15 permits
- Records on file
- 15
Built (as contractor)
15 entries
- Issued Jun 11, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install (3) 9K BTU mini splits, (1) 12K BTU mini split, and a 48K BTU condenser.
- Issued Jun 11, 2026
Addition and/or Alteration · Install dedicated circuits throughout property Install recessed lighting throughout property Install appliance circuits throughout property Install GFCI receptacles where required Install 100 AMP electrical service Rewire property
- Issued May 14, 2026
Addition and/or Alteration · Install 100 amp feed to detached garage 6 gfi proted circuit breakers 12 receptacles 15 recessed light fixtures 4 exterior light fixtures 5 light switches 100 amp subpanel
- Issued Apr 29, 2026
Addition and/or Alteration · Install 400 a 3 phase disconnect Install 4 inch PVC Install 112 kva transformer Install mc cables Install 150a 480 v disconnect Installation shall comply with 2017 NEC.
- Issued Apr 13, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Install 2 condensers on exterior of property; one is 48,000 BTU/3.5 ton and the other is 24,000 BTU/2 ton both located on Bridge st side of property under bay window Install mini split unit on interior second floor I
- Issued Feb 23, 2026
Addition and/or Alteration · Rewire electric throughout to current NEC 2017 200 amp service Adequate receptacles throughout to code 1 lighting location in each room Arc fault and gfi protection where required Update grounding and bonding Hard wired smoke detectors where required Electrical permit and inspection required
- Issued Jan 14, 2026
Addition and/or Alteration · Install 20 amp service receptacle on dedicated line
- Issued Jan 5, 2026
Addition and/or Alteration · Install one 30 kVA transformer, two 18 kW Generac generators, two new emergency panels, and two automatic transfer switches (ATS). All work to be done according to the 2017 NEC and per approved plans.
- Issued Dec 23, 2025
Addition and/or Alteration · Replace devices, add smoke/CO2 detector with sounder base in patient rooms, installation of 2 remote annunciator panels, and installation of a/v devices in ADA rooms as per 2016 NFPA 72.
- Issued Nov 24, 2025
Addition and/or Alteration · For the removal and reconstruction of the first floor rear section of first floor. For interior and exterior alterations to an existing semi-detached single-family dwelling per plans. Separate permits are required for all associated Mechanical, Electrical, and Plumbing work.
- Issued Nov 20, 2025
Addition and/or Alteration · For alterations to a Single Family Dwelling Property as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly PROHIBITED under this permit. Prohibited structural work includes but not limited to any modification to exterior walls, party wall, floor/roof framing and foundations, including underpinning, excavation and removal of foundation slab. *** NO WORK MAY BE PERFORMED IN
- Issued Nov 20, 2025
Addition and/or Alteration · Install 400 amp service with grounding, wire trough, 4-gang meter bank, (4) disconnects, riser conduit and feeders as per 2017 NEC.
- Issued Nov 13, 2025
Addition and/or Alteration · Electrical Demo Install Lighting per plan Reroute circuits ,install receptacles, Install spec'd circuits .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **NO FIRE ALARM ON THIS PERMIT**
- Issued Nov 10, 2025
Addition and/or Alteration · Repair outlets with reverse polarity, put in junction boxes for all open spices. Install new 100 amp service from service drop meter and electrical panel.
- Issued Oct 24, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.