Skanska USA Building INC
9 permits
- Records on file
- 9
Built (as contractor)
9 entries
- Issued Jul 2, 2026
1 units
Addition and/or Alteration · FOR EXTERIOR WORK TO INCLUDE STRUCTURAL UPGRADE TO AN EXISTING STRUCTURE. **ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**EXTERIOR WORK ONLY**
- Issued Mar 24, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EIXTING STRUCTURE. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Mar 23, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, DOORS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK.
- Issued Mar 19, 2026
1 units
Addition and/or Alteration · FOR AN INTERIOR ALTERATION TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Mar 14, 2026
1 units
Addition and/or Alteration · INTERIOR ALTERATION TO PART OF 9TH FLOOR OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Dec 17, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE OF OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Sep 29, 2025
1 units
Addition and/or Alteration · FOR EXTERIOR ALTERATIONS TO ERECT A PRE-FABRICATED ENTRANCE CANOPY AND VERTICAL METAL PANEL MAST STRUCTURE AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMIT REQUIRED FOR INSTALLATION OF ACCESSORY SIGNAGE ON CANOPY AND MAST STRUCTURE.
- Issued Aug 26, 2025
1 units
Addition and/or Alteration · FOR A STOREFRONT REPLACEMENT AS PER APPROVED PLANS
- Issued Aug 4, 2025
1 units
Addition and/or Alteration · FOR INSTALLATION OF EQUIPMENT PLATFORM ON THE ROOF TOP AS PER APPROVED PLANS.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.