  1. Issued Jun 5, 2026

    330 Oregon Ave

    Lawful Occupancy (LO) ONLY · FOR A LAWFUL OCCUPANCY SIGN FOR AN EXISTING SIT-DOWN RESTAURANT (GROUP A-2) IN AN EXISTING SHOPPING CENTER TENANT SPACE. NO ALTERATIONS WORK UNDER THIS PERMIT. **PLANS/LO PREVIOUSLY APPROVED UNDER BUILDING PERMIT 1021957 (ISSUED 11-1-2019)**

  2. Issued May 5, 2026

    330 Oregon Ave

    Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS AND DIFFUSERS WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO APPLIANCES ON THIS PERMIT.

  3. Issued Apr 28, 2026

    330 Oregon Ave

    Addition and/or Alterations · FOR THE INSTALLATION OF A ROOFTOP APPLIANCE WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  4. Issued Apr 27, 2026

    330 Oregon Ave

    Sign · FOR THE INSTALLATION OF ONE (1) FLAT WALL SIGN WITH STATIC ILLUMINATION. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK, INCLUDING ALL ELECTRICAL WORK.

  5. Issued Apr 23, 2026

    330 Oregon Ave

    Alterations · New fixtures with piping to include: 1 water closet and 2 Others (1 mop sink and 1 hi-lo water cooler. All work per 2018 PPC Section 919 Single Stack Waste and Vent.

  6. Issued Apr 20, 2026

    330 Oregon Ave

    Addition and/or Alteration · Disconnect old circuits not being reused. Existing receptacles and lighting shall be used to supply temporary power and illumination. Modification of existing panel. Demo old lighting as new lights are installed. Installation of new branch wiring for receptacles and lighting

  7. Issued Apr 9, 2026

    330 Oregon Ave

    Addition and/or Alteration · Demo out existing electrical wiring to prepare for new tenant fit out (demo only)

  8. Issued Apr 6, 2026

    330 Oregon Ave

    Signs (Accessory / Non-Accessory) · FOR THE INSTALLATION OF ONE (1) FLAT WALL SIGN WITH STATIC ILLUMINATION, TO REPLACE ONE (1) DOUBLE- SIDED STATICALLY ILLUMINATED UNDERCANOPY SIGN AND TO REPLACE TWO (2) PANELS OF AN EXISTING STATICALLY ILLUMINATED FREE-STANDING SIGN. SIZE AND LOCATION PER APPROVED PLANS.

  9. Issued Apr 2, 2026

    330 Oregon Ave

    Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocating 18 sprinkler heads

  10. Issued Mar 26, 2026

    330 Oregon Ave

    Addition and/or Alteration · Connect wall sign to existing electric GP-2026-001210

  11. Issued Mar 18, 2026

    1 units

    330 Oregon Ave

    Addition and/or Alteration · FOR LEVEL II ALTERATIONS AND CHANGE OF OCCUPANCY PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.

  12. Issued Mar 6, 2026

    330 Oregon Ave

    Sign · FOR THE ERECTION OF ONE (1) STATICALLY ILLUMINATED ACCESSORY WALL SIGN. SIZE AND LOCATION AS SHOWN ON PLANS. **SEPARATE PERMITS REQUIRED FOR ELECTRICAL WORK**

  13. Issued Feb 20, 2026

    330 Oregon Ave

    Change of Use · Retail Sales - Consumer Goods

  14. Issued Feb 19, 2026

    1 units

    330 Oregon Ave

    Addition and/or Alteration · FOR AN INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE. FOR THE CREATION OF A VANILLA BOX. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**

  15. Issued Feb 6, 2026

    330 Oregon Ave

    Signs (Accessory / Non-Accessory) · FOR THE ERECTION OF ONE (1) STATIC INTERNALLY ILLUMINATED ACCESSORY WALL SIGN. SIZE AND LOCATION AS SHOWN ON PLANS.

  16. Issued Nov 18, 2025

    330 Oregon Ave

    Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 12 existing sprinkler heads in space #340

  17. Issued Nov 13, 2025

    330 Oregon Ave

    Alterations · Replacement of 2 rainwater conductor traps in front of Space # 210A. Note stormwater traps are located completely within property lines, no work in footway (ROW).

  18. Issued Nov 10, 2025

    330 Oregon Ave

    Change of Use · Retail Sales - Wearing Apparel and Accessories; Retail Sales - Consumer Goods

  19. Issued Nov 4, 2025

    330 Oregon Ave

    Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*

  20. Issued Oct 31, 2025

    330 Oregon Ave

    Alterations · New fixtures with piping to include: 1 water closet, 1 lavatory, 1 floor drain, and 1 tankless water heater (electric). All work per 2018 PPC Section 919 Single Stack Venting.

  21. Issued Oct 27, 2025

    330 Oregon Ave

    Addition and/or Alteration · - (4) Existing emergency fixtures to remain and be re-fed - (3) New emergency fixture - (1) Hot water heater re-fed - (1) Restroom exhaust fan - (1) Power to drinking fountain - (4) Switches - (22) Outlets - (11) LED flat panel lay – in - (4) Occupancy Sensors - (1) Time Clock - (1) Power for Hand dryer - Relocate panel - Relocate branch circuits to remain to new panel location - Supply and Install 200A outdoor fused disconnect for interior panel

  22. Issued Oct 23, 2025

    330 Oregon Ave

    Addition and/or Alteration · INSTALL FOUR SIGNS AND CONNECT TO EXISTING WIRE. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.

  23. Issued Oct 15, 2025

    1 units

    330 Oregon Ave

    Addition and/or Alteration · FOR THE LEVEL II INTERIOR ALTERATIONS WITHIN SUITE 340 TO CREATE A VACANT SPACE (SEPARATE FIT OUT PERMITS REQUIRED PRIOR TO OCCUPANCY); ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  24. Issued Sep 25, 2025

    330 Oregon Ave

    Sign · FOR INSTALLATION OF TWO (2) STATICALLY-ILLUMINATED WALL SIGNS, ONE (1) TEMPORARY BANNER SIGN AND ONE (1) REFACING OF DOUBLE-SIDED PYLON SIGN.

  25. Issued Sep 9, 2025

    330 Oregon Ave

    Signs (Accessory / Non-Accessory) · FOR THE INSTALLATION OF 2 STATICALLY ILLUMINATED WALL SIGNS,1 TEMPORARY SIGN, AND THE REFACING OF A DOUBLE-SIDED TENANT PANEL. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS

  26. Issued Aug 22, 2025

    330 Oregon Ave

    Change of Use · Retail Sales - Wearing Apparel and Accessories; Retail Sales - Consumer Goods

Violations

3 entries

  1. Violation Dec 12, 2025OPEN

    330 Oregon Ave

    OCCUPANT LOAD SIGN

  2. Violation Nov 20, 2025OPEN

    330 Oregon Ave

    OCCUPIED W/O FINAL APPROVAL

  3. Violation May 20, 2025OPEN

    330 Oregon Ave

    INSPECTION, TESTING & MAINTENANCE

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.