Entity File · The Public Record
Owner of record
Septa
50 permits · 21 violations
- Records on file
- 71
Permits (as owner)
48 entries
- Issued Jul 2, 2026
1 units
Addition and/or Alteration · FOR THE ERECTION OF AN ELEVATOR WITHIN AN EXISTING ELEVATOR SHAFTWAY BETWEEN THE STREET LEVEL AND CONCOURSE LEVELS FOR ACCESSIBLE ACCESS TO THE EXISTING PUBLIC TRANSIT SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK. **NO EXCAVATION WITH THIS PERMIT** **ELEVATOR PERMIT FROM THE COMMONWEALTH OF PENNSYLVANIA IS REQUIRED**
- Issued Jul 1, 2026
New Construction · ALTERATIONS TO NFPA 13 SPRINKLER SYSTEM FOR EXISTING BUS DEPOT FOR REMOVAL AND REPLACEMENT OF EXISTING DRY PIPE SYSTEMS AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Jun 2, 2026
Addition and/or Alteration · Installation of (2) motorized dampers (Furnished by 2A Mechanical).
- Issued Jun 1, 2026
1 units
Addition and/or Alteration · FOR STRUCTURAL ALTERATIONS TO ROOF PER APPROVED PLANS.
- Issued Jun 1, 2026
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued May 18, 2026
Addition and/or Alteration · Remodel of bathroom in 7th fl apt, replacement of fixtures, installation of 3 switches, 3 outlets, 2 wall sconces, 8 recessed lights, 1 ventilation fan
- Issued May 12, 2026
Change of Use · Vacant; Residential - Household Living - Single-Family
- Issued May 12, 2026
Change of Use · Vacant; Residential - Household Living - Single-Family
- Issued May 12, 2026
Change of Use · Vacant; Residential - Household Living - Single-Family
- Issued May 12, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO RENOVATE THE BATHROOM IN UNIT #726 ON 7TH FL. OF AN EXISTING BUILDING PER APPROVED PLANS. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS AND PROVIDE FINISHES/ FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 1, 2026
Addition and/or Alteration · Disconnect existing electrical feed to the existing paint booth. Re-connect the existing electrical, using WIRE MOLD, to feed to the new paint booth once installed.
- Issued Apr 27, 2026
Addition and/or Alteration · Remove, salvage, and reinstall two (2) existing light fixtures, cameras, and life safety equipment in the area between rooms. Furnish and install two (2) new electrical panels, one (1) 400-amp, 36-circuit panel and one (1) 100-amp, 24-circuit panel, including feeders and circuit breakers. Remove existing HVAC equipment feeders and conduit, and install new feeders and conduit for HVAC and MSA equipment. Furnish and install MSA gas detection system, including monitors, alarm towers, controller, a
- Issued Apr 27, 2026
Change of Use · Public, Civic, and Institutional - Libraries and Cultural Exhibits
- Issued Apr 27, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE NEW ROLL UP GATES, INFILLS, REPAIRS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.
- Issued Apr 16, 2026
1 units
Addition and/or Alteration · FOR THE REPACEMENT OF EXISTING ROOF AND STRUCTURAL ROOF DECK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Apr 15, 2026
Addition and/or Alteration · New 400-amp 277/480 Panel - Install VFD's for Chillers 1- 7, Spray Pumps 1 & 2, CWP 1&2 & Pump # 7 - Dedicated Circuit and Receptacles with Heat Trace Cabling as per 2017 NEC.
- Issued Apr 1, 2026
Addition and/or Alterations · FOR THE REPLACEMENT OF COOLING TOWERS.
- Issued Apr 1, 2026
1 units
Addition and/or Alteration · FOR THE ERECTION OF STEEL DUNNAGE AS PER APPROVED PLANS.
- Issued Apr 1, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2026-001187
- Issued Mar 7, 2026
Tank Install/Removal · **TANK REMOVAL PERMIT** FOR THE REMOVAL OF ONE (1) 4,000 GALLON ABOVE-GROUND HEATING OIL STORAGE TANK LOCATED IN A CONCRETE VAULT. REMOVE ANY PRODUCT/WATER FROM TANK AND CLEAN TANK. ALL WORK TO BE COMPLETED IN ACCORDANCE WITH PA DEP TANK REMOVAL GUIDELINES. PROVIDE THE CITY OF PHILADELPHIA WITH A TANK CLOSURE REPORT.
- Issued Mar 6, 2026
Addition and/or Alteration · Install new panel boards, new lighting fixtures, and distribution systems as per 2017 NEC. Install fire alarm system as per 2016 NFPA 72.
- Issued Mar 3, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATION TO INCLUDE RE-ROOFING, CONCRETE REPAIRS, AND STRUCTURAL WORK AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR MEP WORK. *ASBESTOS ABATEMENT REQUIRED PRIOR TO START OF WORK.*
- Issued Mar 3, 2026
1 units
Addition and/or Alteration · LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING BUS DEPOT TO INCLUDE ROOF REPLACEMENT AND INTERIOR WORK AS PER APPROVED PLANS. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**
- Issued Feb 27, 2026
New Construction · Electrical Permit for combo SP-2023-000100
- Issued Feb 6, 2026
Addition and/or Alterations · For alteration to the existing HVAC system as per approved plans.
- Issued Feb 5, 2026
Addition and/or Alterations · FOR THE REPLACEMENT OF SEVEN (7) ROOFTOP COOLING TOWERS AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEE BUILDING PERMIT CP-2025-006422 FOR ASSOCIATED STRUCTURAL WORK.
- Issued Feb 4, 2026
1 units
Addition and/or Alteration · FOR THE REPLACEMENT OF EXISTING COOLING TOWNER ON THE ROOFTOP. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, & PLUMBING WORK**
- Issued Jan 26, 2026
Addition and/or Alterations · FOR A FIRE PUMP INSTALLATION AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Jan 8, 2026
EZ Interior Non-Load-Bearing Wall Demo. · EZ INTERIOR NON-LOAD-BEARING WALL DEMOLITION - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans. Structural alteration or repair is expressly PROHIBITED under this permit. Prohibited structural work includes but not limited to any modification to exterior walls, party wall, floor/roof framing and foundations, including underpinning, excavation and removal of fou
- Issued Dec 16, 2025
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Dec 3, 2025
Addition and/or Alterations · To install (27) sprinklers, replace manual dry standpipes, and install new backflow preventer per NFPA 13&14 as per approved plans.
- Issued Nov 5, 2025
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2025-003984
- Issued Nov 3, 2025
1 units
Addition and/or Alteration · LEVEL II STRUCTURAL ALTERATIONS (NO CHANGE OF OCCUPANCY) TO EXISTING GARAGE BUILDING FOR INSTALLATION OF MECHANICAL EQUIPMENT AS PER APPROVED PLANS. *2018 IEBC REVIEW*
- Issued Oct 22, 2025
Addition and/or Alteration · Provision of all power to elevator equipment and appurtenances, elevator car and all appurtenances, receptacles, new feeders, and breakers as required. Provision of all power to equipment in elevator machine room, power to new mechanical equipment (split systems, pumps etc.), new pit receptacles and lighting, switching, new lighting to elevator machine room. Emergency telephone line , provision and wiring of new fire alarm devices, panel, and power to controller(s) for CCTV. Provision of securit
- Issued Oct 22, 2025
1 units
Addition and/or Alteration · FOR LEVEL III ALTERATIONS TO AN EXISTING SEPTA STATION. ALTERATIONS TO INCLUDE THE NEW STAIRS, ELEVATORS, DOORS, TURNSTILES, STRUCTURAL REPAIRS, FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Oct 22, 2025
1 units
Addition and/or Alteration · FOR THE REPLACEMENT OF ELEVATOR CAB AND ALTERATION TO THE MACHINE ROOM OF ELEVATOR 1. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL WORK**
- Issued Sep 29, 2025
Addition and/or Alteration · INSTALL (2) 15KV SWITCHES, (2) 300 KVA TRANSFORMERS, PANELS, FUSED DISCONNECT SWITCHES, TRANSFORMERS, FEEDERS, TRANSFER SWITCHES & EMERGENCY POWER MG SET. INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES SENSORS & WIRELESS NETWORK LIGHTING CONTROL SYSTEM. INSTALL RECEPTACLES & POWER FOR THE MISCELLANEOUS EQUIPMENT. PROVIDE POWER FOR THE MECHANICAL, HVAC & ELEVATOR EQUIPMENT. INSTALL THE LOW VOLTAGE WIRING & EQUIPMENT FOR THE SECURITY, COMMUNICATION & DATA/ COM SYSTEMS. ALL WORK IN ACCORDANCE WITH T
- Issued Sep 19, 2025
Alterations · Renovation of existing SEPTA 34th Street Station located at the intersection of 34th and Market Street. Plumbing related work includes new street level elevator headhouse drainpipe (connected to existing sewer), new elevator pit sump pumps, cleanout of existing trench drains, area drains, and existing drain lines, relocation of existing drainpipes to accommodate misc. renovation work, new restroom fixtures, and new maintenance mop sinks. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVE
- Issued Sep 17, 2025
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Sep 16, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (411) SPRINKLER HEADS ON THE GROUND FLOOR / MEZZANINE LEVEL AS PER NFPA 13 AND LOCAL CODE
- Issued Sep 3, 2025
1 units
Addition and/or Alteration · FOR THE PARTIAL REMOVAL / DEMO OF OLD CEILING AND FOR THE INSTALLATION OF NEW CEILING AS PER APPROVED PLANS. FOR USE AS PREVIOUSLY APPROVED. *********SEPARATE PERMITS FOR ANY OTHER WORK. *******************************
- Issued Aug 12, 2025
Alterations · Installation of two (2) new 18" DIP sanitary sewer connections to existing 24" vitrified clay main, including WYE fittings.
- Issued Jul 30, 2025
Alterations · Remove and replace (20) plumbing fixtures, (8) lavatories, (9) water closets and (3) urinals, connecting to existing piping.
- Issued Jul 28, 2025
Addition and/or Alteration · Install 43 Receptacles, 2 Floor Boxes, 20 Furniture Feeds and Clean and Relamp. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC **NO FIRE ALARM ON THIS PERMIT**
Built (as contractor)
2 entries
- Issued Jun 16, 2026
New construction, addition, GFA change · FOR THE ERECTION OF AN ADDITION TO AN EXISTING TRANSIT STATION. SIZE AND LOCATION AS SHOWN IN PLANS. **NO SIGNS APPROVED ON THIS APPLICATION.**
Violations
21 entries
- Violation Jul 6, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jul 6, 2026OPEN
EXTERIOR AREA SANITATION
- Violation Jul 6, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Apr 16, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Mar 5, 2026OPEN
BENCHMARKING LATE
- Violation Feb 2, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Sep 19, 2025OPEN
ENCROACHING TREES
- Violation Sep 9, 2025OPEN
PLUMBING SYSTEMS- STORM DRAINAGE
- Violation Sep 12, 2024OPEN
FIRE SAFETY PLANS
- Violation Sep 12, 2024OPEN
UTILITY IDENTIFICATION
- Violation Sep 12, 2024OPEN
EMERGENCY EVAC DRILL FREQUENCY
- Violation Sep 12, 2024OPEN
SECURING COMPRESSED CYLINDERS
- Violation Sep 12, 2024OPEN
DOOR HARDWARE
- Violation Sep 12, 2024OPEN
SPONTANEOUS IGNITION
- Violation Sep 12, 2024OPEN
STORAGE
- Violation Sep 12, 2024OPEN
OBSTRUCTIONS
- Violation Sep 12, 2024OPEN
FDC LOCKING CAPS
- Violation Sep 12, 2024OPEN
FUELED EQUIPMENT
- Violation Sep 12, 2024OPEN
HIGH-RISE BUILDING
- Violation Sep 12, 2024OPEN
DAMPER CERTIFICATION REPORT
- Violation Sep 12, 2024OPEN
SMOKE CONTROL SYSTEM RECORDS
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.