Entity File · The Public Record
Owner of record
Servants Of Relief For, Incurable Cancer
13 permits
- Records on file
- 13
Permits (as owner)
13 entries
- Issued Jun 29, 2026
New Construction · TO INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 4" MAIN FIRE SERVICE LINE WITH 4" AMES COLT 200 BACKFLOW PREVENTION ASSEMBLY AND FIRE SYSTEM TO INCLUDE THE INSTALLATION OF STANDPIPES IN EXIT STAIRWAYS, STANDPIPES TO BE INTERCONNECTED PER NFPA 14 AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Jun 9, 2026
Certificate of Occupancy (CO) (may include LO) · CERTIFICATE OF OCCUPANCY FOR EXISTING DETACHED BUILDING. NO ALTERATIONS ALLOWED UNDER THIS PERMIT. BUILDING TO COMPLY WITH 2018 FIRE AND PROPERTY MAINTENANCE CODES.
- Issued Mar 25, 2026
New Construction or Additions · INSTALL SANITARY AND STORM CT, FAI, MD & 2" WDP.
- Issued Mar 19, 2026
New Construction or Additions · NEW CONSTRUCTION OF MIXED USE BUILDING WITH B OCCUPACY SPACES AND APARTMENTS. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION FOR B-USE FIXTURES AND PIPING LOCATED WITHIN B-USE SPACES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Mar 17, 2026
New Construction · FOR INSTALLATION OF HVAC APPLICANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Feb 18, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install 4.0/4.0/4.0/4.0 gallon Captive Aire kitchen FSS
- Issued Sep 29, 2025
Minor Demolition · FOR THE COMPLETE DEMOLITION OF MULTIPLE ONE (1) STORY INTERCONNECTED MASONRY STRUCTURES. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY BOTH MECHANICAL AND HAND TOOL METHODS (SEE PLAN FOR EXTENT OF HAND AND MECHANICAL DEMO) . PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQ
- Issued Sep 3, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. *CP-2025-001716* RELOCATE (10) SPRINKLER HEADS
- Issued Aug 13, 2025
Addition and/or Alteration · Furnish and install twenty-eight (28) Category 6 plenum cables from Server Room to various locations throughout building. Average cable pull is 175 feet. Furnish only banana cable for security vendor to install devices on doors. Eleven total. Average cable pull is 175 feet.
- Issued Jul 25, 2025
Full Demolition · FOR COMPLETE DEMOLITION OF ALL STRUCTURES ON LOT. SIZE AND LOCATION AS SHOWN IN PLAN.
- Issued Jul 23, 2025
45 units
New Construction · NEW CONSTRUCTION OF A FOUR (4) STORY BUILDING FOR USE AS A BUSINESS & PROFESSIONAL OFFICE AND FOURTY-FIVE (45) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. AMENDED PERMIT REQUIRED TO SUBMIT TRUSS DRAWINGS PRIOR TO INSTALLATION. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.