Entity File · The Public Record
Company / LLC
Spring Garden Portfolio I Holdings LLC
1 property · $12.74M acquired · 46 permits
- Records on file
- 47
- Acquired
- $12.74M
Acquired
1 entry
Permits (as owner)
46 entries
- Issued Jun 30, 2026
Alterations · ALTERATIONS TO EXISTING MULTI FAMILY BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Jun 30, 2026
Alterations · ALTERATION TO EXISTING COMMERCIAL BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Jun 30, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
- Issued Jun 29, 2026
Addition and/or Alteration · Install (3) 100 amp panels, lighting, receptacles, switches, smoke alarms, and provide power to equipment as per 2017 NEC. Install fire alarm as per 2016 NFPA 72.
- Issued Jun 29, 2026
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Jun 26, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Jun 26, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jun 25, 2026
Addition and/or Alteration · Rewire unit to code and replace fire alarm with new to connect to existing system
- Issued Jun 25, 2026
Addition and/or Alteration · Rewire unit to code and replacement fire alarm
- Issued Jun 17, 2026
Alterations · Re-Plumb and Install new plumbing fixtures, DWV, and water pipe for two family apartment units with: 2 Water Closets, 2 Lavatory Sinks, 2 bathtub, 2 Kitchen sink, 2 garbage disposer, 2 washing machine stand pipe, 3 hub drains and 1 water heater.
- Issued Jun 17, 2026
Alterations · Re-Plumb and Install new plumbing fixtures, DWV, and water pipe for single family apartment/condo unit with: 2 Water Closets, 2 Lavatory Sinks, 1 bathtub, 1 shower, 1 Kitchen sink, 1 garbage disposer, 1 washing machine stand pipe and water heater.
- Issued Jun 5, 2026
Addition and/or Alterations · FOR A MECHANICAL SYSTEM UPGRADE TO ACCOMMODATE THE 2ND AND 3RD FLOOR OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **IMC 2021**
- Issued Jun 5, 2026
Addition and/or Alterations · FOR A MECHANICAL SYSTEM UPGRADE TO ACCOMMODATE THE BASEMENT AND FIRST FLOOR OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **IMC 2021**
- Issued Jun 4, 2026
Addition and/or Alteration · Wiring to include receptacle outlets, lighting, switches, GFCI receptacles, and appliances connecting to existing 100 amp panel and services. All necessary bonding and grounding as per 2017 NEC. No fire alarm work on this permit.
- Issued Jun 2, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 6, 2026
Alterations · Install 2 water closet, 2 lavatories, 2 shower/tubs, 1 hub drain, 1 area drain, 1 washing machine, 1 hot water heater and washing machine boxl A work to be according to the 2018 PPC and per approve plans.
- Issued Apr 28, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, CONSTRUCTION OF STAIRS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT BASEMENT AND 1ST FLOOR. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Apr 28, 2026
2 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO TWO EXISTING UNITS TO INCLUDE STRUCTURAL WORK, NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP WORK. *2018 IEBC*
- Issued Apr 17, 2026
1 units
Addition and/or Alteration · LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING DWELLING UNIT (UNIT 1R) IN THE BASEMENT AND FIRST FLOOR OF AN EXISTING BUILDING AS PER APPROVED PLANS. EXISTING BUILDING NOT REQUIRED TO BE SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**
- Issued Apr 13, 2026
2 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY CLASSIFICATION) TO SPLIT EXISTING SECOND AND THIRD FLOOR UNIT INTO TWO (2) DWELLING UNITS FOR FIVE (5) TOTAL DWELLING UNITS IN BUILDING AS PER APPROVED PLANS AND PHC APPROVAL. EXISTING BUILDING NOT REQUIRED TO BE SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**
- Issued Apr 7, 2026
Alterations · New Fixtures with piping (17) Equipment total (5) lavatories (5) water closets (3) tub/showers (2) Kitchen Sinks (2) Hot water heaters
- Issued Mar 16, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO 1ST FLOOR AND BASEMENT IN AN EXISTING ATTACHED STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, RELOCATE AND INSTALLATION OF STAIRS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Mar 13, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Jan 12, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
- Issued Jan 12, 2026
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCE AND EQUIPMENT PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Jan 6, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF AN APPLIANCE TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jan 6, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jan 5, 2026
Addition and/or Alterations · INSTALLATION OF NEW HVAC SYSTEM FOR RENOVATED UNIT 1F IN AN EXISTING BUILDING AS PER APPROVED PLANS. *2018 IMC REVIEW*
- Issued Dec 22, 2025
Addition and/or Alteration · AMEND 03-10-2026 Rewire unit Moving panel from kitchen to hallway and installing new 125 amp panel
- Issued Dec 22, 2025
Addition and/or Alteration · AMEND 03-10-2026 Rewire unit Moving 125 amp panel from kitchen to hallway in both units
- Issued Dec 22, 2025
Addition and/or Alteration · AMEND 03-10-2026 Rewire unit Moving panel from kitchen to hallway and installing new 125 amp panel
- Issued Dec 22, 2025
Addition and/or Alteration · AMEND 03-10-2026 Rewire unit 1F Move 125 amp panel from kitchen to hallway
- Issued Oct 2, 2025
Alterations · ALTERATION TO FIRST FLOOR AND BASEMENT. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Sep 19, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATION TO AN EXISTING R2 OCCUPANCY (5 UNITS) IN AN EXISTING BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, AND PROVIDE FINISHES/ FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Sep 19, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE IN UNIT 1F. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, REPAIR/REPLACEMENT OF STAIRS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED MULTI-FAMILY (4 UNIT) HOUSEHOLD LIVING. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Sep 19, 2025
2 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO INCREASE THE DWELLING UNITS FROM 4 TO 5 UNITS (R2 OCCUPANCY) IN AN EXISTING FOUR (4) STORY BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS AND PROVIDE FINISHES/ FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. AMENDMENT APPROVED AS OF 03/11/2026: FOR THE STRUCTURAL WORK ON THE ROOF PER APPROVED
- Issued Sep 14, 2025
Alterations · Add new plumbing for 1 full bathroom and washer in basement. 1st floor remodel 1 full bathroom and kitchen sink.
- Issued Aug 11, 2025
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO UNIT 3F OF AN EXISTING MULTI-FAMILY DWELLING AS PER APPROVED PLANS. EXISTING BUILDING NOT REQUIRED TO BE SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**
- Issued Jul 29, 2025
4 units
Addition and/or Alteration · EXTERIOR ALTERATION TO AN EXISTING STRUCTURE WITH NEW WINDOW ONPENING AND NEW WINDOW WELL. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 23, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE EXTERIOR WALL OPENINGS, NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES, EGRESS WELL, AS PER APPROVED PLANS. BUILDING IS SPRINKLERED PER NFPA 13R. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- Issued Jul 22, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY AT FIRST FLOOR AND BASEMENT. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.
- Issued Jul 16, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.