Entity File · The Public Record
Company / LLC
Shelly Electric CO INC
38 permits
- Records on file
- 38
Built (as contractor)
38 entries
- Issued Jul 8, 2026
Addition and/or Alteration · Install one (1) 400-amp subpanel from the existing electrical service, including all required feeders and overcurrent protection. From the new subpanel, install dedicated branch circuits to supply power for six (6) Level 2 electric vehicle (EV) chargers located in the parking lot. Provide all required conduit, conductors, disconnecting means and protective bollards. All work shall be performed in accordance with the 2017 NEC and per approved plans.
- Issued Jun 29, 2026
Addition and/or Alteration · Install feeder and panel Install level two EV chargers qty.6 *ALL WORK PER APPROVED PLANS*
- Issued Jun 29, 2026
Addition and/or Alteration · Install new panel and feeder Install level two EV charger and circuits qty. 6 ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS -2017 NEC.
- Issued Jun 25, 2026
Addition and/or Alteration · Install 6 EV level two chargers Install new panel and transformer Install conduit ,disconnects, and wire ,bollards for mechanical protection to be installed. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Jun 3, 2026
Addition and/or Alteration · Lighting, receptacles and fire alarm for electrical renovations to restrooms all work per approved plans.
- Issued Jun 1, 2026
Addition and/or Alteration · From the existing electrical service, install two (2) 400-amp subpanels, including all required feeders, overcurrent protection. From the subpanels, install dedicated branch circuits to supply power for twenty-two (22) Level 2 electric vehicle (EV) chargers located on the 4th and 5th levels of an existing parking garage. Work includes installation of conduit, conductors, disconnecting means, equipment connections. Provide and install protective bollards for the EV charging stations.
- Issued Jun 1, 2026
Addition and/or Alteration · Install level two EV charger all work per approved plans
- Issued Jun 1, 2026
Addition and/or Alteration · Install level three charger and feeder in parking lot. All work to be done according to the 2017 NEC and per approved plans.
- Issued May 20, 2026
Addition and/or Alteration · Install electric panel qty. 1, Install VFD qty. 2, Install duplex receptacles qty. 18, Install lighting and controls as per drawings, Install fire alarm devices. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued May 4, 2026
Addition and/or Alteration · Furnish and install additional fire alarm notification appliances, including four (4) strobe-only units and six (6) horn/strobe units. Work includes all required wiring, mounting, terminations, and connections to the existing fire alarm system. All devices shall be properly synchronized, interconnected, and tested to ensure compliant operation. All work shall be performed in accordance with 2016 NFPA 72, 2017 NEC and per approved plans.
- Issued May 1, 2026
Addition and/or Alteration · (1) New 400A 208V Panel, (1) New 150A 208V Panel. New Branch power to new Mechanical equipment as per 2017 NEC. (1) new Heat Detector and (1) New Carbon Monoxide Detector to tie into existing fire alarm system as per 2016 NFPA 72.
- Issued Apr 15, 2026
Addition and/or Alteration · Renovation to existing PET CT room. New Lighting, Receptacles, and New Circuiting to new Medical Equipment as per 2017 NEC. Install new fire alarm devices as per 2016 NFPA 72.
- Issued Apr 10, 2026
Addition and/or Alteration · FIRE ALARM: (3) Strobe; (2) Smoke Detector. As per NFPA 72. ELECTRICAL: (3) Connect to existing panels – add new breakers: (1) 70/3; (1) 30/2; (4) 20/2; (15) 20/1. New panel: (1) 6EMIT 70A MCB 30P. Lighting: (215) fixtures; (3) controls. Branch: (68) Duplex Receptacles; (22) Junction box & connection 20/1; (1) FCU & disconnect switch 30/2; (1) poke thru. Nurse call: (1) Master station; (37) Centrak devices; (1) Test existing. Security : (1) Card reader ; (1) strike; (1) door contact. T/D
- Issued Apr 10, 2026
Addition and/or Alteration · From an existing 200-amp electrical panel, install a 60-amp feeder to supply one (1) 60-amp subpanel, including all required overcurrent protection, grounding, bonding, and terminations. From the new subpanel, install two (2) branch circuits: one (1) dedicated circuit for equipment and one (1) circuit for additional alternates. All work shall be performed in accordance with the 2017 NEC and per approved plans.
- Issued Apr 9, 2026
Addition and/or Alteration · Install duplex receptacles qty. 27, Install GFI receptacles qty. 7, Exhaust fan power qty. 1, Water heater power qty. 1.,Install drain pump power qty. 1, Install furniture feed qty. 3, Install lighting and controls as per APPROVED DRAWINGS -2017 NEC.
- Issued Mar 5, 2026
Addition and/or Alteration · FIRE ALARM: (1) AV device. As per NFPA 72. ELECTRICAL: Lighting & controls: (18) fixtures, (16) switches. Branch: (19) receptacles; (1) furniture feed. Nurse call: (3) relocate pull station. T/D pathways: (9) Box & stub to ceiling (All cabling and equipment is by others). As per APPROVED DRAWINGS -2017 NEC.
- Issued Mar 2, 2026
Addition and/or Alteration · Install (3) Down lights, (1) 16ft. Linear, (3) Led 2X4 lay-in fixtures, (4) new switches, (8) Quad Receptacles, (3) Duplex Receptacles as per 2017 NEC. Relocate (2) existing fire alarm devices as per 2016 NFPA 72.
- Issued Feb 20, 2026
Addition and/or Alteration · FIRE ALARM: (9) Duct Smoke Detector; (9) Damper module; (9) Rem Test Station & Key switch; (9) Relay. As per 2016 NFPA 72. ELECTRICAL: (2) Connect to existing trough; (2) Enclosed CB: (1) 250/175; 250/200; (3) Integral Panel in AHU-1301; (1) Connect to existing panel LEQ15F 100/3; (2) Connect new pumps to existing MCC (2) 100/3. Disconnect switches: (1) 20/1; (1) 35/1; (1) 40/1; (6) 20/3; (1) 40/3; (1) 60/3. Motor starters: (2) 20/3; (1) 60/3. Motor connections: (3) 20/1; (6) 20/3; (2) 40/3
- Issued Jan 23, 2026
Addition and/or Alteration · FIRE ALARM: No fire alarm scope. ELECTRICAL: (1) Connect to existing 400/3 circuit breaker in existing panel G-CAM-13W-DPH-IMAG; Adjust trip setting to 150A. (1) connect to existing 150/3 enclosed circuit breaker. (1) connect to Canon PD (power distribution unit). As per 2017 NEC.
- Issued Jan 7, 2026
Addition and/or Alteration · Relocate existing UPS for drain repair Per plans
- Issued Dec 19, 2025
Addition and/or Alteration · Installation FIRE ALARM: (1) Smoke Detector. As per NFPA 72. In accordance with NFPA 72 2016 & The Philadelphia Fire Code ELECTRICAL Installation: (2) Connect to existing panels; New breakers in existing panels: (7) 20/1 & (2) 20/2. Branch: (6) Duplex Receptacles; (1) Quad; (2) Spec 20/2. Lighting: Controls:
- Issued Dec 5, 2025
Addition and/or Alteration · Furnish & install new lighting, electrical feeders & circuits associated with the new Varian unit as per 2017 NEC. Install new fire alarm devices associated with new Varian unit as per 2016 NFPA 72.
- Issued Dec 1, 2025
Addition and/or Alteration · Replace existing generator with a new generator . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Nov 5, 2025
Addition and/or Alteration · Furnish & Install Two new electrical panels. Furnish & install new elevator controllers Furnish & Install new circuits & connections for the new HVAC eqp. Furnish & Install new FA devices. Furnish & install new lighting in the elevator machine room. Furnish & install two new electrical feeders Furnish & install (1) new dry type XFMR. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Nov 4, 2025
Addition and/or Alteration · Upgrade fire alarm install speaker / Strobe qty. 8, install NAC panel qty. 1. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Oct 27, 2025
Addition and/or Alteration · Remove Existing 50Kva UPS, Install new 60Kva UPS System. Furnish and install two new feeders for the new UPS. Furnish and Install two new 3P-200A panelboards. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Oct 7, 2025
Addition and/or Alteration · Install EV charger type level two qty. 5 Install new 75 KVA transformer qty. 1. Install new 120/208 volt panel qty. 1 Installation shall comply with 2017 NEC.
- Issued Oct 7, 2025
Addition and/or Alteration · Replace existing 15kv Switches, Medium Voltage Transformers, L.V. Switchgear ATS's and (5) New Panels. New conduit and feeders. Refeed all existing loads from existing L.V. Switchgear. Add (3) fire Alarm Devices and NAC Panel to serve new Roof top structure Housing MV Switches and Transformers. (8) New LED Industrial Fixtures and (2) new Wall Packs. (5) new Duplex Receptacles receptacles. Installation shall comply with 2017 NEC and 2016 NFPA 72.
- Issued Oct 2, 2025
Addition and/or Alteration · Install lights, lighting controls and receptacles as per 2017 NEC.
- Issued Aug 26, 2025
Addition and/or Alteration · FIRE ALARM: (2) AV device; (17) Strobe; (1) Smoke Detector; (1) NAC Panel. As per NFPA 72. ELECTRICAL: (2) Panels – intercept and extend feeder to new location. Branch: (1) poke-thru; (68) receptacles; (1) Junction box & connection 20/1; (1) Auto-door connection 20/1; (2) furniture system connection. Lighting: (41) Switch & controls; (76) fixtures. Nurse call : (1) relocate master station; (1) bathroom pull station. Security: (1) Relocate card reader; (6) door release. T/D pathways: (71)
- Issued Aug 22, 2025
Addition and/or Alteration · Provide and install a new 400A CB and hardware for existing Panel. Provide and install a new 400A ATS, New 400A Panel and associated feeders as per 2017 NEC.
- Issued Aug 19, 2025
Addition and/or Alteration · Replacement of (3) existing 1megawatt Generators . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Aug 18, 2025
Addition and/or Alteration · Install new lights qty. 5, Install new lighting controls qty. 2, Install power for water heater, Install GFI receptacles qty. 2, Install duplex receptacles qty. 2, Install fire alarm devices qty. 3 .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jul 28, 2025
Addition and/or Alteration · INSTALL FEEDER AND 200 AMP ELECTRICAL PANEL WITH DISCONNECT SWITCH. INSTALL WIRING, LIGHTING, LIGHTING CONTROLS, EXIT SIGNS, EMERGENCY LIGHTING AND RECEPTACLE OUTLETS. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS.
- Issued Jul 24, 2025
Addition and/or Alteration · Install new lighting and lighting controls. Install new receptacles as per 2017 NEC and Paradigm drawings dated 7/2/2025.
- Issued Jul 24, 2025
Addition and/or Alteration · FIRE ALARM: (1) smoke detector; (3) strobes. As per NFPA 72. ELECTRICAL: Distribution: (4) connect to existing panels/provide new breakers; (1) panel – 100A/60A MCB 42P. Branch: (101) receptacles. Lighting: (50) fixtures; (2) controls. Nurse Call: (2) nurse station; (2) dome light; (3) relocate. T/D pathways: (51) Box & stub to ceiling (All cabling and equipment is by others). Security: (1) card reader. As per APPROVED DRAWINGS-2017NEC,2016 NFPA-72.
- Issued Jul 18, 2025
Addition and/or Alteration · Install duplex receptacles qty. 16, Install GFI receptacles qty. 2, Install power for FCU qty. 2. Install power for FFU qty. 3. Install low voltage switch qty. 1. Install occupancy sensor qty. 1. Install room controller, Install type A1 qty. 4. Installation shall comply with 2017 NEC. SECO job number 6145.
- Issued Jul 11, 2025
Addition and/or Alteration · INSTALL LIGHTING, LIGHTING CONTROLS AND RECEPTACLE OUTLETS. INSTALL 3 DEDICATED BRANCH CIRCUITS FOR HOT WATER HEATERS. INSTALL FIRE ALARM SYSTEM. ALL WORK TO TBE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.