Issued Feb 27, 2026
Certificate of Occupancy (CO) (may include LO) · Certificate of Occupancy for an existing school. Shall comply with the Philadelphia Fire Code and Property Maintenance Code.
- Issued Feb 26, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A NEW 6" BACKFLOW PREVENTION DEVICE. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Feb 24, 2026
Addition and/or Alteration · Remove existing 110V receptacle and install GFCI receptacle in its place. install wire mold and box where needed for new Hydration Station
- Issued Feb 22, 2026
Addition and/or Alteration · remove existing 110v receptacle and install GFCI receptacle in its place. install wire mold and box where needed for new Hydration station
- Issued Feb 22, 2026
Addition and/or Alteration · remove existing 110v receptacle and install GFCI receptacle in its place. install wire mold and box where needed for new Hydration Station
- Issued Feb 22, 2026
Addition and/or Alteration · remove existing 110v receptacle and install GFCI receptacle in its place. install wire mold and box where needed for new Hydration station
- Issued Feb 22, 2026
Addition and/or Alteration · remove existing 110v receptacle and install GFCI in its place. Install wire mold and box where needed for new Hydration station
- Issued Feb 22, 2026
Addition and/or Alteration · remove existing 110v receptacle and install GFCI receptacle in its place. install wire mold and box where needed for new Hydration station
- Issued Feb 20, 2026
General Earth Disturbance ONLY · FOR SELECT SITE CLEARING AND THE INSTALLATION OF NEW LANDSCAPING/PAVEMENT ACCESSORY TO AN EXISTING PLAYGROUND, FOR THE ERECTION OF PLAY AREAS CONTAINING PLAY COMPONENTS DESIGNED AND CONSTRUCTED FOR CHILDREN AND LOCATED ON AN ACCESSIBLE ROUTE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Feb 19, 2026
Sign · For the erection of a new scoreboard accessory to an existing football field. **Separate permit required for any electrical work**
- Issued Feb 18, 2026
Addition and/or Alteration · remove existing 110v receptacle and install GFCI receptacle in its place. install wire mold and box where needed for new Hydration station
- Issued Feb 18, 2026
Addition and/or Alteration · Remove the existing 110v receptacle and install a GFCI receptacle in its place. install wire mold and box where needed for the new Hydration station
- Issued Feb 18, 2026
Addition and/or Alteration · remove existing 110v receptacle and install GFCI receptacle in its place install box and wire mold box where needed for new hydration station
- Issued Feb 16, 2026
Alterations · Remove 3 unfiltered water fountains and replace in same location with 3 filtered water fountains. *WITHOUT PIPING*
- Issued Feb 16, 2026
Alterations · Remove 1 water fountain and replace in same location with 1 new water fountain.
- Issued Feb 16, 2026
Alterations · Remove 5 unfiltered water fountains and replace in same location with 5 filtered water fountains **WITHOUT PIPING**
- Issued Feb 11, 2026
Addition and/or Alteration · *Low voltage CCTV Telcom wire system* -Installation of interior telecommunication wiring -(1) 30amp twist lock for CCTV system. -Installing OM3 6 strand fiber. -Running armored Cat6 above ceiling tiles using J hooks.
- Issued Feb 11, 2026
Addition and/or Alteration · Scope *Low voltage CCTV Telcom wire system* -Installation of interior telecommunication wiring -(1) 30amp twist lock for CCTV system. -Installing OM3 6 strand fiber. -Running armored Cat6 above ceiling tiles using J hooks.
- Issued Feb 6, 2026
1 units
Commercial Make Safe Permit · For (repair facade per engineer report) to resolve case CF-2024-056946. Abutting sidewalk must be closed with fencing a minimum of 6’ in height. Separate Streets Department permit required for sidewalk closure. A separate permit is required for any additional alterations that are not specifically addressed on case CF-2024-056946.
- Issued Feb 2, 2026
Addition and/or Alteration · Adding gfci receptacle to existing circuit for hydration stations. Changing regular 120v receptacle to 120V GFCI for use by the new hydration station extend with wire mold in location where needed
- Issued Jan 30, 2026
Addition and/or Alteration · “Provide a new circuit (2#12 + 1#12GND - 3/4"C and 20/1 lockable circuit breaker) and final connection to the new statically illuminated sign board. Relocate existing conduit/wiring for the CCTV camera as required for installation of the new statically illuminated sign board. Perform Load monitoring at existing electrical equipment to confirm adequate capacity for the new load.” per GP-2025-011250
- Issued Jan 30, 2026
Alterations · AMENDED 05.18.26 TO REDUCE # OF FOUNTAINS FROM 18 TO 14 FOUNTAINS. *WITHOUT PIPING.* Remove 18 water fountains, and replace in place, with 18 new water fountains.
- Issued Jan 30, 2026
Alterations · Remove 1 water fountain and replace with a water fountain in same place.
- Issued Jan 30, 2026
Alterations · Remove 1 water fountain and replace with a new water fountain.
- Issued Jan 23, 2026
Addition and/or Alteration · Upgrade fire alarm devices for elevator modernization as per 2016 NFPA 72 and per approved plans.
- Issued Jan 14, 2026
Signs (Accessory / Non-Accessory) · FOR THE INSTALLATION OF ONE (1) ACCESSORY DOUBLE FACED FREE-STANDING SIGN WITH DIGITAL ANIMATED ILLIMINATION AND STATIC ILLUMINATION.
- Issued Jan 14, 2026
Sign · The work includes the installation of a 5'x8' (statically illuminated only) sign board near the main entrance of the building.
- Issued Jan 6, 2026
Addition and/or Alteration · Furnish and install a new fire alarm system, including the removal of the old system. Includes the installation of conduit and wiring for a new fire alarm system. In accordance with NFPA 72 2016 & The Philadelphia Fire Code 2018
- Issued Dec 30, 2025
Shelter/Platform · SHELTER PLATFORM PERMIT - Erection of a sidewalk shelter platform as per Engineered Plans. Streets Department permit is required for sidewalk closure prior to the start work. cornice repairs due deterioration
- Issued Dec 10, 2025
Addition and/or Alteration · Removal of Legacy CCTV Camera System. Work Includes removal of wall mounted Security cameras, Desktop Computers, TV Monitors and IT Data Rack mounted computer recording components. - CCTV Camera Body only tobe removed from existing mount. - Camera Mount to remain. - Remaining Low Voltage Data Cabling shall remain and safe off in place for owners' future use. - Fire Rated Cover plate to be installed when necessary. - Computer equipment to be powered off and unplugged from wall standard pow
Violations
2456 entries
- Unsafe Feb 26, 2026ACTIVE
Unsafe structure designation
- Unsafe Jun 5, 2024ACTIVE
Unsafe structure designation
- Unsafe Jun 3, 2024ACTIVE
Unsafe structure designation
- Unsafe Oct 2, 2019ACTIVE
Unsafe structure designation
- Unsafe Oct 25, 2017ACTIVE
Unsafe structure designation
- Violation Oct 15, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Oct 13, 2026OPEN
OCCUPIED W/O FINAL APPROVAL
- Violation Oct 13, 2026OPEN
FAILURE TO PERFORM SPECIAL INSPECTIONS
- Violation Oct 13, 2026OPEN
ALTER INTERIOR PORTION
- Violation Oct 13, 2026OPEN
HVAC SYSTEM
- Violation Oct 13, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Oct 1, 2026OPEN
PERIODIC TESTING
- Violation Oct 1, 2026OPEN
FAILURE TO PROVIDE REPORTS
- Violation Sep 2, 2026OPEN
ALTER EXTERIOR PORTION
- Violation Aug 6, 2026OPEN
ARCHITECT/ENGINEER SERVICES
- Violation Jul 29, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jul 22, 2026OPEN
RECORD KEEPING
- Violation Jul 22, 2026OPEN
RELIABILITY
- Violation Jul 22, 2026OPEN
FIRE EXTINGUISHER HANGERS & BRACKETS
- Violation Jul 22, 2026OPEN
EXIT DOORS
- Violation Jul 22, 2026OPEN
EXIT SIGN ILLUMINATION
- Violation Jul 22, 2026OPEN
EQUIPMENT ROOMS
- Violation Jul 22, 2026OPEN
PERIODIC TESTING
- Violation Jul 22, 2026OPEN
LOCKDOWN PLAN CONTENTS
- Violation Jul 22, 2026OPEN
FIRE EXTINGUISHER UNOBSTRUCTED & UNOBSCURED
- Violation Jul 22, 2026OPEN
FIRE EXTINGUISHERS
- Violation Jul 22, 2026OPEN
GROUP E OCCUPANCIES
- Violation Jul 20, 2026OPEN
STAIRWAYS IN THE MEANS OF EGRESS
- Violation Jul 20, 2026OPEN
PERIODIC TESTING
- Violation Jul 20, 2026OPEN
FDC ACCESS
- Violation Jul 20, 2026OPEN
RECORD KEEPING
- Violation Jul 20, 2026OPEN
ACCEPTANCE CRITERIA & REPORTS
- Violation Jul 20, 2026OPEN
EQUIPMENT ROOMS
- Violation Jul 20, 2026OPEN
LOCKDOWN PLAN CONTENTS
- Violation Jul 20, 2026OPEN
ACCEPTANCE CRITERIA & REPORTS
- Violation Jul 20, 2026OPEN
HOLD-OPEN DEVICES & CLOSERS
- Violation Jul 20, 2026OPEN
AVAILABILITY
- Violation Jul 20, 2026OPEN
EXIT DOORS
- Violation Jul 20, 2026OPEN
GROUP E OCCUPANCIES
- Violation Jul 20, 2026OPEN
LABELING
- Violation Jul 20, 2026OPEN
EXTENSION CORDS
- Violation Jul 20, 2026OPEN
UTILITY IDENTIFICATION
- Violation Jul 20, 2026OPEN
STAIRWAY ACCESS TO ROOF
- Violation Jul 20, 2026OPEN
BOLT LOCKS
- Violation Jul 20, 2026OPEN
FDC SIGNAGE REQUIRED
- Violation Jul 20, 2026OPEN
FDC LOCKING CAPS
- Violation Jul 16, 2026OPEN
STAIRWAY ROOF ACCESS
- Violation Jul 16, 2026OPEN
EMERGENCY SIGNS
- Violation Jul 16, 2026OPEN
FIRE EXTINGUISHERS
- Violation Jul 16, 2026OPEN
COMMERCIAL SYSTEM TEST
- Violation Jul 16, 2026OPEN
ACCEPTANCE CRITERIA & REPORTS
- Violation Jul 16, 2026OPEN
FUELED EQUIPMENT
- Violation Jul 16, 2026OPEN
COMMERCIAL KITCHEN HOOD RECORDS
- Violation Jul 16, 2026OPEN
RECORDS
- Violation Jul 16, 2026OPEN
CEILING CLEARANCE
- Violation Jul 13, 2026OPEN
COMMERCIAL SYSTEM TEST
- Violation Jul 13, 2026OPEN
FIRE EXTINGUISHER HANGERS & BRACKETS
- Violation Jul 13, 2026OPEN
FIRE EXTINGUISHER SIZE & DISTRIBUTION
- Violation Jul 13, 2026OPEN
GROUP E OCCUPANCIES
- Violation Jul 13, 2026OPEN
POSTING OF OCCUPANT LOAD
- Violation Jul 13, 2026OPEN
RECORD KEEPING
- Violation Jul 13, 2026OPEN
FIRE EXTINGUISHERS
- Violation Jul 10, 2026OPEN
PERIODIC TESTING
- Violation Jul 10, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Jul 9, 2026OPEN
PERIODIC TESTING
- Violation Jul 9, 2026OPEN
EXIT DOORS
- Violation Jul 9, 2026OPEN
FOOD - LARGE ESTABLISHMENT LICENSE
- Violation Jul 9, 2026OPEN
UNAPPROVED CONDITIONS
- Violation Jul 9, 2026OPEN
STORAGE
- Violation Jul 8, 2026OPEN
POSTING OF OCCUPANT LOAD
- Violation Jul 8, 2026OPEN
FIRE EXTINGUISHERS
- Violation Jul 8, 2026OPEN
COMMERCIAL SYSTEM TEST
- Violation Jul 8, 2026OPEN
EXIT DOORS
- Violation Jul 8, 2026OPEN
STORAGE
- Violation Jul 8, 2026OPEN
FIRE EXTINGUISHERS
- Violation Jul 8, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Jul 8, 2026OPEN
WORKING SPACE & CLEARANCE
- Violation Jul 8, 2026OPEN
FIRE EXTINGUISHER UNOBSTRUCTED & UNOBSCURED
- Violation Jul 6, 2026OPEN
OCCUPANT LOAD SIGN
- Violation Jul 6, 2026OPEN
FUELED EQUIPMENT
- Violation Jul 6, 2026OPEN
STORAGE
- Violation Jul 6, 2026OPEN
FIRE EXTINGUISHERS
- Violation Jul 6, 2026OPEN
COMMERCIAL COOKING SYSTEMS
- Violation Jul 6, 2026OPEN
INSPECTION, TESTING AND MAINTENANCE
- Violation Jul 6, 2026OPEN
GROUP E OCCUPANCIES
- Violation Jul 6, 2026OPEN
EXIT SIGNS
- Violation Jul 6, 2026OPEN
LOCKDOWN PLAN CONTENTS
- Violation Jul 6, 2026OPEN
RECORD KEEPING
- Violation Jul 6, 2026OPEN
PERIODIC TESTING
- Violation Jul 2, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Jul 2, 2026OPEN
EQUIPMENT ROOMS
- Violation Jul 2, 2026OPEN
RECORDS
- Violation Jul 2, 2026OPEN
PERIODIC TESTING
- Violation Jul 2, 2026OPEN
CONTAINER INDOOR STORAGE PROHIBITED
- Violation Jul 2, 2026OPEN
STAIRS AND WALKING SURFACES
- Violation Jul 2, 2026OPEN
FIRE EXTINGUISHERS
- Violation Jul 2, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Jul 2, 2026OPEN
AVAILABILITY
- Violation Jul 2, 2026OPEN
OPENING PROTECTIVES
- Violation Jul 2, 2026OPEN
UNAPPROVED CONDITIONS
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated October 22, 2026.